ML19319B737
| ML19319B737 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/26/2019 |
| From: | NRC Region 1 |
| To: | Dominion Nuclear Connecticut |
| Shared Package | |
| ML19052A319 | List: |
| References | |
| 000500, 000956 | |
| Download: ML19319B737 (5) | |
Text
Millstone 3 2019 NRC Written Exam Questions asked by applicants during the written exam, and responses given.
Question #8 (Stintzcum): Should I assume the Motor Driven Main Feedwater Pump auto-starts when required?
Reply (Royce): Assume the plant responds as designed.
Question #12 (Jenny): Should I assume the charger supply breaker is the AC supply breaker?
Reply (Royce): Yes Question #18 (Stintzcum): Procedurally, we'd place the rods in manual during the shutdown. This may affect delta-T. Maybe I'm over-thinking this.
Reply (Royce): (No comment)
Question #29 (Herrera): Do you have noun names for these instrument numbers?
Reply (Royce): Do your best with the information given.
Question #29 (Hajdas): Can you tell me the noun name for what this is (Pointing to TE-129)?
Reply (Royce): Do your best with the information given.
Question #29 (Stintzcum): Are we allowed to have the nomenclature (Pointing to TE-129)?
Reply (Royce): Do your best with the information given.
Question #31 (Woods): Do I assume this is talking about the initial response, or after a high temperature condition is reached?
Reply (Royce): Initial response Question #32 (Stintzcum): Are the RCPs running? This affects vessel level.
Reply (Royce): Do your best with the information given.
Page 1 of2
Question #40 (Jenny): The procedure allows one or two pumps to be run. I'm not sure what the question is asking.
Reply (Royce): The US directed the RO to lower pressure at the maximum rate (already stated in the stem of the question).
Question #57 (Hojdas): I have the noun name. Can you give me the equipment ID?
Reply (Royce): Do your best with the information given.
Question #58 (Stintzcum): The answers say one signal 'exceeds' the other signal. Is this asking when one signal overcomes the other?
Reply (Royce): Yes Question #60 (Spornahuer): Is 'C' asking how much level will shrink? Because I don't know for sure.
Reply (Royce): Do your best with the information given.
Question #76 (Woods): I don't understand how a safety valve leak could empty the Pressurizer. Do I assume another leak is also in progress?
Reply (Royce): Assume whatever you think is required based on the given plant conditions.
Question #92 (Hojdas): Should I assume the radiation levels are actual radiation levels, and not due to TIC?
Reply (Royce): Yes. (This information was written on the white board for the entire class)
Question #95 (Woods): I'd like pages 2 and 3 of the Integrated Rod Worth Curve.
Reply (Royce): (Initial response): Let me look into this. (These pages were not required to answer the question, but are part of the Rod Worth Curve. Bill Forrestt called Tom Setzer, and the decision was made not to provide the additional pages, since some SROs had already finished the exam.)
(Follow-up response after receiving the decision from Tom Setzer): No additional references will be provided.
Page 2 of 2
Millstone 3 2019 NRC Written Exam Seating Chart Side room, not accessible from the outside r
___,I Joshua Toler (RO)
Jakub Hajdas (SRO)
Eddie Martinez (RO)
Raymond Spornhauer
_(SRO)
J l
j Roped off Door Jeremiah Sims (SRO)
Blake Jenny (RO)
Javi~
Herrera (SRO)
Jason Stintzcum (RO)
--,~-
r Kevin Woods (SRO)
Brian
- I DelaBruere I (RO)
I Alison nport
) --~
L___ __
- _________ P_ro_c_to_r_D_e_s_k ____ ~
Bathroom Locked side door with signage
Millstone 3 2019 NRC Written Exam Answer Sheet t"K6l W"
,4-,lt, ty J1J J<~'L Page 1 of 2 NAME:
DATE:
~ I 1-1 I I 4 I
/vv..Ntl,cr )
QUES ANSWER CHOICE ANSWER CHOICE of I
1>1,tr<<lt I
1 A
B 26 C
D
- -f.tfic, f) 2 A
B 27 B
C 3
A B
C D
4 B
C D
5 A
B C
6 A
7 A
A 8
A A
1111 9
A A
10 B
35 A
11 B
36 A
I 12 A
B C
37 A
I 13 B
C D
14 B
C D
11 15 D
A B "'
D 16 D
41 A
B C
17 A
A 18 A
43 D
19 A
B C
44 D
20 A
B C
45 D
21 C
D I 46 D
22 C
D 47 D
23 A
D II 48 24 A
C D
49 25 A
B ~
I 50
Millstone 3 2019 NRC Written Exam Answer Sheet Page 2 of 2 NAME:
{( e_y DATE:
911°111 '1 I
QUES ANSWER CHOICE QUES ANSWER CHOICE 11 51 A
C D
76 A
D 1
52 A
C D
77 A
D Ill 53 A
B 78 A
D 54 A
B 79 C
D 55 A
80 C
D 56 A
11181 A
B "
D
[ 11 57 C
D 82 A
B C
58 C
D 83 A
B C
59 D
84 A
B II 60 D
85 A
B 61 D
86 B
C D
62 A
B D
87 B
C D
63 B
C 88 B
C D
111\\ 64 B
89 A
B 65 A
B 90 A
B 66 A
B 91 A
D 67 A
92 A
B 68 A
93 A
B
..f.ttt-69 C
94 A
B 70 C
95 A
B 71 96 B
C D
111 72 A
97 B
D I
73 A
D 98 A
74 A
D II 99 A
75 B
C D
I 100 A