ML19319B297

From kanterella
Jump to navigation Jump to search
Forwards Amend 31 to OL Application,Consisting of Revision 15 to FSAR
ML19319B297
Person / Time
Site: Davis Besse 
Issue date: 09/08/1975
From: Roe L
TOLEDO EDISON CO.
To: Boyd R
Office of Nuclear Reactor Regulation
Shared Package
ML19319B298 List:
References
NUDOCS 8001150737
Download: ML19319B297 (2)


Text

m

~

NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL (T(MPORARY FORM)

CONTROL NO: _t FILE:

FROM: Tolede Edison Co.

DATE OF DOC D ATE R EC'D LTR TWX RPT OTHER Toledo, Ohio Sovell E. Roe 9-8-75 9-8-75 m

TO:

ORIG CC OTHER SENT NRC POR m

M 1 Signed SENT LOCAL PDR pogerS.Boyd CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

1 50-346

! Ex DESCPIPTION:

ENCLOSURES:

Notarized ltr. dtd 9-8-75..trans the following Amdt # 31, to the 0/L ronsists of Revisioti' #15 to the FSAR regarding miscellaneous mino changes and the response to RAI #15.4.3...

Also 3 copies of new & revis iled EISC g {M

-( 70 cys. rec'd) drawings...

ACKNOWLEDGEU PLANT NAME: Davis Besse FOR ACYION/INFORMATION vrR 9-10-75 j

BUTLER (L) pdCHWENCER (L) ZIEMANN (L)

REG AN (E)

REID(L)

W/ Copies W

pies W/ Copies W/ Copies W/ COPIES CLARK (L)

ST Z (L)

DICKER (E)

LEAR (L)

W/ Copies W/ Copies W/ Copies W/ Capies PARR (L)

VASSALLO (L)

KNIGHTON (Eldk spins y

W/ Copies W/ Copies W/ Copies

  • W/ Copies KNIEL (L)

PURPLE (L)

YOUNGBLOOD (E)

LPM W/ Copies W/ Copies W/ Copies W/ Copies a

INTERNAL DISTRIBUTION TECH REVIEW ENTON LIC ASST A/T IND.

9 6c0c3*

@fiRIMES WRC PDR SCHROECER R. DIGGS (L)

BRAITMAN

/OGC, RGOM P 506A MACCARY fAMMILLA H.GEARIN (L)

SALTZMAN p GOSSICK/ STAFF

/ NIGHT AASTNER PE. GOU LBOURNE (L)

MELTZ y/ CASE LTd.

/AWLICKl BALLARD P. KREUTZER (E) flAMBUSSO AT4 fHAO SPANG LE R J. LEE (L)

_P LANS BOYD WTELLO M. RU'C3R00?(L)

J CDONALDL T.

1 p,* MOO R E (L) gy10, JiOUSTON

. ENVIRO S. REED (E)

CHAPMAN DEYOUNG IL)

/NOVAK AULLER M. SERVICE (L)

DUBE (Ltr)

J SKOVHOLT ('.)

VROSS DICKER S. SHEPPARD (L)

E. COUPE j

PETERSON GOLLER (L) (Ltr)

./IPPOLIT KNIGHTON

.,,M. SLATER (E) jP. COLLINS y(EDESC YOUNG B LOOD H. SMITH (L)

HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L)

KLECKER PRpJECT LDR G. WILLI AMS (E)

EISENHUT-ELE & REGION [plNAS OPR M^

JENAROYA / F. MV. WILSON (L)

WIGGINTON MIPC V OLLMER HAR LE SS R. INGRAM (L)

M. DUNCAN m EXT R,((AL DISTRIBUTION A

- LOCAL PDR[MN"'D 9 O

- TIC (ABERNATHY) (1)(2)(10) - N ATION AL LABS 1 - PDR SAN /LA/NY J -- NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm -201 GT y('- BROOKHAVEN NAT LAS 1 -G. ULRIKSON ORNL 1 - ASLB 1 - CONSULTANTS g ewton Anderson NEWM ARK /BLUME/AG B ASI AN I

N

} FACRS HOLDINOwG8M 800115,d.h 7

~1egulatory Docket FQ g y.

c^;$$ j a'?/

4

~~

81g # E-)!

EDISON TOLEDO sEP ROE I*

h,C(E September 8, 1975 g

Facihties DevelODfm nt (4191 259 *242 4

g

/

Docket 50-346

/s L

Mr. Roger S. Boyd, Acting Director Division of Reactor Licensing United States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Boyd:

Under separs.te cover, we are transmitting Amendment No. 31 to the Application for Licenses for the Davis-Besse Nuclear Power Station Unit 1.

This Amendment consists of Revision No. 15 to the Final Safety Analysis Report (FSAR). Three (3) original and twenty-five (25) con-formed copies of the transmittal sheet are included together with seventy (70) copies of Revision 15 to the FSAR.

This revision consists of miscellaneous minor changes and the response to RAI #15.4.3.

Also included in this Amendment is the submittal of three (3) copies of new and revised detailed EI&C drawings.

Yours very truly,

's es e/14 cc: w/1 James G. Keppler Regional Director, Region III Directorate of Regulatory Operations U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

~ : r, 9 s.

". s THE TOLEDO EDISON COMPANY ED! SON PLAZA 300 MACISCN AVENUE TCLECO. CHlO 43652