Forwards Amend 40 to OL Application,Consisting of Revision 24 to FSAR
ML19319B292
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/09/1976
From: Roe L
TOLEDO EDISON CO.
To: Rusche B
Office of Nuclear Reactor Regulation
Shared Package
ML19319B293 List:
References
159, NUDOCS 8001150729
Download: ML19319B292 (3)


Text

f

-A

_' "' "^ R,, f U.2. f4UCLE AR REGULATORY Co"-*'Ss O

ET NU ER Nhl,.

NRC DISTNDUYIke'o#PART 50 DOCKET MATERIAL NLE MUWER "1

1

,I

Y'~y/ u e

FROM: Toledo Edison Co DATE oF DOCU TO:

Mr Rusche Toledo, Ohio l

L E Roe oATE RECEtVE g,

t JILETTER E NoToRIZE D PROP INPUT FoRfA NUMDER of CoptEs REC 2tVEo BoRIGINAL f213 UNC LAOW FIE D 3 signea Ocoey DESCRIPTION

,:LOsVAE Ltr notarized 12-9-76.....arans the A:ndt 440 to the License Application:

Con-following:

sisting of the following:

1.

Revision #24 to the FSAR.....w/retised &

7., -, -

, n,,-. -,, - 7 n".J addl pgs, tables, figs to the FSAR........

iWdV Y.

L \\/ 2101 (60 cys encl rec'd) 2.

Enlarged revised E&IC drawings........

---,7 (3 sets encl rec'd, Dist as follows:

n.....

s' Reg Files, I&E, & Ippolitto) f PLANT NAME:

Davis Besse #1 g g f A,,.a,sf 12-13-76 ehf i

SAFETY FOR ACTION!!NFORMATION rs.wmn

/ ASSICNED AD:

Va _c s e//o b>)

A 4 eTmM M.

23P4hCH C3IEF S to/2 npANmi c"Tv".

/

PROJECT li\\ NAGER:

En e. /m

/

PROJECT MANAGER:

A de 6A i

/J,IC. ASST. :

14f/ f o n LIC. ASS?. :

J IN1 ERN AL DISTRISUTICN AG FILN SY;S_TEMS SAFET'l i

PLANT SYSTEMS I SITE SAFETY &

/' WRC PDR HE!NEMAi!

/t 3DESco Afw rwTno Anat,vgrg

/_.I & E ( 7.',

SCHROEDER I /t P,ENAROYA DEUTQ2 & l'i'i T ':'M OELD 46

!/ I ilTNAS

/

/ GOSSICK & STAFFt.6-ENGINEERING

'/ l IP_IOLJI_0 ENV7J.0 TECH.

MIPC FACARRY l

KIRECOD ERNST CAS'd

/l KNIGHT EAIJJ.RD HANAUER

/;

SIti.EIL i

OPERATINC REACTORS

! SPANGLER HARLESS

/l PAWLICKI I

STELLO l i I

I I SITC TECH.

PROJECT MANAGE ldEYr REACTOR SAFETY i OPERATING TECH.

/

CAMMILL (2.)

BOYD

/

ROSS Lt>

EISENHUT STEPP

/ P, COLLINS

/

NOVAK S;'\\0 HULMAN

[HO_USTON

/

ROSZTOCZY BAER PETERSON

/

CHECK BIrrLER SITE ANALYSIS MELTZ CRIMES

/

VOLLMER Lt>

'/ HELTEMES l

AT & I

/

BUNCN SKOVHOLP l

SALTZMAN

/

J. COI. LINS RUTBERG

/

KREGER EXTErlNAL DISTRIBUTION CONTROL NUMBER 3 i BR00KHAVE?LRiT_ TA%

i gLPER: Pt.C/md 4,OM N4T. LAB:

/ TIC:

REC V.IE ULRIKSON (ORNL QSIC:

LA PDR

/2Y8f

,l-ASLB:

CONSULTANIS:

KA_CRS /(, CYS "_r!"';j5Ed T 43 C47~ 4 12 13 -9L f'

3 I

  • ~ o RM 105 (2J6 I 8001150729

(

j t ~~

n Iff7./;>,g i

F

( [At.i'$fka.

EbYSON 0

Docket No. 50-346 LOWELL E. ROE v,c. p,..am N.

' U December 9, 1976

\\

ms> 2ss-sa42 Serial No. 159 5!I/Gfn Mr. Benard C. Rusche, Director

%f N,

Office of Nuclear Reactor R93ulation N l'S e.

United States Nuclear Regulatory Commission

' I9 Washington, D.C.

20555

Dear Mr. Rusche:

Under separate cover, we are transmitting Amendment No. 40 to the Appli-cation for Licenses for the Davis-Besse Nuclear Power Station Unit No. 1.

This Amendment consists of Revision No. 24 to the Final Safety Analysis Report (FSAR). Three (3) ori;;inal and twenty-five (25) conformed copies of the transmittal sheet are included together with sixty (60) copies of Revision 24 to the FSAR.

This revision clarifies the FSAR in several electrical areas which have been discussed recently with the NRC review staff.

Also ch1s revision completes the changes to the FSAR concerning the diverse electric power source to the auxiliary feedwater pump turbine steam supply valves and feedwater pump discharge lines as related to the NRC in the December 2, 1976, letter to Mr. John F. Stolz. As indicated in that letter the modifications will be completed prior to the commence-ment of the second frel cycle, presently scheduled for the spring of 1979.

As discussed with the NRC review staff, the Auto Test Inserter (ATI) descriptica has been removed from the FSAR and will not be placed in service for initial operation of the unit for the following reasons:

1.

The testing of the Safety Featurea Actuation System (SFAS) is being delayed due to the complications imposed on it by the ATI resulting in delayed turnover and delayed final acceptance of the equipment.

- i, ll{

\\

JE Em 21 m

Z DEC a m ii i u -.. A,a k

l 12455 THE TCLECO ECISCN CCMPANY ECISCN PLAZA 300 MADISCN AVEN1 TCLECO CHiO 43552

a T

. 2.

The surveillance requirements for the SFAS in the Davis-Besse Technical Specification do not give any credit for the opera-tion of the ATI.

Also included as part of this Amendment is the submittal of three (3) copies of new and revised detailed EI&C drawings.