Forwards Response to IE Bulletin 79-01B for Ja Fitzpatrick Nuclear Power Plant
ML19318C188
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/11/1980
From: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19318C189 List:
References
IEB-79-01B, IEB-79-1B, NUDOCS 8007010164
Download: ML19318C188 (3)


Text

-

()

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITzPATRICK N uct. EAR POWER PLANT S

RAYMCND J. PASTERNAK P.O. BOX 41 Re:Weat Manage, Lycoming, New York 13093 315-342-3840 June 11, 1980 8bl/I$ [

MO samAL:

JAFP 80-494 Boyce H. Grier, Director United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA.

19406

SUBJECT:

NRC I&E BULLETIN NO.79-01B ENVIRONMENTAL QUALIFICATION OF CLab 1E EQUIPMENT A(j

REFERENCES:

Letter - R. J Pasternak to B. H. Grier Dated April 14, 1980 Serial No. JAFP 80-290 Letter - R. J. Pasternak to B.H. Grier Dated May 23, 1980 Serial No. JAFP 80-436

Dear Mr. Grier:

The FitzPatrick Plant and its Architect-Engineer have completed and attach, as Enclosure 1, the second phase of the response to the subject bulletin. As noted in our letter of May 23, 1980, the report has been revised to include a system index and cross reference for simplification.

In addition, an equipment qualification plan has been added to Section 01 of the report which contains a number of clarifying paragraphs and a description of the use of the report.

It should be noted. also that a number of incomplete items are listed in the report. The majorey of these incomplete items require information from the General Electric Company which the FitzPatrick plant staff expects to receive in September,1980.

n Ims 00CtlMENT C j

U L

8007010&'f;

Boyce H. Grier, Director June 11, 1980

[~).

United States Nuclear Regulatory Commission JAFP 80-494 U

SUBJECT:

NRC I&E BULLETIN NO.79-018 Page.

.f you have any questions, please feel free to contact us.

Very truly your,,j p

/

~

RJP:VC:brp RAYMOND J.

ASTERNAK Enclosure RESIDENT MANAGER Subscribed and sworn to before me this lith day of June,1980 R R.P W Notary Pplic DISTRIBUTION:

BEVERLY R. PRUCNAL. N628499 Notary Public - State of New York United States Nuclear Regulatory Commission myc N $ $ $ "dcI $$gjg, Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, DC 20555 George T. Berry, PASNY, NY0 G. M. Wilverding, PASNY, NY0 J. P. Bayne, PASNY, NY0 M. C. Cosgrove, PASNY, JAF D. Holliday, PASNY, JAF NRCB 79-01B File Document Control Center W. A. Matson, S&W/ Boston R. F. Thiel, S&W/New York i

l 4

0

'W W K$V4 y

DISTRIBUTION RESPONSES TO BULLETIN 79-01 B j

E. Jordan 3 copies IE FILES 1 copy l

NRR(Zoltan Rosztoczy) l copy CENTRAL FILES 1 copy

(

&y gor 1 ce,,

LPDR 2 copies hh g p#W NS1C 1 ce,,

p

' ggassa.

  • ===

we.

'O

  • a

.O t

.