RO NP-33-77-40:on 770802,containment Isolation Valve Rc 240A Would Not Stroke When Cycled.Caused by Design Problem Causing Strain on Motor Operator.Hanger Readjusted
ML19319B761
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/26/1977
From: Lingenfelter J, Vallade S
TOLEDO EDISON CO.
To:
Shared Package
ML19319B654 List:
References
NUDOCS 8001270225
Download: ML19319B761 (2)


Text

. .

-s

h-LICE:JSEE EVENT REPORT CoNinot stoCm i ,

[_ j ! I fj c

awt L.C ENSF Nuwot e t et t et 8 ,10lH 1DIC1S11]i.- is10jOj-J 010i N!P]F]-l01 31 n m l 4llt1 1 1l1.Jo bt 03 ,3 $ I

c. . . co ."13t ' ".',*.2"; oo c n , u... . . s e . ,,. . . .c ...o...

p0 icon 54i t_f_j gL igt (0:56a1 O t ._ t 0,34 1 6J 1 1 08! 1 ei 2 1 717j 1 0 ;8 1 2 i6 17 j,7 S8 9 ed 69 la FS 7 EvtNTUf5CRsP1'ON

  • g gat 0945 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.595725e-4 months <br /> on August 2, 1977, an operator attempted to cycle Pressuri g i ss , ou g lzer Sample Valve RC 240A. for the purpose of obtaining a water sample for [

as e g gthe station Chemistry Lab, but it would not stroke. The valve was inopera7 7 9i w

[ggi ble. (NP-33-77-40). l 1 ,v w 8L

> ss ..... ,,3 i

eo~""~*~'

'75o n'A' co en~, . c oo, olx[~5.o;aZ] ,,o,N, , , , , , , .

@E LIJ. h_"J LBJlV I Al LIV i 0 I Pi u~~I

( j, i Z j Zi (J 7 89 10 t? 12 17 43 44 43 4a CAu*f OtScan 'ItON

@ lThe caust r,f the. occurrence is attributed to a design problem with a j

) R $ g

@ ! spring hanger for thermal expansion which caused the failure of the motor ]

operator. "',

7 89 g,3 g e EIs u seewf* o s set . sv a t us o scow Av osscovC av ntscnervion EE0 LB.J 10101 DJ LIJ NA I A LJ L,A N _j 2 9 IG 82 44 46 e6 __, 80 se r E D osTi' t aucuN or actevetv toc A1*o** c' at Lt Ast

( , b l l W, !

i s 9 to 11 44 45 Pt nsoNNE L t IPo1U54E5 .

eeu sus a ~ s veg or.scoes som i,3 ( Of Ol el L2J { NA _J

) a9 at s2 63 *3

. Pt nSoNNEL INJU, ales s.uunt a ot sc a se t eo,e 8(0!01di iaJNA i4 l

) ni go OF F $81( con 51out NCES 3 NA g M

LC55 cn cauaGE TO F ACILil y ot sc a sa g no%

@ evPC Z t NA l ,

i a \o w -- .

PUstsCITV 8 ie,NA ei3 j

AOctisON At 8 AClons 8 L,NA l

EE Ls t

i

\s,,

NAMt Jacque Lingenfelter/ Susan Vallade PHONE (419J 259-5000, ht. 151 l O 01 27021

_ _ _ _ _ . . ______m._ _ __. _ . _ . _ _ . . _ _ _ , - , . .

i' .

TOLEDO EDISON COMPANY g, DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-77-40 DATE OF EVENT: August 2, 1977 FACILITY: Davis-Besse Unit 1 IDEYrIFICATION OF OCCURRENCE: Containment Isolation Valve RC 240A was inoperable.

i I Conditions Prior to Occurrence: The unit was in Mode 3, with Power (MRT) = 0, and Load (MWE) = 0.

Description of Occurrence: At 0945 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.595725e-4 months <br /> on August 2, 1977, an operator attempted to cycle Pressure Sample Valve RC 240A for the purpose of obtaining a water sample for the station Chemistry Laboratory, but it would not stroke. The valve was in-

! operable, placing the unit in Action Statement (b) of Technical Specification 3.6.3.1. In compliance with this Action Statement, RC 240A was closed and power removed at 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br /> on August 2, 1977.

{

1 l

On August 6,1977 at 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br />, RC 240A was opened to enable station personnel to repair the valve. The second isolation valve for that penetration, RC 240B, 3 was then closed and its power removed until work on RC 240A was completed, also

, s.. / in compliance with Action Statement (b) of Technical Sp-acification 3.6.3.1. .

Designation of Aoparent Cause of Occurrence: There was a design problem with a j

spring hanger installed for thermal expansion which caused the failure of the

motor operator. It was designed with the support on the motor rather than on the piping. This caused a strain on the motor operator which caused the torque switch of the valve operator to prevent operation.

Analysis of Occurrence: There was no danger to the health and safety of the public or to station personnel. From 0945 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.595725e-4 months <br /> to 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br /> on August 2, 1977, the Safety Features Actuation System would have been able to close RC 240B and thus assure Containment integrity if it was needed. At 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br />, RC 240A was closed and power removed for further assurance of Containment integrity.

r Corrective Action: The hanger was readjusted, valve otroked successfully, and RC 240A was returecd to service o- August 8, 1977, removing the unit from Action Stat ement (b) of Technical Specification 3.6.3.1. To prevent recurrence, a i change in the spring hanger is being investigated by the architect / engineer,

! Bechtel Power Cornoration.

Failure Data: A different Containment Isolation Valve. CV 5074, was inoperable on July 27, 1977 (NP-33-77-38) due to personnel error.

i 4

- - - - - . - . . - - - - - - - . -- --- - -, - ., . - ~ - ,-- .--