Advises That Alternate Insps Will Be Performed in Lieu of ASME Visual Exams for 1980 Refueling,Per Wg Counsil to Dl Ziemann.Formal Docketed Waiver of Requirement Still Requested
ML19318C303
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/10/1980
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
B-10016, NUDOCS 8007010328
Download: ML19318C303 (2)


Text

4

~

NORTHEAST UTHJTIES 3

/J.Zlf.72'.U.Zf~

N0ro*aEcoNNECTICUT 06101

".7::"L7.':C'.: ""~

m men k

t J ::= : ::' '.C June 10, '.980 Docket No. 50-245 B10016 Director of Nuclear Reactor Regulation Attn:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch #5 U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Reference:

(1)

W. G. Counsil letter to D. L. Ziemann dated April 9, 1980.

Gentlemen:

Millstone Nuclear Power Station, Unit No.1 decirculation Pump Inservice Insnection As required by 10CFR50.55a(g), Northeast Nuclear Energy Company (NNECO) notified the NRC Staff in Reference (1) of the impracticability of performing the ASME Code Section XI Category B-L-2 examinations for the reactor recirculation pump casings at Millstone Unit No. 1.

In that letter, we requested relief from the requirements of Table IWB-2500 until major maintenance needs to be performed on the pump. We listed a number of reasons for granting the postponement; we identified alternate examinations that would be performed; and we requested a response by August 30, 1980.

In subsequent conversations, we requested a verbal indication from the Staff by May,1980, as to the likelihood of a written Staff response by the requested date.

This was necessary because of the lead times required for obtaining spare parts, special tools, and for refueling outage planning.

Based on those conversations, NNECO has determined that we must assume the burden of responsibility in concluding that the information and planned alternate inspections that were submitted in Reference (1) justify the pos tponement. Thus, the alternate inspections will be performed in lieu of the ASME Code Section XI Category B-L-2 visual examinations which are not being scheduled for the 1980 refueling outage.

00/

s

/ O 8007 010 g$$

s

" ' A formal' docketed waiver from the NRC is still requested, in accordance with 10CFR50.55a (g).. Ilowever, we perceive ' the information dock' ted in Reference (1).

e

- and herein, is~ satisfactory for NNECO to proceed as described above, and. in full agreement with the Staff.

Should you have any questions, please contact us.

F Very truly youro, NORTIIEAST NUCLEAR ENERGY C0!!PANY s

1 /

j

~f

'. ($l JL !.

W. D.- Counsil Senior Vice President 4