ML19319B360

From kanterella
Jump to navigation Jump to search
Responds to NRC Requesting Completion of Questionnaire Re Standby Diesel Generator Unit Reliability Study.Forwards Completed Questionnaire for Facility.W/O Encl
ML19319B360
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/20/1978
From: Roe L
TOLEDO EDISON CO.
To: Goller K
Office of Nuclear Reactor Regulation
References
414, NUDOCS 8001150945
Download: ML19319B360 (3)


Text

'

q REGULATORY INNRMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-346 FEC: GOLLER K R ORG: ROE L E DOCDATE: 01/20/78 NRC TOLEDO EDISON DATE RCVD: 01/24/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 1 FORWARDING RESPONSE TO NRC"S LTR DTD 12/15/77 REGUESTING COMPLETION OF THE QUESTIONNAIRE FOR NRC RELIABILITY STUDY OF STANDBY DIESEL GENERATOR UNITS.

W/ATT SHEET IDENTIFYING INDIVIDUAL TO CONTACT ON ANY FOLLOW-UP COMMUNICATIONS CONCERNING QUESTIONNAIRE.

. f24-

)

PLANT NAME: DAVIS BESSE - UNIT 1 REVIEWER INITI AL:

XJM DISTRIBUTOR INITI AL:

                                  • DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ****:*************

NO'ES:

1.

SEND ALL AMENDMENTS TO J.

ROE DISTRIBUTION OF " RELIABILITY OF STANDBY DIESEL GENERATOR UNITS" PER J.

(DISTRIBUTION CODE A014)

FOR ACTION:

BRANCH CHIEF STOLZ**W/7 ENCL INTERNAL: ( REG FILET *W/F

)

NRC PDR**W/ ENCL

~'

n.1 -

OELD**W/ ENCL HANAUER**W/ ENCL CHECK **W/ ENCL EISENHUT**W/ ENCL SHAOc*W/ ENCL BAER**W/ ENCL BUTLER **W/ ENCL GRIMES **W/ ENCL J.

COLLINS **W/ ENCL J.

MCGOUGH**W/ ENCL F.

CLEMENSON**W/ ENCL EXTEPNAL:

LPOR'S P T.

CLINTON, OH**W/ ENCL TIC **W/ ENCL NSIC**W/ ENCL ACRS CAT A**W/16 ENCL h

DISTRIBUTION:

LTR 40 ENCL 40 CONTROL NBR:

7@s240U52 SIZE: 1P+1P+1/2P

                        • ++*********************

THE END 8001150fy y

q 5

TOLEDO

% EDISON LOWELL E. RCE A Q s.ce Presscent w

ea.s... c.... eon..s w / u.w ass-saar Docket No. 50-346 g

df/! / pl

[

lf

. l}

License No. NPF-3

.c k24 g7g January 20, 1978 L,

Q"k,,.

Ao mur

"* j Serial No. 414 g$r-

..C /

^

Director of Nuclear Reactor Regulation Attention:

Mr. Karl R. Coller, Assistant Director for Operating Reactors Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Goller:

This letter is in response to your letter of December 15, 1977, requesting completion of the questionnaire for Nuclear Regulatory Commission reliability study of standby diesel generator units.

Enclosed is a completed copy of the questionnaire for the Davis-Besse Nuclear Power Station Unit No. 1.

Also enclosed is a sheet identifying the individual you should contact on any follow-up communications concerning this questionnaire.

Yours very truly,

\\

'/

/

N&

&s" r

Enclosures 1snems.

f o /4/5 I//

THE TOLECO EDISCN COMPANY EDISCN PLAZA 300 MACISON AVENUE TOLEDO. CHIO 43652

m o

License No. NTP F-3 Docket No. 50-346 Serial No. 414 January 20, 1978 Contact for follow-up communications concerning questionnaire for Nuclear Regulatory Commission reliability study of standby diesel generator units for Da ris-Besse Nuclear Power Station Unit No. 1:

Mr. Eugene C. Novak General Superintendent Power Engineering and Construction Toledo Edison Company 300 Madison Avenue Toledo, Ohio 43652 Phone: 419)259-5370

. -..