Responds to IE Bulletin 79-17,Revision 1, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Visual Insp Required by Item 2(a) Was Completed on Unit 1 W/No Corrective Actions Necessary
ML19318C246
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/09/1980
From: Gilberts D
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-17, NUDOCS 8007010260
Download: ML19318C246 (1)


Text

usus NORTHERN STATES POWER COMPANY MI N N E A PO LI S M IN N E S OTA 55401 June 9, 1980 Mr. James G. Keppler Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road ,

Glen Ellyn, IL 60137 -

Dear Mr. Keppler:

PRAIRIE ISLAND NUCLEAR GENERATING PIANT Dockets No. 50-282 and 50-306 In response to Item 6 of IE Bulletin 79-17, Revision 1, the visual inspection required by Item 2(a) of the Bulletin was satisfactorily completed on Unit 1 in May 1980; no corrective actions were necessary.

Yours truly, W -

D. E. Gilberts Vice President Power Production cc: Mr. G. Charnoff l NRC Office of Inspection and Enforcement Washington, D. C.

DEG:nk l

.g 13 W ,