ML19319A605
| ML19319A605 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/26/1979 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Higginbotham L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19319A604 | List: |
| References | |
| NUDOCS 7908100067 | |
| Download: ML19319A605 (1) | |
Text
of.).3 y~, 3.5 7
o V,,g Meg,.
UNITED STATES
[.
.[
NUCL_AR REGUI.ATORY COMMISSION r.===
S-REGION Ill
. 22::..
72
,A 4
GLEN ELLYN. ILLINOl5 60137
$$: r
==::
April 26, 1979 EEi;~jE:2.
- ==
MEMORANLUM FOR: L.B.Uigginbotham,AssistantDirector, Division of Fuel Facility and Materials Safety Inspection, IE.
FROM:
A. B. Davis, Chief, Fuel Facility and Materials Safety
SUBJECT:
FISH IMPINGEMENT STUDY - DAVIS-BESSE 1
.==:
AITS F30457H3 (Enclosure 1), dated December 20, 1978 was sent to your office requesting a review of the fish impingement criteria of Phase I of the Davis-Besse 1 Fish Impingement Study. The requested T."..~~~
completion date was January 10, 1979 but to date we have received no results of this review.
- .y A letter from J. S. Grant to James G. Keppler, dated Mr.rch 28, 1979 s-ssh (Enclosure 2) evaluates the results of Phase I and states that the objectives of this special study have been met and initiation of g
Phasc II is unnecessary. As the above Action Item results are 2
germane to the review of the March 28, 1979 letter, we request the R 21 completion of this Action Iten.
In addition, please forward to the Operating Reactors Branch No. 4 (DOR) and to the
- g. ::
Environmental Specialists Branch (DSE), requesting them to review l_l.
the results contained therein, and report the results of that review
' ' ~ '
back to this of fice.
4 E
0O
=="
A. B. Davis, Chief Fuel Facility and Materials 2l,"'"
- Safety Branch
"-~
Enclosures:
As stated
- ==
EE
---ir
- =.
"[.f:'"[) ~ ~ ~ E =:=:. ~ 2:# 790810006-] ;
== s'- m. =, di:Tl:i";il:'- ..... l:Ei5.h:.
- =:"
.::.=. "==. ::::li."~ i:... ..m..._. ....}}