ML19319B929
| ML19319B929 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/17/1973 |
| From: | Harold Denton US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19319B930 | List: |
| References | |
| NUDOCS 8001290666 | |
| Download: ML19319B929 (1) | |
Text
cr JU6 1 7 B73 R. C. DeToung, Assistant Director for Pressurized Reactors, L DAVIS-BESSE Q-1 LIST PMMT NAME: Davis Besse LICE 5 SING STAGE: OL DOCErf NUMBER: 50-346 RESPONSI3LE BRANCH: PWR #4 REQUESTED CCHFLETION DATE: July 6, 1973 APPLICANT'S RESPONSE DATE NECESSART FOR NEIT ACTION PLANNED ON PROJECT: October 12, 1973 REVIZW STATUS: Accident Analysis Branch Continuing.
Enclosed is the Accident Analysis Branch Q-1 list for the Davis Besse Plant.
It is based on our review of the PSAR and our recent visit to the plant.
It should be noted that the information requested on bypass lea' sage is needed before we can determine if the LOCA doses are wit! tin the li:mits of 10 CFR Part 100.
Oddnal steed t7 IL R. Denha Harold R. Denton, Assistant Director for Site Safety Directorate of Licensing
Enclosure:
As stated ces w/o enc 1.
DISTRIBUTION:
A. Girebusso Centralfile50-346y 3
W. Mcdonald Millie Groff L-AD/SS w/ enc 1.
L-AAB S. Hamaser I
O J. Hendrie g
D
- 3. Grimes A. Schwencer DO I. Feltier n
Q D
C. Ferrell 1
(
M L d.J JL J
L%
{ L AAO^-
LISS l
emer >
.. _ _GCtf7
./J
\\.J CFerrell:jl Bjj(rimes HDenton sumut >
un. 7./.16/.7.3..
..}.7./.:"/73 7/..::/73 r
.uc.n. m..-m.uc.w one sool 290 g(
g
.