Deficiency Rept Re Possible Improper Rocker Arm Prelube Pump Operation.Pump Could Fail to Start as Result of Hydraulic Lock in Cylinder.Instituting Further Review of Other Installation Electrical Schematics & Instruction Manuals
ML19318C329
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/27/1980
From: Moriarty J
COLT INDUSTRIES, INC.
To:
References
REF-PT21-80-237-000 NUDOCS 8007010357
Download: ML19318C329 (2)


Text

_- .

Colt Industries Fairbanks Morse Engine Division 701 Lawton Avenue

@ Beloit. Wisconsin 53511 608/364 4411 June 27,1980 Of fice of inspection & Enforcement U. S. Nucle e' Regulatory Commission 799 Roo elt Road Glen yn, Ill. 60137 tention: Mr. James G. Keppler, Director, Region III

Subject:

Colt Industries-Fairbanks Morse Er:gine Division Emergency Diesel Generators South Carolina Electric & Gas Co.-Summer Station Part 21 Report-Possible Improper Rocker Arm Prelube Pump Operation Gentlemen:

We have determined that the reker arm prelube pumps and associated

~

controls used with the two Colt-Pie'i' tick Type PC-2 Diesel Generator Sets installed at South Carolina Electric c Gas Co.-Summer Station permit opera-tion in a manner that could lead to a failure to start as a result of a hydraulic lock in a cylinder.

This pump is presently controlled by an on/ auto /off switch. In the auto position, the pump operates continuously while the engine is shut down and will be shut down when the engine begins to run. This nearly continuous operation could lead to oil entering a cylinder through the valve guides.

While unlikely, this could result in cylinder clearance volume becoming filled with oil and hydraulically locking that cylinder.

We propose to modify the system by replacing the on/ auto /off switch with an on/off switch. We will modify the instruction manuals to indicate the pump

- should be operatd for five minutes once a week, based on a maximum exercising

ycle of 31 days contained in Reg. Guide 1.108.

This is the only installation with the on/ auto /off switch operated in thu fashion. We are instituting a further review of all other installation elec cical schematics and instruction manuals to insure that the potential of a hydraulic lock does not exist.

The only operating facility with the potential problem is Alabama Power Company's Farley Plant. They have an on/off switch with an instruction manual which indicates the pump should be operated 10 minutes prior to exercising. bO/7 By copy of this letter, they are being advised of the potential problem witn excessive operation.

S We will advise you of the final resolution of the Summer installation j and the results of our investigation into other units.

g 800O.103fp y

-~/ - o 1 l

I U. S. Nuclear Regulatory Commission June 27, 1980 Page 2 Very truly yours, J.Ahl M. Moriarty MANAGER UTILI ALES JMM:Je cc: South Carolina Electric & Gas Co.