Responds to NRC Re Violations Noted in IE Insp Rept 50-346/78-13.Corrective Actions:Personnel Informed of Importance of Proper Review of Surveillance Test Results & Adherence to Procedures
ML19319B772
Person / Time
Site: Davis Besse 
Issue date: 07/24/1978
From: Jeffery Grant
TOLEDO EDISON CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19319B633 List:
References
NUDOCS 8001270242
Download: ML19319B772 (2)


Text

.,

'wd

' HREDO

!b5C IN July 24, 1978 JAMES S. GAANT Docket No. 50-346 va. on.a n Eners,Supos, License No. NPF-3 msn ass. sass Serial No. 1-25 Mr. Gaston Fiorelli, Chief Reactor Operations and Nuclear Support Branch, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Fiorelli:

Toledo Edison acknowledges receipt of your June 28, 1978 letter and enclosures, Appendix A and Report 78-13, referencing an apparent deviation from Davis-Besse

/

)

Nuclear Power Station Unit 1 co=mitments to the NRC listed as an " Infraction"

\\,'

in Appendix A.

Infraction: Technical Spec!fication 6.8.1 requires that written procedures shall be established, implemented, and malatained.

Contrary to the above:

1.

The performance of requirements of ST 5013.03 on March 30, 1978 were not properly documented.

2.

The performance of requirements of MI IL-1701 used in asso-ciation with maintenance work order I&C 753-77 were not properly documented.

3.

Shift foremen were not recording tests completed to demon-strate post maintenance operability on maintenance work orders per the requirements of AD 1844.00.

Examples are MWO's I&C 277-78, I&C 738-77, and I&C 77-0973.

4.

AD 1838.02 requires the shift foremen to review completed surveillance test and take any action required to meet Technical Specification requirements. On ST 5031.14 per-formed November 1, 1977, the shift foremen failed to note the test deficiency and take the required Technical Speci-fication action.

, ~.

/

)

\\(,-l JUL 3 I1978 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLECO, OHIO 43652

@001270, yQ

[

e-~

r s_,,/

Mr. Gaston Fiorelli Docket No. 50-346 Serial No. 1-25 July 24, 1978 Page 2

Response

In each of these cases above, personnel were not following approved management controls. The individuals involved with each of these four cases have been informed of the seriousness of events of this nature. In addition, designated reviewers have been informed of the importance of a proper review of surveillance test results and AD 1844, Maintenance will be revised by July 30, 1978 to more clearly define the applica-bility of post maintenance operability.

Generically, we feel our management systems are adequate and we will continue to insure their implementation. This matter has attention and involvement at the corporate vice-presidential level.

All station personnel have been informed of the importance of

'g adherence to procedures by memorandum on July 24, 1978.

In

)

addition, the need for adherence to procedures was addressed in our training program. However, in view of the present situation, we have established a program to place a greater emphasis on adherence to procedures in our training program.

Management has requested that all failures, to properly implement management controls, be immediately brought to their attention for corrective action.

s' i

Yours very truly,

((

96 James S. Grant Vice President, Energy Supply TDM/WHG/pm O