Submits List of Plants That Would Benefit from 20% Power License for Fuel Loading Prior to 721101
ML19319B080
Person / Time
Site: Calvert Cliffs, Peach Bottom, Browns Ferry, Oconee, Palisades, Indian Point, Kewaunee, Point Beach, Pilgrim, Prairie Island, Surry, Turkey Point, Vermont Yankee, Maine Yankee, Quad Cities, Zion, Fort Saint Vrain  
Issue date: 11/01/1971
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Muntzing L
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8001070620
Download: ML19319B080 (2)


Text

-_

.a g.,

5] ~

I So M9 l-

.Novemoe.

1, 1971-

~

~

\\

Note to.L. Manning Muntzing

~

- BENEFIT 8 OF 20% OF POWER LICENSES 1 1

~ In the start. of operation of nuclear power plaats the important steps are:

. i

- 1.

-Fuel. loading.

2.

Initial critical and low power testing, generally in the range below 1% of full power.

3.

Escalation of power in several steps to the full licensed power level.

' 4.

A " warranty" rua, of ten for -100 hours of full power operation.

Fuel loading takes about 2-3 weeks.

Initial low power operation takes about 3 weeks.

Escalauon of. power takes about 3-4 weeks.

~

i

. Operation above 5-10% of f ull power permits testing of~most normal systeas, including the turbine generator.

Nothing is magic about-205.

Various tests are i

normally-done at several levels on the way to full power.

If.a 20%' power license is issued laitially, a 2chedule saving of.6 to.8 weeks'is possible.

If the 20% license follows some lower power license the benefit is reduced, of course.

Tbc following plants, whose fuel loading date is estimated to be before 11/1/72,~ would benefit from a 20% license:

i

. 3 4

m

. i,,

~

soo1070 g g ;

(

g ww.

.a..

y..

.--_c_

.,.,,-,,,,y

__._,y..,

y

L. Cc.cnitg Muntzini -

lovsaber 1, 1071 Category h-

^

D Palinades Already licensed for 1 Mwt Fuel now being loaded D

Quad Cities 1

+

Quad Cities 2 Ready for fuel loading

  • in Nov. 1971 D

Indian Pt. Ready for fuel loading 'in Oct. 1971 D

. Point Beach-2

. Ready for fuel loading in Oct. 1971 D

l-Vermont Yankee Ready _'for fuel loading in Dec. 1971 D

Turkey Point-3 Ready for ' fuel loading in Dec.1971 D

Pilgrin-Ready for fuel loading in Jan. 1972 D

Oconee 1-Ready for fuel loading in Jan. 1972 D

. Turkey Point 4 Ready for fuel loading in-April 1972 D

~

Maine Yan've Ready for fuel loading in April 1972 D

a Surry 1 Ready for fuel loading in April 1972 D

Ft. St. Vrain Ready for fuel loading,in April 1972 D

Browns Ferry 1 Ready _for fuel loading in May 1972 D

Zion-1 Ready for fuel loading in Junp 1972 C

Calvert Cliffs 1 Ready for fuel loading in July 1972 C

Kewaunee Ready for fuel loading in Sept. 1972 C

l Oconee 2 Ready for fuel loading in Sept. 1972 C

Peach Botton 2 _

Ready for fuel loading in Oct. 1972 C

. Prairie Island 1 Ready for fuel loading in Oct. 1972 C

Ready for. fuel loading in Oct. 1972 C

'Surry 2 c

~

engset sw my s

F e ar a, u s,,4, Peter A. Morris cc:

C. K. Beck, DR M. M. Mann, DR S. E. Manauer, DR C. L. Eenderson, DE H. K. Shapar, CGC E. G. Case, RS L. Rogers, REP L. D. Low, CO 1

C. Thornton, NMS DEL Distribution:O Supple

  • DR Reading DRL Reading

-P.A.

Morris 7 Fuel loading and full power dates are Compliance estimates.