Summary of 800613 Meeting W/Util Re Structural & Geotechnical Engineering Review W/Emphasis on Svc Water Intake Structure
ML19318C596
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/23/1980
From: Houghton T
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8007020061
Download: ML19318C596 (5)


Text

__

w f "%y p

f i e qf( %,

y.

UNITED STATES NUCLEAR REGULATORY COMMISSION gj sN C

W ASHINGTON, 0. C. 20555 j

%,, ] (**f ~

n.

JUN 2 31380 Docket No.:

50-395 APPLICANTS: SOUTH CAROLINA ELECTRIC AND GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY

-FACILITY:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO. 1

SUBJECT:

SUMMARY

OF MEETING HELD ON JUNE 13, 1980 WITH SOUTH CAROLINA ELECTRIC AND GAS COMPANY On June 13, 1980, we met with representatives of South Carolina Electric and Gas Company (SCE&G) and its consultants to discuss the structural and geotechnical engineering review of the Summer facility. The persons attend-ing the meeting are listed in Enclosure _1.

The majority of the meeting was devoted to a-discussion of the service water intake structure. SCE&G was provided with a list of additional questions which are listed in Enclosure 2.

Thomas C. Houghton Licensing Branch 3 Division of Licensing

Enclosures:

As stated cc: See next page

8007020 N A

4 w

1

.N.

4 Mr. E. H. Crews, Jr.

.Vice President & Group Executive Engineering & Construction South Carolina. Electric & Gas Company P. O. Box 764 Columbia, South Carolina 29281 cc: Mr. H. T. Babb General Manager - Nuclear Operations

& System-Planning South Carolina Electric & Gas Company P. O. Box 764 Columbia, South Carolina 29218 G. H. Fischer, Esq.

Vice President & Group Executive South Carolina Electric & Gas Company i

P. O. Box 764 Columbia, South Carolina 29218 Mr. William C. Mescher.

~

President & Chief Executive Officer South Carolina Public Service Authority 223 North Live Oak Drive Moncks Corner, South Carolina 29461 Mr. William A. Williams, Jr.

.Vice President South Carolina Public Service Authority 223 North Live Oak Drive Moncks Corner, South Carolina 29461 Wallace S. Murphy, Esq., General Counsel South Carolina _Public Service Authority 223 North Live Oak Drive Moncks Corner, South Carolina 29461 Troy B. Conner, Jr., Esq.

Conner, Moore & Corber 1747 Pennsylvania Avenue, N. W.

Washington, D. C.

20006 4

Mr. Mark B. Whitaker, Jr.

Manager - Nuclear Licensing South Carolina Electric & Gas Company P. O. Box 764 Columbia, South Carolina 29218

w 2-i -

cc: Mr. O. W. Dixon,' Group Manager Production Engineering South Carolina Electric & Gas Company l-

.P. O. Box 764 Columbia, South Carolina 29218 Mr. Brett Allen Bursey Route 1, Box 93C Little Mountain, South Carolina-29076 Resident Inspector /SPS-c/o U. S. Nuclear Regulatory Commission P.' 0. Box 1047 Irmo, South Carolina - 29063 e

k 1

t 0

k i

t e

.,e-

i s

+

ENCLOSURE 1

' ATTENDANCE NAME ORGANIZATION T. C. Houghton.

NRC/DL Peter-Rieck

. Gilbert /Comonwealth -

Frank.Waller.

Woodward. --Clyde Consultants Arthur H. Dvinoff

. Woodward.Clyde Consultants Robert Whorton :

SCE&G

. David.C..Jeng NRC/SEB S. B. Kim.

NRC/SEB

'J..T.

Chen NRC/HGEB J. E. Lisney GAI K. E. Nadland.

GAI C. Chen GAI M. B. Whitaker SCE&G Licensing Mgr

-.GAI = Gilbert Associates,-Inc.

l

['

ENCLOSURE 2 ADDITIONAL NRC QUESTIONS ON THE V. C. SUMf1ER SERVICE WATER INTAKE STRUCTURE 1.

Evaluate the existing structure to determine safety margin a;sinst NRC SRP 3.8.4.

2.

If there were longitudinal separation and transverse relative displacement, evaluate the functionability of existing structure, with a conservative a'sumption on the extent of through structure cracking.

3.

Describe'the engineering evaluation criteria of the existing structure in

'the: longitudinal direction. Such criteria should be given in terms of quantative values of stress,' strain, force or deflections. Justify why such criteria are adequate for seismic load.

Provide any examples where such criteria have been used (ASf1E, ACI, AISC etc.) possibly in nuclear

' plant design.

4.

Describe the action that would be taken if the acceptance criteria were to be exceeded (settlement monitoring).

5.

If there were through thickness cracks, determine the differential hydro-static pressure between inside and outside the structure with pumps in operation.