Text
_
f LICENSEE EVENT REPORT
.(
Cournot atoCic l_ L I I I t_j l
G TNP g"w' p" ae LeC E Nst wu=*og a i lj l 013 i is l 0L-J 010 i Ni PIF -1013] l 4!11 l l0 1
$,10lHID!B1511j l
a
.5 e smi i.
C A, e c o./100" ' ".',*.2" '
noC y,
~u....
. w,s. ne i,
.c...,o...
o i Corti i -se T [W t 0 l 5 t 0 t.-; 0 3 4, 6 1 10 f 8 t116 !717 I. 0191119I71 7; i iL I Li 1 1 sa si se as a.
is a
i avewr ut scaiPrios 81 Diesel Generator 11 was inoperable.
It started =anuallys but automati-
~
l cally shutdown on overspeed. It then would not restart =anually. The a es a
g[ DC field would not flash. The speed switch was defective. This is not t
es
.2 ggg a repetitive occurrence.
(NP-33-77-56).
7 89 33
@L I
o$" [rN[
( m" '
u a7u"* a c~t u'a'r a Co *come aev Coor S u n.c voos a r eon
@ fF1r! (IJ ICIKITIBIR1Kt LAJ I X 19 1919 I 7 a3 no si 12 il 42 44 as 44 CAUSF oESCRIPfloN a te i The cause of the_, defective soeed switch was component failure. 3urned l
99 w
loj2j l resistors and shorted diodes were found in the switch. The switch was s
7 89 33 81 reolaced.
I 7
89 42 s'iDs u
s cows e ove*te sTaruS ussco av oa9CovC nv OLSCnirtiow Lsj
[01010t ]
NA l
CLJ
[d,_NA j
i i i 0 9
to a2 iJ ea et a
30 af D os s'
g aucunes or actewstv LOCAviomeratttast
[g, [-ZJ l NA I
l NA l
7 8
9 to is
- A es aM PtnSofeNEL L EPO$URE$
eeu=*ue s ' Twer op.sceseOM
@l0f0131 [Zj l NA I
L9 2
i2 P(R$oNN(L ANJutut5 N uteet s n t sc e.p t eon 8 1010!01 i NA I
r, a3 is ia w
o8F5iftCoN$toufNCES 1 NA I
I 3 3)
LOSS ori Dawact to F ACILif v tvPC otSCeses so e 3,.t ZJ L NA
.I r
r PUSLiCITV G l NA l
ae
.3 AOOsticasAt F ACTURS l
l NA 7 89 na i
]
31
~
Jacque LingenfelCer/ S. Vallade (4197 ' 259-5000, Ext..13 1 8001270kbhk
s TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR P0k'ER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-56 DATE OF EVENT: August 16, 1977 FACILITY: Davis-Eesse Unit 1 IDENTIFICATION OF OCCURRENCE: Diesel Generator #1 was inoperable.
Conditions Prior to Occur ence: The plant was in Mode 2, with Power (!ST) = 0 and Load ONE) = 0.
{
49...,,.
Description of Occurrence: At 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br /> on August 16, 1977, the Davis-Besse Station received notice of a tornado which had touched dcun in the East Toledo area, and was heading in an easterly direction (teward the Station).
In anticipation of the loss of switchyard capability (off-site power) in the event of a tornado, Station personnel tested the E=ergency Diesel Generators at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br />.
Diesel Generator #2 was started without incident. Diesel Generator #1, however, would not start manually; it automatically shutdown on overspeed. The DC field j
would not flash. The station entered Action Statenent (a) of Technical Specif1-cation 3.8.1.1.
The tornado did not =aterialire in the area of the Station, and the tornado warning was cleared at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br /> on August 16, 1977.
Designation of Apparent Cause of Occurrence: The cause of the event is att ributed to component.f ailure in the speed switch for Diesel Generator #1.
Burned resistors and shorted diodes were found in the switch (Model #ESSB-4AT).
It was replaced and returned to the manufacturer, Synchro-Start Products, Inc.,
a division of Knowles Electronics, Inc., for repair.
..;4..:
Analysis of Occurrence: There was no'cange-Oo the health and safety of the public or Station personnel. Off-site powcr v a not lost, and Diesel Generator
- 2 was operable and able to handle Station loads if necessary.
Corrective Action: The defective speed switch was replaced, and Diesel Generator f/1 returned to service on August 17, 1977 at 0740 hours0.00856 days <br />0.206 hours <br />0.00122 weeks <br />2.8157e-4 months <br />. This removed the Station from Action Statement (a) of Technical Specification 3.8.1.1.
I The cause of switch failure will be determined in conjunction with the vendor.
Failure Data: There have been no previous similar occurrences.
p,.