i V. E. Vetter, Chief, Reactor Construction Branch, RO:III I
i' TOLEDO EDISON COMPA.\\T (DAVIS-BESSE) - DOCET NO. 50-346 DG'RC?ER TACK WELDS FOR CLASS 1 PIPING I
i The liccasce sub;itted a final report of the subject, dated February 12, 1973, in accordance with 10 CFR 50.55(c).
The l
report was prepared by Grinnell Corporation and was dated January 19, 1973. RO's evaluation of this report is con-tained in the enclosed ce~o from Potapovs to Henderson dated i
" arch 3, 1973. It appears that the nondestructive testing l
of the affected welds provides reasonable assurance that the wolds are sound and acceptable.
20 proposes to audit Grinnell Corporation in the near future j
to verify that procedures have been inplemented to prevent recurrence of this code nonconforr.ance.
I J. B. Henderson, Chief Construction Branch Directorate of Regulatory j
Operations I
Enclosure:
As stated t
l cc:v/ancl.
F.E.Kruosi, RO f
D.F.Knuth, RO R.H.Engelhen, RO J.C.Keppler, 20 k
3.H. Crier, RO:III l
Local PDR i
PDR j
DR Central Files bec:w/ encl.
CDR-52 file
,,f l
.R.b[$#
omer >
l DEWitesell/
.r x-745_1 mib JAR (ggypn
' ?~ ~
j sunums,
l
\\
3Lul.L3 ll 3
N
.mn >
8 0 01290 Of g
-