ML19319B788
| ML19319B788 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/12/1977 |
| From: | Lingerfelter J, Vallade S TOLEDO EDISON CO. |
| To: | |
| Shared Package | |
| ML19319B691 | List: |
| References | |
| NUDOCS 8001270256 | |
| Download: ML19319B788 (2) | |
Text
O LICENSEE EVEtr REPORT p.
b
,l,_ L j I !
!__j Comraos stoC=
Naut
~'
L Ct wst Nuwet e i v et t v"pt
@]9[0lH I DIB i S ilj 10 j,0L j Ol 01 NI Pl{l -10 ; 3l l4 l
t jl l l[lj OJ 3{
la ' 15 25 2G s0 t
7 CattCom'
- L
- **
- C P OnCut t Nuuet a r gt h e ria t t etpost cas t p0iCovit y L
lWL_J [01 50._i 0 3l4 1 6 i t 01 8 11;2 1 7l7 1 10 91 11 Lj 1
1 27 17j t
Si ha 59 6a 68 69 7e 75 60 (vtNT Of SCRsPf tom g: The Absolute Positi,on Indicator (API) for Control Rod 4 of Group 4 was l
7 89
@l inoperable. The indicator light for Rod 4 showed that it was 100%
8 89 8 1 withdrawn, but the indicator itself had a fluctuatine readine. This is l
7 89 E Lnot a repetitive occurrence.
OTP-33-77-63) 1 7
89 8L 1
[n"n't
@ l b"t" t e"'
u =7uYa"c"eYn'r a coucows new coor supp voos A reon i [Ej iItNISITIR1Ui
[10
[D 11 I 51 01
[NJ 3
s9 to in 12 17 43 44 47 48 CAUST DESCRIPiioN l Instru:nent and_Cggt.r_o_1 Technicians found that a relay in the Position I
9 l Indicator Panel was defective.
It was replaced by the vendor.
l' 84 e9 O
@ l,
'd
.o c.wis-
.u= :
8 LBJ l0101Gl iga.. _
.. c o... e t s.
..t._
l LAJ
[.. NA J
7 0
9 to 62 1
44 dt 46 80 et D os a'
t m uovM t or A C T e v81.
LZJ, LZJ l NA I
l NA l
LoCatsom ce atttASC 7
3 9
10 Il 44 45 80 PtnSoNNEL EzPoSUAE5 uwwe e
- t vet or se ssatoom Li!3J1 O f 0101 (ZJ l NA 7
89 68 12 13 J
60 Pf nsoaeNEL INJUNIES
~ uw a c..
ni se.....o~
8101 Of 01 1 NA i
1 e) in is 80 o9 9 581t CoNstout NCEs aM Lo35 oM DauaGE la F ACILOIV e w PC ot % C a s* t io**
P. I,IJ L 8^
ar PuttsCITY 8 I n.s I
> e9 A3 ADD 11 TONAL F ACTOR $
31 NA l
s SJ
- 31..
I p
i sa to Jacque Lingenfelter/ Sue Vallade (4197'259-5000, Ext. 251 DVR # 095-1,129-1 8001270
TOLEDO EDISON COMPANY
(
)-
DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION
/
SUPPLEMENTAL INFORMATION FOR LER NP-33-77-63
_DATE OF EVENT: August 12, 1977 F_ACILITY: Davis-Besse Unit 1
_IDE!TIIFICATION OF OCCURRENCE:
Rod 4 of Group 4 was inoperable.The Absolute Position Indicator (API) for Control Conditions Prior to Occurrence:
The plant was in Mode 2, with Power (MWT) = 0 and Load (M Tr) = 0.
Description of Occurrence: At 1910 hours0.0221 days <br />0.531 hours <br />0.00316 weeks <br />7.26755e-4 months <br /> on August 12, 1977, the Absolute Position Indicator (API) for Control Rod 4 of Group 4 was inoperable. The Control Room operator could not determine Control Rod 4 position within + 6.5%
This placed the Station in Action State =ent 3.1.3.3.
(a) of Technical Specification The indicator light (relative position indicator) for Rod 4 showed that it was 100% withdrawn, but the API reading fluctuated frem 70-100% withdrawn.
the indicator lights and API readings for the other reds in Group 4 shewed 100%
Since thdrawal, it was suspected that the API for Rod 4 was defective Designation of Aeoarent Cause of Occurrence:
Upon investigation, Instrument and Control Technicians round that a relay in the Position Indicator Panel was defective.
Dianond Controls.The relay, along with connecting cable, was replaced by the vendor, Analysis of Occurrence:
public or Station personnel.There was no danger to the health and safety of the The cont nl red was m-+= Thy aligned with the group, and relative indication was still operable.
properly.
The cvuisol rod was operating t
Corrective Action: On August 13, 1977 operability to the API for Control Rod 4the relay was replaced, returning Statenent (a) of Technical Specification 3.1.3.3.This removed the Station from Action
,_+
5 I ;
- i Failure Data:
There have been no previous similar occurrences.
.e
/~~N
{
I
}
{
x x./
t i
g e
a b
I
.