ML19319B592

From kanterella
Jump to navigation Jump to search
Forwards LERs 78-064/03L-0 & 78-064/03L-1
Date released: 11/29/2019 Download: ML19319B592


LER 78-064/03L-1:on 780608,radiation Monitor Re 5030 Pump Failed After Large Flow Oscillations Discovered.Caused by High Ambient Temps.Pump Repaired & Ventilation Requested for Cabinet
ML19319B604
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/05/1978
From:
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19319B604 (2)
LER 78-064/03L-0:on 780608,radiation Monitor Re 5030 Pump Failed After Large Flow Oscillations Were Found.Cause for Pump Failure Under Investigation.Monitor Will Be Repaired
ML19319B597
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/05/1978
From: Kovach S
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19319B597 (3)
Forwards LERs 78-064/03L-0 & 78-064/03L-1
ML19319B591
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/05/1978
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19319B591 (1)