RO NP-33-77-53:on 770804,auxiliary Feed Pump 1-2 Discharge Valve Indication & Control Lost.Caused by Terminal Board Crack Causing Ground in Speed Switch SS-816.Ground Repaired Temporarily on 790805.Terminal Boards Will Be Replaced
ML19319B767
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/30/1977
From: Hitchens D, Lingenfelter J
TOLEDO EDISON CO.
To:
Shared Package
ML19319B666 List:
References
NUDOCS 8001270234
Download: ML19319B767 (2)


Text

- __

U h

  • i.ICENSEE EVENT REPORT CoNfnotetoCm ((j l l l [

i o

  • "t LectNst eeuwet a v v e"[ iNe"[

810lH s I DIB I Silli.- isl0j0j-j010t NIP 1F1-l0; 3las l4.m1ljll1;1 1 e2 i

lgi u C . , e c o. ."I'?" ' "'e 's?" ' noC c , eeu..L . E se ,* , n. . . .cpo.,o.,e o D Covit ii gL [L (0:5 1 O ! -; Oi 3 l4 1 6 1 1 Of 8,0 ;4 ;7 i 7j . ;0 1 813 1 07i 1 7 i 53 tua 9 6i 68 69 Ja 75  %

(VENT Of1CRIPf tose

@) At 1420 hours0.0164 days <br />0.394 hours <br />0.00235 weeks <br />5.4031e-4 months <br /> on August 4,1977, indication and, control of Atixiliary Feed ,

i a> $)

g l Pump 1-2 discharge valve was lost. This placed the station in Action

es .

81 Statement of Technical Specification 3.7.1.2. Power was removed from the",

7 e9 *3

@ l valve and AF 388 was manually opened at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> returning Auxiliary ,

7 e9

3. { Feed Pump 1-1 to operable status. (NP-33-77-53) ]

ITA"" "'nW cn- n~, ~ co n, ed,~.5c i

.~'

~~-

g X}.Ie"h lc4%"' ,;

,,,, ,eo.,

El ciW.I LjE iI I 4 SIT l RUl I [AJ h,g 7 e9 10 33 12 ) 43 4. ,;

~

CAU5F OESCRIPTICM l An electrical ground was found which was caused by a crack in a terminal l

/~5 bl' board. The terminal board will be replaced. .

1

( 7 89 g3

./ I - I 7 89 .3

%s u's  % Po o av 8 LBJ ID i EY aJf I fae net a S t a tuS i L3Jut L

NA 0:5Covt av OtACa'rf eone I

7 0 9 io 62 13 44 di 46 e0 to e v co etees at48 0 os n t a gg a ucuaet or aCteve,y LOCa ticae ct etLCASC 3 e 9 so It 44 es a Pt nSoNNE L E xFoSURES tvet e mievion

@les UUDue mIOf 7

I si i2 L3ordA 1

ia i

3 P(R$oNN(t INJUHI($

NUwOC E Ot %C aeef rom ia 1 Of 0! 01 1 NA l 7

el in ia ,3 of asett con $touf NCES

~

3 .

Lo35 cM OauaGE TO Fac!Lif y

  • svPt ot S t a se n sone i ep go NA ,

g l -

PUS LIClf v di r es NA ,

anoettome AL e actors

, g NA -

y

. .I e ~

a,4*,,e Jacque Lingenfelter/ Dean Hitchens ,

(419J 259-5000, Ext. 251 DVR 079-1 8001270 M i

m 1

TOLEDO EDISON COMPANY Q DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEME'1TAL INFORMATION FOR LER NP-33-77-53 DATE OF EVENT: August 4,1977 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Auxiliary Feed Pump 1-2 inoperable due to ground in speed switch SS 816.

Conditions Prior to Occurrence: The plant was in Mode 3, with Power (MWT) = 0 and Load (MWE) = 0 Description of Occurrence: On August 4, 1977, at 1420 hours0.0164 days <br />0.394 hours <br />0.00235 weeks <br />5.4031e-4 months <br /> while Operations per-sonnel were running Auxiliary Feed Pump (AFP) Turbine 1-2, control of discharge valve AF 388 was lost. This placed the station into the Action Statement of Tech-nical Specification 3.7.1.2 which requires both Auxiliary Feed Pumps to be operable in Mode 3, Hot Standby.

A Electricians investigated and found the control power fuses blown to the valve.

l 1 They replaced the fuses and Operations personnel stroked the valve. The fuses

\s /# blev again. Power was then removed from the valve and AF 388 was manually opened at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on August 4,1977. This returned AFP l-2 to operability and removed the station from the Action Statement of Technical Specification 3.7.1.2.

Designation of Apoarent Cause of Occurrence: The cause of this occurrence was determined to be a ground on the terminal board of Auxiliary Feed Pump Turbine 1-2's speed switch, SS-816. This switch will open the valve when the speed reaches approxi-mately 2800 RPM. The ground was caused by a crack in the terminal board.

Analysis of Occurrence: Since AFP l-1 was operable, there was no danger to the health and safety of the public or station personnel.

Corrective Action: A work order (IC-434-77) was issued, and the Instru=ent and I Control Section temporarily repaired the ground on August 5,1977. Operations per-sonnel then successfully stroked the valve three times using the speed switch. A second work order (IC-501-77) was issued to replace the faulty terminal board and to inspect the terminal board on AFP l-1.

Failure Data: No prior events have be'en caused br a failure of a terminal board.

/