ML19318C246

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-17,Revision 1, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Visual Insp Required by Item 2(a) Was Completed on Unit 1 W/No Corrective Actions Necessary
ML19318C246
Person / Time
Site: Prairie Island  
Issue date: 06/09/1980
From: Gilberts D
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-17, NUDOCS 8007010260
Download: ML19318C246 (1)


Text

usus NORTHERN STATES POWER COMPANY MI N N E A PO LI S M IN N E S OTA 55401 June 9, 1980 Mr. James G. Keppler Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

PRAIRIE ISLAND NUCLEAR GENERATING PIANT Dockets No. 50-282 and 50-306 In response to Item 6 of IE Bulletin 79-17, Revision 1, the visual inspection required by Item 2(a) of the Bulletin was satisfactorily completed on Unit 1 in May 1980; no corrective actions were necessary.

Yours truly, W

D. E. Gilberts Vice President Power Production cc:

Mr. G. Charnoff NRC Office of Inspection and Enforcement Washington, D. C.

DEG:nk

.g 13 W 8007010 2 @