RO NP-33-77-41:on 770810,auxiliary Feed Pump 1-2 Removed from Svc to Implement Wiring Change Reducing Relay Contact Amperage Per Facility Change Request 77-199. Wiring Completed & Feed Pump Returned to Svc on 770810
ML19319B775
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/06/1977
From: Batch S, Lingenfelter J
TOLEDO EDISON CO.
To:
Shared Package
ML19319B681 List:
References
NUDOCS 8001270245
Download: ML19319B775 (2)


Text

- _ . . _ _ ____

_ _ . . _ - . _ . _ e ,- .m .:, . ,.

~

i y/ LICENSEE EVEtJT REPOfiT g Contriot etoCx l,, L, I l ! l__j err e <,..s...,.... on:r< c,a:r g,io !H I DIE j S ll] 10 j _0jd O! 0 l Ni P :P i-10 l 3] ..pljl_1 j 1

! l-L ptq.

84 Ts o CA.,oo. e m t' r.= ; oo , . . t .

n.~,,,.., .<.C.,o...

con'1( l, 1 5 1 01.-; 01 34;6 1 0;8 1 1; 0; 7;7 l [ 019l 01 6Q t VE 4I Of SCnie TeoN ggi Removed Auxiliary Feed Pump 1-2 from service at 0545 hours0.00631 days <br />0.151 hours <br />9.011243e-4 weeks <br />2.073725e-4 months <br /> ob August 10t_,i h;'1977toimplementawiringchangerequestedbyFCR77-199. hnit was in ;

P 89 -

en gg [ Action Statement of Technical Specification 3.7.1.2. The wiring change j r os s

@ [ was completed and the pump tested and declared operab_le by 2355 hours0.0273 days <br />0.654 hours <br />0.00389 weeks <br />8.960775e-4 months <br /> l 3 s2 tc g Lon August 10, 1977. __

(NP-33-77-41)  ;

- ' " " '^ c oo,.n , ~ . c o or (N5k!'k;" u.2'.f*;'c'?d'o'. v.o. . . .o

@ D t.d'j l cnT/ LJB IZ l ZIZ I ZlZ l ZI UL I Z IZ I Z ! ZI LNJ 7 a9 to at 12 17 4J e4 47 46 CAust Ot sCRIPTION os [ Deliberate entry into Action Statement to perform wiring change. Wiring [

g dlchangewillreducerelaycontactamperagetopreventcontact failure. 9

/ 7 89 k

ar)

I 1 89 \ ,s2 S t E'tus'  %

  • owe se on e.t e Sta tus o s'c E av 06Covt a v OL %C n srf soa.

ED0 7

LB_t 9

tB00 ! 01 12 a l l_1A 63 I LAJ LNA '

44 4% 46 a'C l 't" ?' ,,o,a,,tiLASL

.a..vstgAgto , . . . , <'

a ur?uNt of ACl ev8t v LOC A t to4 cr e.( L 6 A%C

'@i] [ Z_J , [-ZJ l NA 1 l NA  !

s a 9 to a .4 45 60 Pt 8450*r4EL t ur*;5Uat$

1 3 {0 l0j J

7 89 la 12 t3 so PE.15oNNEL trou' TIE 5

~

8 0e ITA'8tai iM'""

1 e,

~ ,,

j Of8 Sit

%. %' "^ t CON 5E Oct avCE S J LOSS oH O'uAGE 10 8 ACILilv ev ot S c a se t eoas Eg z_PC goNA a eg 3 ,

. g i --

PUBLICITV 3.lNA

> 9 m

l ADOlt toaeAt e ACTUns 8.

> L. NA ,jo, s

w M, ,, !,. _ , _ - - - . _ . . . . . . _ . _

_ . . - . ,. l Jacque Lingenfelter/ Stan Batch (419) 259-5000, 2xt. 251 goo 1 2702 6

_ ___ _. -:-_  :. . a . . .

_ .a _ .

-_a_~ , . .

N TOLEDO EDISON COMPANY

^

DAVIS-BESSE UNIT ONE NUCLEAR POWER STATI'ON SUPPLEMENTAL INFORMATION FOR LER NP-33-77-41 DATE OF EVENT: August 10, 1977 FACILITY : Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Auxiliary Feed Pump 1-2 inoperable to implement wiring change of FCR 77-199.

Conditions Prior to Occurrence: The plant was in Mode 3 (Hot Standby), with Power (MWT) = 0 and Load (MWE) = 0.

Description of Occurrence: At 0545 hours0.00631 days <br />0.151 hours <br />9.011243e-4 weeks <br />2.073725e-4 months <br /> on August 10, 1977, Auxiliary Feed Pump *

(AFP) 1-2 was removed f rom service to implement a wiring change per Maintenance Work Order MWO 77-1658. This wiring change was to reduce the relay contact amper-age to prevent relay contact failure by placing an additional relay in the cir-cuits which operate the speed changer motor, s This placed the station into the Action Statement of Technical Specification

) 3.7.1.2 which requires both Auxiliary Feed Pumps to be operable in Mode 3, Hot Standby.

Designation of Anoarent Cause of Occurrence: This was a deliberate entry into the Action Statement to perform the wiring change as was requested per Facility Change Request FCR 77-199. ,

Analysis of Occurrence: There was no threat to the health and safety of the public or to station personnel. Auxiliary Feed Pump 1-1 was available to supply auxiliary feedwater if needed.

Corrective Action: The wiring change was completed, the AFP tested and declared operable by 2355 hours0.0273 days <br />0.654 hours <br />0.00389 weeks <br />8.960775e-4 months <br /> on August 10, 1977. This removed the station from the Action Statement of Technical Specification 3.7.1.2.

AFP l-1 wiring change was completed on August 9,1977 at 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br />. The wiring

, change was implemented while AFP l-1 was inoperable from 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on August 7 to 1250 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.75625e-4 months <br /> on August 9. See NP-33-77-52.

Failure Data: Failure data reported under LER NP-33-77-52.

~