ML19319B360
| ML19319B360 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/20/1978 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | Goller K Office of Nuclear Reactor Regulation |
| References | |
| 414, NUDOCS 8001150945 | |
| Download: ML19319B360 (3) | |
Text
'
q REGULATORY INNRMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-346 FEC: GOLLER K R ORG: ROE L E DOCDATE: 01/20/78 NRC TOLEDO EDISON DATE RCVD: 01/24/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 1 FORWARDING RESPONSE TO NRC"S LTR DTD 12/15/77 REGUESTING COMPLETION OF THE QUESTIONNAIRE FOR NRC RELIABILITY STUDY OF STANDBY DIESEL GENERATOR UNITS.
W/ATT SHEET IDENTIFYING INDIVIDUAL TO CONTACT ON ANY FOLLOW-UP COMMUNICATIONS CONCERNING QUESTIONNAIRE.
. f24-
)
PLANT NAME: DAVIS BESSE - UNIT 1 REVIEWER INITI AL:
XJM DISTRIBUTOR INITI AL:
- DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ****:*************
NO'ES:
1.
SEND ALL AMENDMENTS TO J.
ROE DISTRIBUTION OF " RELIABILITY OF STANDBY DIESEL GENERATOR UNITS" PER J.
(DISTRIBUTION CODE A014)
FOR ACTION:
BRANCH CHIEF STOLZ**W/7 ENCL INTERNAL: ( REG FILET *W/F
)
NRC PDR**W/ ENCL
~'
n.1 -
OELD**W/ ENCL HANAUER**W/ ENCL CHECK **W/ ENCL EISENHUT**W/ ENCL SHAOc*W/ ENCL BAER**W/ ENCL BUTLER **W/ ENCL GRIMES **W/ ENCL J.
COLLINS **W/ ENCL J.
MCGOUGH**W/ ENCL F.
CLEMENSON**W/ ENCL EXTEPNAL:
LPOR'S P T.
CLINTON, OH**W/ ENCL TIC **W/ ENCL NSIC**W/ ENCL ACRS CAT A**W/16 ENCL h
DISTRIBUTION:
LTR 40 ENCL 40 CONTROL NBR:
7@s240U52 SIZE: 1P+1P+1/2P
- ++*********************
THE END 8001150fy y
q 5
TOLEDO
% EDISON LOWELL E. RCE A Q s.ce Presscent w
ea.s... c.... eon..s w / u.w ass-saar Docket No. 50-346 g
df/! / pl
[
lf
. l}
License No. NPF-3
.c k24 g7g January 20, 1978 L,
Q"k,,.
Ao mur
"* j Serial No. 414 g$r-
..C /
^
Director of Nuclear Reactor Regulation Attention:
Mr. Karl R. Coller, Assistant Director for Operating Reactors Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Goller:
This letter is in response to your letter of December 15, 1977, requesting completion of the questionnaire for Nuclear Regulatory Commission reliability study of standby diesel generator units.
Enclosed is a completed copy of the questionnaire for the Davis-Besse Nuclear Power Station Unit No. 1.
Also enclosed is a sheet identifying the individual you should contact on any follow-up communications concerning this questionnaire.
Yours very truly,
\\
'/
/
N&
&s" r
Enclosures 1snems.
f o /4/5 I//
THE TOLECO EDISCN COMPANY EDISCN PLAZA 300 MACISON AVENUE TOLEDO. CHIO 43652
m o
License No. NTP F-3 Docket No. 50-346 Serial No. 414 January 20, 1978 Contact for follow-up communications concerning questionnaire for Nuclear Regulatory Commission reliability study of standby diesel generator units for Da ris-Besse Nuclear Power Station Unit No. 1:
Mr. Eugene C. Novak General Superintendent Power Engineering and Construction Toledo Edison Company 300 Madison Avenue Toledo, Ohio 43652 Phone: 419)259-5370
. -..