RO NP-33-77-37:on 770804,control Room Emergency Ventilation Condensing Units Deliberately Removed from Svc.New Overload Heaters Installed Increasing Condensing Unit Size. Ventilation Sys Returned to Svc on 770804
ML19319B768
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/30/1977
From: George T, Lingenfelter J
TOLEDO EDISON CO.
To:
Shared Package
ML19319B668 List:
References
LER-RO-770830, NUDOCS 8001270236
Download: ML19319B768 (3)


Text

..

  • n V

LICENSEE EVENT REPORT I

con rnut etecac I,, L j l ! l_j 8

G

f.'a':A' '

' 'H,T '

',"J,T t.C c u

.,w

. a t lj ll l lj l 013 I

@]3I01111 DIB 1 S 11 j 10 l_@ld O! 01 E "ir f -10 ! 31 I4 l

A 3

N 7*

I$

J ',

.\\,

[n'eE*N noC at t Nuwet a tys.

ereest stree t c,a t t C a s t coa

  • L r,,co,nt tj iti t.(LJ t0t5 1 0 t.-; O 3 4 1 6 i

@j8j o ! 417;7i 101 8 ;3 1 0 7 i7 i i

sr v,

'Tr

~

si 6a e,s i.

,a E vtNT Of 5CntPYtoM '

g ; Deliberate entry into the Action Statement of Technical Specffication g

7 89

's3 8(3.7.6.1 to replace the overload heaters in the condensin:: units. One at i

e9

..c,

[Ej!a time, the Control Room E=erzency Ventilation Units were removed from e4 ea 8.3 lse vice, overload heaters reolaced and the unita raenrn.ad en a a '- f < -

I 7

b 's

-)

@ (within twenty minutes.

(!'F-33-77-3 7).

7 89

&aiwt rc e

vY[C"vYn'r et

[nY cn=coeve N' C o r)s S v **

E diL'" Lj iZ; ZiZ;ZlZjZj (Aj l Z1 Z l ZiZj

[NJ I*

tem voce av eCN

/

F s a o so ss s2 na sa

<u

<e f

cAu$r ot:cairtion g [A system revision which increased the size of the condensing units i

es u

g [' necessitated the increase in the overload heaters.

j i

l 7

89 cc

~>

81 a0 r

7 89 i

$ iEIUS

^

s cows g ovest a S ta tus o sc0 av utsCovt nv ot v.nirtione 8

(JJ i 010t et l NA 1 ( AJ

[,NA_

j

)

C 5

to L2 43 44 4%

d6 E0 e sp.u os ac f ave t e c on t r e. r sof Lt Ast o os ne i tan aucuNs or act evety toCas so.e C.r at LE ASC Ei) tj;j. [Zj i NA I

l NA j

i 3

9 to it

  • 4 45 60 PE 8150NNEL E xPoSuatS esvuus e 1**t OF. 5C e **T'oM

@ l010101 LZ1 1 NA I

7 89 al 12 IJ M

f Pt risoNN E L Ir< JU54815 av v%e n t s.

OL SC aset ecN

@ l,_01 DI 01 l NA 7

0 4I LJ N

of F 5811 CoNSE oV(NCE5 l NA

]

Losi Ort o AwacE 10 F ACILITY s y r'C Ot S C 9 68 t so**

@ bl \\o NA o

Ptr8LtCITY

@ l NA l

.9 u

ADOlllOas AL f Actorts

@ l.NA

.i 1

u)

F, F11 ----

__. _ g' s

,, 3 Jacque Line,cnfelter/ Tom George (419)~259-5000, Ext. 231 8001xyu23C 7

i i

TOLEDO EDISON CCMPANY Q

DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR IER NP-33-77-37 DATE OF EVENT: August 4, 1977 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Deliberate entry into the Actic7 Statement of Technical Specification 3.7.6.1.

Removal of the Control Room Emergency Ventilation Condensing Un cs trem service, one at a ti=e.

Conditions Prior to Occurrence: The plant was in Mode 3, with Power (MWT) = 0, and Load OS~E) = 0.

Descriction of Occurrence: At 0940 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.5767e-4 months <br /> on August 4, 1977, one control Room Emergency Ventilation System Condensing Unit at a ti=e was taken out of service to install new overload heaters. The inoperability of these condensing units caused the Control Roon Emergency Ventilation System Trains 1 and 2 to be inoperable, one at a time. This action caused the Station to enter the A -ion Statement of Technical Specification 3.7.6.1.

I d

Designatfor mf Aeparent Cause of Occurrence: The condensing units were taken out of service to install new overload heaters. The new overload heaters replaced the originals which did not mee. the new system requirements becauce at a system revision which increased the size of the condensing units.

Ana:ysis of Occurrence: There was no threat to the health and safety of the public or to station personnel. One Control Room Emergency Ventilation System Train was operable at all ti=es.

Corrective Action: Both Control Room Emercancy_ Ventilation System Trains had the new overload heaters installed. Both Control Room Emergency Ventilation Systems were run, tested and declared operable at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on August 4, 1977.

This removed the Station from the Action Statement at Technical Specification 3.7.6.1.

The overload heaters have now been replaced; therefore, the cause of this occurrence is not expected to become repetitive.

Failure Data: No previous similar events have occurred.