PRELIMIN NOTIFICATION - NOT FOR PUBLIC SCLOSURE March 18, 1976 PRELIMINARY NOTIFICATION OF EVCIT OR UNUSUAL UCCURRENCE
--PNO-76-44 This preliminary notification constitutes EARLY notice of events of FOSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known bv OIE staff as of 2:30 p.m. on date of this notification.
IT SHOULD BE SPECIFICALLY NOTED THAT THIS NOTIFICATION MAY CONTAIN INFORMATION THAT LATER MAY EE DETERMINED TO BE IIECCURATE OR INCONSISTENT. AN OFFICE OF INSPECTION AND ENFORCCIENT NOTIFICATION OF AN INCIDENT OR OCCURRENCE (BLUE SHEET) SUBSEO_UENTLY WILL BE ISSUED IF WARRAliTED.
Facility: Davis-Besse Unit 1
Subject:
PRESS INQUIRIES RELATED TO IDENTIFIED CABLE DEFECTS IN THE ELECTRICAL SAFETY RELATED SYSTEMS Region III (Chicago) has received numerous telephone inquiries concerning a news article which appeared in the Cleveland, Ohio " Plain Dealer" newspaper.
This article, which appeared in today's (March 18, 1976) edition, states that approximately 1,400 problems have been identified in safety related cables at the Davis-Besse Unit 1 facility.
,s i
k ~
number represents the total of both the significant and insignificant Region III personnel informed each of the callers that the 1,400 problems that the licensee, Toledo Edison Company, has found during the course of their reinspection of safety related cables. The callers, who were principally news personnel, were informed that the original NRC inspection that identified the safety related cable deficiencies was per-formed in May 1975 and that our subsequent inspections have confirmed that the licensee was not only correcting the problems, but was also con-ducting a reinspection which would not be completed for several more weeks.
NRC personnel will continue to perform followup inspections of the electrical problems. No further action beyond the previously scheduled insepctions and responding to the inquirers is planned.
This PN was originated by Region III because numerous phone calls from news media were received the morning of March 18, 1976.
Contact:
RFWarnick, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 Distribution:
Chairman Anders Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky Commissioner Rowden G. F. Murphy, JCAE Commissioner Kennedy C. C. Ka= merer, CA
,,).
0 L. V. Gossick, J. G. Davis, OIE J. A. Harris, PA
/ * ' ^ 2 'd f' ',
B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA c
K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted:
P Bldg 8 184 ;
HSt'7.'8(,;
MNBB, N t [; Luge ;)?)6[ d.
PRELIMINARY NOTIFICATION - NOT FOR PUBLIC DISCLOSURE 800129 4 7 c
PN o /f y
~
~'
,m Facility: Davis-Besse Unit 1
Subject:
PRESS INQUIRIES RELATED TO IDENTIFIED CABLE DEFECTS IN THE ELECTRICAL SAFETY RELATED SYSTEMS Ccue ay) hz,7 Region III received numerous telephone inquiries concerning a news 4
article which appeared in the Cleveland, Ohio " Plain Dealer" newspaper.
This article, which appeared in today's (March 18, 1976) edition, states that approximately 1,400 problems have been identified in safety related cables at the Davis-Besse Unit 1 facility.
Region III personnel informed each of the callers that the 1,400 number represents the total of both the significant and insignificant problems that the licensee, Toledo Edison Company, has found during the course of their reinspection of safety related cables. The callers, who were principally news personnel, were informed that the original NRC
- inspection,that identified 7 safety related cable deficienciesA was per-Normed in May 1975 and that efu$fe subsequent inspections have confirmed M hat the licensee was not only correcting the p.r.ohlems, BU('Yonducting
- Z h reinspection which would not be completed for several more weeks.
ohtr4heMuquiress-is Aanned.
bbutact: D b. Hunnicutt h,
D. M h nicutt James'GN Kepple'n K
Preparesig N Branch ChibE_
Regional DItecto k h
p e rkr~
k il - p k rp ec %
B RC pernnel will che ei L
ele c klc.el p,eblem s.
No fur b, a ch en Ley nd' s hrpw w w J,,sy m.;,,,
p a aws/y
.r c iwJ u tad
& m i
on p air e u u
p ix,, n).
er if in del dkn Re?~a n
, e,e c s a s e-Thh PH w.u p,h p n e a,/4xd= mern9 n
~ ~,
..:.. u
..MQ v a - en us ph m e c.J p
i IM 7,ck i2, i 9 74,
b v
,- _