ML19319B885

From kanterella
Jump to navigation Jump to search
Notifies That FSAR Completeness Is Acceptable for Review
ML19319B885
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/04/1973
From: Knuth D
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001290609
Download: ML19319B885 (1)


Text

.

m...

l t

^

t l

4 '973 i

Richard C. DeYoung, Assistant Director for Pressurized Water Reactors, L PRE-DOCKETING C0.'PLETZ'IESS REVIEW OF DAVIS-3ESS" TJCLEAR PO*JER STATIC'i i

Plant Name: % v's-Besse Nuclear Power Station i

Licensing Staze. OL Docket No.

50-346 3 ranch and Project Manager Requesting Assistance:

H. Faulkner, PWR-1 i

Technical Review Branch Involved: Reactor Systems 3 ranch Raquested Conpletion Date: January 3,1973 Description of Review: Pre-Docketing Co::pletaness Review 2eview Status: Acceptabl.-

Reference:

Letter; R. C. ",eYoung, A/D for PVRa, L, to J. 3cndrie, D/D for Technics' Review, L, and A. Braitman, Chief, Of fice of Antitrust ", Inden:nity, ' Toledo Edison Cormany - Davis-Bes.-

Nuclear Power Station."

i In accordance with the request presented in the referenced letter, the Davis-Besse FSAR has been reviewed for conplateness. The findings of tht, review are that it is acceptable as presented. Cencrally, we have concluded that there is sufficient information provided to initiate our review.

t

-n a:wl by.

o Don.ud F. *laudt ;

j Donald F. Knuth, Assistant Director i

for Reactor Safety i

Directorate of Licensing i

cc:

A. Giambusso, L:EP W. G. 'fcDonald, L:0PS S. H. danauer, DRTA J. Hendrie, L:TR on m

i D. Vassallo, L:PWR-1 0

0)I H. Taulkner, L:PWR-1 ov D. F. Knuth, L:RS 4

{

V. Stello, L:RSTS D

9I

.. S

_ k T. Novak, L:RSTS U

a i

(SEE PREVIOUS CONC RhENCE) j

)

i

  • 00129'o[0f gi

.