ML19319B929

From kanterella
Jump to navigation Jump to search
Forwards List of First Round Questions from Review of FSAR by Accident Analysis Branch
ML19319B929
Person / Time
Site: Davis Besse 
Issue date: 07/17/1973
From: Harold Denton
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319B930 List:
References
NUDOCS 8001290666
Download: ML19319B929 (1)


Text

cr JU6 1 7 B73 R. C. DeToung, Assistant Director for Pressurized Reactors, L DAVIS-BESSE Q-1 LIST PMMT NAME: Davis Besse LICE 5 SING STAGE: OL DOCErf NUMBER: 50-346 RESPONSI3LE BRANCH: PWR #4 REQUESTED CCHFLETION DATE: July 6, 1973 APPLICANT'S RESPONSE DATE NECESSART FOR NEIT ACTION PLANNED ON PROJECT: October 12, 1973 REVIZW STATUS: Accident Analysis Branch Continuing.

Enclosed is the Accident Analysis Branch Q-1 list for the Davis Besse Plant.

It is based on our review of the PSAR and our recent visit to the plant.

It should be noted that the information requested on bypass lea' sage is needed before we can determine if the LOCA doses are wit! tin the li:mits of 10 CFR Part 100.

Oddnal steed t7 IL R. Denha Harold R. Denton, Assistant Director for Site Safety Directorate of Licensing

Enclosure:

As stated ces w/o enc 1.

DISTRIBUTION:

A. Girebusso Centralfile50-346y 3

W. Mcdonald Millie Groff L-AD/SS w/ enc 1.

L-AAB S. Hamaser I

O J. Hendrie g

D

3. Grimes A. Schwencer DO I. Feltier n

Q D

C. Ferrell 1

(

M L d.J JL J

L%

{ L AAO^-

LISS l

emer >

.. _ _GCtf7

./J

\\.J CFerrell:jl Bjj(rimes HDenton sumut >

un. 7./.16/.7.3..

..}.7./.:"/73 7/..::/73 r

.uc.n. m..-m.uc.w one sool 290 g(

g

.