Public service company ce cdemaTo l
16805 ROAD 19%
PLATTEVILLE, COLORADO 80651 July 1, 1980 Fort St. Vrain Unit No. 1 P-80188 Mr. Karl V. Seyfrit, Director Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Reference: Facility Operating License No. DPR-34 Docket No. 50-267
Dear Mr. Seyfrit:
Enclosed please find a copy of Reportable Occurrence Report No. 50-267/
80-27, Final, submitted per the requirements of Technical Specification AC 7.5.2(b) 2.
Also, please find enclosed one copy of the Licensee Event Report for Reportable Occurrence Report No. 50-267/80-27.
Very truly yours, 5
Don Warembourg
/
Manager, Nuclear Production DW/cis Enclosure cc: Director, MIPC 3 9h i
8007080 Sio
e REPORT DATE:
July 1, 1980 REPORTABLE OCCURRENCE 80-27 ISSUE O OCCURRENCE DATE:
June 3, 1980 Page 1 of 4 FORT ST. VRAIN NUCLEAR GENE 3ATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD County ROAD 19 1/2 PLATTEVILLE, COLORADO 80651 REPORT NO. 50-267/80-27/03-L-0 Final IDENTIFICATION OF OCCURRENCE:
During the period from June 3, 1980, through June 11, 1980, with the reactor operating at power, three separate instances of reactor operation ecok place with inoperable Class I shock suppressors (snubbers).
These events constitute operation in a degraded mode of LCO 4.3.10, and are reportable per Fort St. Vrain Technical Specification AC 7.5.2(b)2.
EVENT
DESCRIPTION
Three instances of LCO 4.3.10 degraded mode operation occurred between June 3 and June 11, 1980, as outlined below.
Event #1 At 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br /> on June 3,1980, with the plant operating at approximately 62% thermal power and 179 !We, hydraulic oil snubber HOS-30 was determined to be impaired due to the snubber reservoir being rotated below the cylinder.
The snubber was repaired and returned to service at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> on June 3, 1980.
Event #2 At 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on June 3,1980, with the plant operating at approximately 69% thermal power and 200 MRe, main steam snubber 11SS-422 was removed from service to repair a cracked fitting.
A Plant Trouble Report had been initiated to indicate that the snubber was low op oil, but was still operative. However, investigation revealed that the low oil level was due to a broken fitting from the valve to the cylinder, so the snubber was removed from service for repair.
The faulty fitting was replaced, and the snubber filled wf th oil and returned to service at 1240 hours0.0144 days <br />0.344 hours <br />0.00205 weeks <br />4.7182e-4 months <br /> on June 4,1980.
O REPORTABLE OCCURRENCE 80-27 ISSUE O Page 2 of 4 EVENT
DESCRIPTION
(Cont' d)
Event #3 At 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> on June 11, 1980, with the plant operating at approximately 697. thermal power and 202 NRe, main steam snubber MSS-149 was removed from service for repair of a piston rod seal.
A Plant Trouble Report was initiated on May 19, 1980, indicating that this snubber had a low oil level, but that it was still operable. This low oil level did not result in LCO 4.3.10 degraded mode operation; however, a decision to remove the snubber from operation for repair on June 11 resulted in operation in a degraded mode of LCO 4.3.10.
The enubber was rebuilt per approved procedure to rectify the rod seal leakage, and was returned to service at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> on June 11, 1980.
No further instances of LCO 4.3.10 degraded mode operation were observed.
J
CAUSE
DESCRIPTION:
4 Event #1 Rotation of the reservoir of HOS-30 is being attributed to personnel working in the area using the snubber as a stepping platform.
Event #2 Cause of MSS-422 low oil level was a cracked fitting between the snubber valve and cylinder, which necessitated removing the snubber from service for repai,r.
Event #3 Cause of event #3 degraded mode operation was the removal of MSS-149 i
from service in order to repair a piston rod seal. Although the seal 1eakage resulted in the snubber having low oil level, it was not inoper-able prior to its removal from service.
CORRECTIVE l
ACTION:
Event #1 i
The snubber was returned to its proper position, its lock nut set, and the snubber returned to service.
Personnel were reminded that plant piping and installations are not to be used in place of ladders in order to gain access to equipment.
REPORTABLE OCCURRENCE 80-27 ISSUE O Page 3 of 4 CORRECTIVE ACTION:
(Cont'd)
Event #2 The broken fitting was replaced with a new fitting. The snubber was filled with oil and returned to service.
Event #3 T'e piston rod seal was replaced during rebuilding of the snubber cylinder and valve per approved procedure, and the snubber was returned to service.
In accordance with Surveillance Requirement 5.3.8, the surveillance interval has been adjusted to 124 days + 25%.
No further corrective action is anticipated or required.
REPORTABLE OCCURRENCE 80-27 ISSUE O Page 4 of 4 Prepared By:
,1r/M.
wI Cathy Cy Hirsch Technical Services Tecn ician Reviewed By:
T((), t /// 7?? [],
J. W. Gahm u
Technical Services Supervisor Reviewed By:
Frank M. Mathie Operations Manager Approved By:
Tw W
Don Warembourg Manager, Nuclear Production l
l i
I
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000267/LER-1980-001-03, /03X-1:on 800108,leak Found on 1B Helium Circulator Static Seal Internal to Circulator.Caused by Mfg Defect That Acted as Stress Riser & Caused Cyclic Failure of Bellows Matl.Circulator Replaced | /03X-1:on 800108,leak Found on 1B Helium Circulator Static Seal Internal to Circulator.Caused by Mfg Defect That Acted as Stress Riser & Caused Cyclic Failure of Bellows Matl.Circulator Replaced | | | 05000267/LER-1980-001-01, /01T-0:on 800108,while Operating Plant at Approx 1.5% of Rated Power,Leak Discovered on Helium Circulator Static Seal Internal 1B to Circulator.Cause Unknown.Reactor Shut Down & Circulator Replacement Begun | /01T-0:on 800108,while Operating Plant at Approx 1.5% of Rated Power,Leak Discovered on Helium Circulator Static Seal Internal 1B to Circulator.Cause Unknown.Reactor Shut Down & Circulator Replacement Begun | | | 05000267/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | | | 05000267/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000267/LER-1980-002-03, /03L-0:on 800107,during Region Constraint Device Installation,Found That Startup Channel Scram Protection Not Operable at Less That or Equal to 100,000 Counts/Second. Caused by Improper Setpoints.Setpoint Change Initiated | /03L-0:on 800107,during Region Constraint Device Installation,Found That Startup Channel Scram Protection Not Operable at Less That or Equal to 100,000 Counts/Second. Caused by Improper Setpoints.Setpoint Change Initiated | | | 05000267/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000267/LER-1980-003-03, /03L-0:on 800110,while Reactor Was in Shutdown Condition,Three Hangers Found Impaired,Which Caused 21 Sys to Be Impaired.Caused by Failure to Reinstall Hangers Following Removal for Sys Mod.Hangers Will Be Modified | /03L-0:on 800110,while Reactor Was in Shutdown Condition,Three Hangers Found Impaired,Which Caused 21 Sys to Be Impaired.Caused by Failure to Reinstall Hangers Following Removal for Sys Mod.Hangers Will Be Modified | | | 05000267/LER-1980-004-03, /03L-0:on 800114,following Performance of Class I Shock Suppressor Surveillance Test,Two Snubbers Found Inoperable.Caused by Personnel Using Snubber Units as Stepping Platforms.Snubbers Repositioned | /03L-0:on 800114,following Performance of Class I Shock Suppressor Surveillance Test,Two Snubbers Found Inoperable.Caused by Personnel Using Snubber Units as Stepping Platforms.Snubbers Repositioned | | | 05000267/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000267/LER-1980-005-03, /03L-0:on 800111,during Release from Gaseous Waste Holdup Sys,Recorder Did Not Function Properly.Caused by Bad Bull Drive Gear & Clutch Assembly.Parts Replaced & Recorder Returned to Operation | /03L-0:on 800111,during Release from Gaseous Waste Holdup Sys,Recorder Did Not Function Properly.Caused by Bad Bull Drive Gear & Clutch Assembly.Parts Replaced & Recorder Returned to Operation | | | 05000267/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000267/LER-1980-006-03, /03L-0:on 800218,w/reactor at Less than 2% Power, Vent Stack Snubber VSS-117 Was Inoperable & Degraded Mode of Tech Spec LCO 4.3.10 Existed.Caused by Taking Reactor Critical W/Vent Stack Snubber Out of Svc for Maint | /03L-0:on 800218,w/reactor at Less than 2% Power, Vent Stack Snubber VSS-117 Was Inoperable & Degraded Mode of Tech Spec LCO 4.3.10 Existed.Caused by Taking Reactor Critical W/Vent Stack Snubber Out of Svc for Maint | | | 05000267/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000267/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000267/LER-1980-007-03, During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt on Switches.Switches Replaced | During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt on Switches.Switches Replaced | | | 05000267/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000267/LER-1980-008-03, /03L-0:on 800219,during Routine Surveillance Testing,Setpoints for Low Flow on One Dewpoint Moisture Monitor & for Fixed low-low Flow on Another Monitor Found Less than Min Acceptable.Caused by Instrument Calibr Drift | /03L-0:on 800219,during Routine Surveillance Testing,Setpoints for Low Flow on One Dewpoint Moisture Monitor & for Fixed low-low Flow on Another Monitor Found Less than Min Acceptable.Caused by Instrument Calibr Drift | | | 05000267/LER-1980-009-01, /01T-0:on 800225,while in Shutdown Condition,Test Evaluation Determined Bistable Trip Modules,When Used W/Mtu for Calibr of Process Trips,Induced Calibr off-set Which Could Allow Trips Outside Tech Specs.Bistables Recalibr | /01T-0:on 800225,while in Shutdown Condition,Test Evaluation Determined Bistable Trip Modules,When Used W/Mtu for Calibr of Process Trips,Induced Calibr off-set Which Could Allow Trips Outside Tech Specs.Bistables Recalibr | | | 05000267/LER-1980-009, Forwards LER 80-009/01T-0 | Forwards LER 80-009/01T-0 | | | 05000267/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | | | 05000267/LER-1980-010-03, /03L-0:on 800303,at 10% Thermal Power,A Emergency Diesel Generator Would Not Load as Required for Weekly 50% Load Test Surveillance.Caused by Diesel Generator Governor Problem Which Reduced Speed Control Response | /03L-0:on 800303,at 10% Thermal Power,A Emergency Diesel Generator Would Not Load as Required for Weekly 50% Load Test Surveillance.Caused by Diesel Generator Governor Problem Which Reduced Speed Control Response | | | 05000267/LER-1980-011-03, /03L-0:on 800306-21,reactor Dewpoint Limiting Conditions for Operation Were Exceeded on One Occasion & Operation in Degraded Mode Occurred on Three Occasions. Caused by Problems W/Buffer Helium Sys | /03L-0:on 800306-21,reactor Dewpoint Limiting Conditions for Operation Were Exceeded on One Occasion & Operation in Degraded Mode Occurred on Three Occasions. Caused by Problems W/Buffer Helium Sys | | | 05000267/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000267/LER-1980-012, Forwards LER 80-012/01T-0 | Forwards LER 80-012/01T-0 | | | 05000267/LER-1980-012-01, /01T-0:on 800311,while Facility Was Operating at Less than 2% Power,Orifice Valves Not Set for Equal Flows & Temp Limit Was Exceeded.Caused by Inability to Close Orifice Valve to Equal Flow Position.Valve Freed Up | /01T-0:on 800311,while Facility Was Operating at Less than 2% Power,Orifice Valves Not Set for Equal Flows & Temp Limit Was Exceeded.Caused by Inability to Close Orifice Valve to Equal Flow Position.Valve Freed Up | | | 05000267/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | | | 05000267/LER-1980-013-03, /03L-0:on 800310,during 58% Thermal Power Operation,Indicated Flow for Two Low Level Primary Coolant Dewpoint Moisture Monitors Discovered Less than Requirements.Caused by Inaccurate Flow Elements | /03L-0:on 800310,during 58% Thermal Power Operation,Indicated Flow for Two Low Level Primary Coolant Dewpoint Moisture Monitors Discovered Less than Requirements.Caused by Inaccurate Flow Elements | | | 05000267/LER-1980-014-03, /03L-0:on 800311,during Reactor Shutdown,Emergency Feedwater Snubber BFS-228E Observed to Be Missing Pin at Piston Rod Eye & Rendered Inoperable.No Cause Stated for Missing Pin.New Pin Fabricated & Installed | /03L-0:on 800311,during Reactor Shutdown,Emergency Feedwater Snubber BFS-228E Observed to Be Missing Pin at Piston Rod Eye & Rendered Inoperable.No Cause Stated for Missing Pin.New Pin Fabricated & Installed | | | 05000267/LER-1980-014, Forwards LER 80-014/03L-0 | Forwards LER 80-014/03L-0 | | | 05000267/LER-1980-015, Forwards LER 80-015/03L-0 | Forwards LER 80-015/03L-0 | | | 05000267/LER-1980-015-03, /03L-0:on 800320,during Operation at Approx 60% Power,Emergency Feedwater Header Supply to Loop 2 Helium Circulation Water Turbine Drives Was Isolated to Repair Leaking Pressure Control Valve.Caused by Loose Block Bolt | /03L-0:on 800320,during Operation at Approx 60% Power,Emergency Feedwater Header Supply to Loop 2 Helium Circulation Water Turbine Drives Was Isolated to Repair Leaking Pressure Control Valve.Caused by Loose Block Bolt | | | 05000267/LER-1980-016, Forwards LER 80-016/03L-0 | Forwards LER 80-016/03L-0 | | | 05000267/LER-1980-016-03, During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Dirt Accumulation in Electrical Switches.Switches Replaced | During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Dirt Accumulation in Electrical Switches.Switches Replaced | | | 05000267/LER-1980-017-03, /03L-0:on 800311,w/plant Shut Down Due to Loss of Main Cooling Water Return Line,Plant Liquid Effluent Sample Required by SR Nr 1.1 Not Taken.Caused by Preempted Time Due to Plant Upset.Sampling Resumed on Next Shift | /03L-0:on 800311,w/plant Shut Down Due to Loss of Main Cooling Water Return Line,Plant Liquid Effluent Sample Required by SR Nr 1.1 Not Taken.Caused by Preempted Time Due to Plant Upset.Sampling Resumed on Next Shift | | | 05000267/LER-1980-017, Forwards LER 80-017/03L-0 | Forwards LER 80-017/03L-0 | | | 05000267/LER-1980-018-03, /03L-0:on 800327,w/plant Operating at Approx 51% Thermal Power,One Loop 2 Hot Reheat Header Activity Monitor Found Inoperable.Caused by Failure of Motorola Chip (MPS-66A)in Operational Amplifier to Detector Preamp | /03L-0:on 800327,w/plant Operating at Approx 51% Thermal Power,One Loop 2 Hot Reheat Header Activity Monitor Found Inoperable.Caused by Failure of Motorola Chip (MPS-66A)in Operational Amplifier to Detector Preamp | | | 05000267/LER-1980-018, Forwards LER 80-018/03L-0 | Forwards LER 80-018/03L-0 | | | 05000267/LER-1980-019-03, /03L-0:on 800327,operation in Degraded Mode of Limiting Condition 4.2.10 Occurred on Six Occasions & Reactor Dewpoint Limit of Limiting Condition 4.2.11 Was Exceeded Once.Caused by Problem W/Buffer Helium Sys | /03L-0:on 800327,operation in Degraded Mode of Limiting Condition 4.2.10 Occurred on Six Occasions & Reactor Dewpoint Limit of Limiting Condition 4.2.11 Was Exceeded Once.Caused by Problem W/Buffer Helium Sys | | | 05000267/LER-1980-019, Forwards LER 80-019/03L-0 | Forwards LER 80-019/03L-0 | | | 05000267/LER-1980-020, Forwards LER 80-020/03L-0 | Forwards LER 80-020/03L-0 | | | 05000267/LER-1980-020-03, During Testing,Two of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt in Switches.Switches Replaced | During Testing,Two of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt in Switches.Switches Replaced | | | 05000267/LER-1980-021, Forwards LER 80-021/03L-0 | Forwards LER 80-021/03L-0 | | | 05000267/LER-1980-021-03, /03L-0:on 800421,w/reactor Shut Down,Main Steam Pressure Low Instrument Discovered Inoperable.Caused by Bad Connection Due to Dirty Contact.Contacts Cleaned & Module Returned to Svc | /03L-0:on 800421,w/reactor Shut Down,Main Steam Pressure Low Instrument Discovered Inoperable.Caused by Bad Connection Due to Dirty Contact.Contacts Cleaned & Module Returned to Svc | | | 05000267/LER-1980-022-03, /03L-0:on 800424,during 800424-0510,operation W/Total Primary Coolant Oxidants Greater than 10 Ppm & Average Core Outlet Temp Greater than 1,200 Degrees Occurred on Five Occasions.Caused by Reaction of Moisture W/Core | /03L-0:on 800424,during 800424-0510,operation W/Total Primary Coolant Oxidants Greater than 10 Ppm & Average Core Outlet Temp Greater than 1,200 Degrees Occurred on Five Occasions.Caused by Reaction of Moisture W/Core | | | 05000267/LER-1980-022, Forwards LER 80-022/03L-0 | Forwards LER 80-022/03L-0 | | | 05000267/LER-1980-023-03, /03L-0:from 800507-17,plant Was Operated W/Emergency Feedwater Header Supply to Helium Circulator Water Turbine Drives of One Loop Isolated on Four Separate Occasions.Caused by Valve Leakage & Line Leakage | /03L-0:from 800507-17,plant Was Operated W/Emergency Feedwater Header Supply to Helium Circulator Water Turbine Drives of One Loop Isolated on Four Separate Occasions.Caused by Valve Leakage & Line Leakage | | | 05000267/LER-1980-023, Forwards LER 80-023/03L-0 | Forwards LER 80-023/03L-0 | | | 05000267/LER-1980-024, Forwards LER 80-024/03L-0 | Forwards LER 80-024/03L-0 | | | 05000267/LER-1980-024-03, /03L-0:on 800512,at 47% Thermal power,1C Circulator Seal Differential Pressure Decreased Significantly Due to Unknown Causes.Equalizing Valve Closed & 1C Circulator Buffer Helium Pressure Returned to Normal | /03L-0:on 800512,at 47% Thermal power,1C Circulator Seal Differential Pressure Decreased Significantly Due to Unknown Causes.Equalizing Valve Closed & 1C Circulator Buffer Helium Pressure Returned to Normal | | | 05000267/LER-1980-025-03, /03L-0:on 800523,during 800523-30,total Primary Coolant Oxidants Were Greater than 10 Ppm W/Average Core Outlet Temp Above 1,200 F on Six Occasions.Caused by Moisture Increase & Carbon Monoxide & Dioxide Combination | /03L-0:on 800523,during 800523-30,total Primary Coolant Oxidants Were Greater than 10 Ppm W/Average Core Outlet Temp Above 1,200 F on Six Occasions.Caused by Moisture Increase & Carbon Monoxide & Dioxide Combination | |
|