Forwards 800616 Further Commission Guidance for Power Reactor Ols,Statement of Policy, & Commission 800609 Statement of Interim Policy, Nuclear Power Plant Accident Consideration Under NEPA of 1969
ML19318B959
Person / Time
Site: Crane 
Issue date: 06/17/1980
From: Swartz L
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Herbein J, Kepford C, Trowbridge G
Environmental Coalition on Nuclear Power, METROPOLITAN EDISON CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
References
NUDOCS 8006300335
Download: ML19318B959 (3)


Text

to now

'[/. - ()

NUCLEAR REGULATORY COMMISSION

'c, UNITED STATES

.*}-

WASHING TON, D. C. 20555

"... [

June 17,1980 Multiple Addressees (See Attached Service List)

In the Matter of METROPOLITAN EDIS0N COMPANY, ET AL.

(Three Mile Island, Unit TT -

Docket No. 50-289

Dear Parties:

Enclosed is a Statement of Policy dated June 16, 1980 which gives further guidance for the issuance of operating licenses. NUREG-0694, "TMI-Related Requirements for New Operating Licenses," which is referred to in the Conrnission's Statement will be sent to you under separate cover.

Also enclosed is a Statement of Interim Policy issued by the Commission on June 9,1980 and published in the Federal Register on June 13, 1980.

The Statement is entitled, " Nuclear Power Plant Accident Consideration Under the National Environmental Policy Act of 1969."

Sincerely,'

Lucinda Low Swartz Ccunsel for NRC Staff

Enclosures:

As Stated cc w/ enclosures:

Ivan W. Smith, Esq., Chairman Dr. Walter H. Jordan Dr. Linda W. Little 800680033 5 (c

LIST OF PARTIES George F. Trowbridge, Esq.

Mr. Thomas Gerusky Shaw, Pittman, Potts & Trowbridge Bureau of Radiation Protection 1800 M Street, N.W.

Dept. of Environmental Resources Washington, D. C.

20006 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Karin W. Carter, Esq.

505 Executive House Mr. Marvin I. Lewis P. O. Box 2357 6504 Bradford Terrace Harrisburg, Pennsylvania 17120 Philadelphia, Pennsylvania 19149 Honorable Mark Cohen Metropolitan Edison Company 512 D-3 Main Capital Building ATTN:

J. G. Herbein, Vice President Harrisburg, Pennsylvania 17120 P. 0. Box 542 Reading, Pennsylvania 19603 Mr. Steven C. Sholly 304 South Market Street Ms. Jane Lee Mechanicsburg, Pennsylvania 17055 R.D. 3; Box 3521 Etters, Pennsylvania 17319 John Levin, Esq.

Pennsylvania Public Utilities Comm.

Walter W. Cohen, Consumer Advocate Box 3265 Department of Justice Harrisburg, Pennsylvania 17120 Strawberry Square,14th Floor Harrisburg, Pennsylvania 17127 Ms. Frieda Berryhill, Chairman Coalition for Nuclear Power Plant Holly S. Keck Postponement Anti-Nuclear Group Representing York 2610 Grendon Drive 245 W. Philadelphia Street Wilmington, Delaware.19808 York, Pennsylvania 17404 Chauncey Kepford Ms. Ellyn R. Weiss Judith H. Johnsrud Sheldon, Harmon, Roisman & Weiss Environmental Coalition on Nuclear Power 1725 I Street, N.W.

433 Orlando Avenue Suite 506 State College, Pennsylvania 16801 Washington, D. C.

20006 Robert Q. Pollard Jordan D. Cunningham, Esq.

Fox, Farr and Cunningham I

609 Montpelier Street 2320 North 2nd Street Baltimore, Maryland 21218 Harrisburg, Pennsylvania 17110 l

Allen R. Carter, Chairman Ms. Marjorie M. Aamodt Joint Legislative Committee on Energy R.D. #5 Post Office Box 142 Coatesville, Pennsylvania 19320 Suite 513 Senate Gressette Building

  • Atomic Safety and Licensing Appeal Board Columbia, South Carolina 29202 U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Theodore A. Adler, Esq.

WID0FF REAGER SELK0WITZ & ADLER

  • Atomic Safety and Licensing Board Panel Post Office Box 1547 U. S. Nuclear Regulatory Commission Harrisburg, Pennsylvania 17105 Washington, D. C.

20555 Ms. Karen Sheldon

  • Docketing and Service Section Sheldon, Harmon, Roisman & Weiss U. S. Nuclear Regulatory Commission 1725 I Street, N.W.

Washington, D. C.

20555 Suite 506 Washington, D. C.

20006 i

N f

i i

p T2 pI cv O

k D00 RATED 3

vsNac U.S.

NUCLEAR REGULATORY COMMISSION 0-JUN 161980

  • 1J
p. O' ~ c' the i,erttry l

FURTHEP. COM'irSSION GUIDANCE w,w... ( :,g F07 H.W CR PF.ACTOI. OPE.U.ATING LICENSES Q

Pcto f,

4"M -

.s STATF.Fr.N P OF POLICY

  • I.

B ACKGLC UN.

Aftt.: th: Mr.r:h 1979 accident at Three Mile Island, Uni t 2, the CTwissior, dirette$ its technical review resources to assuring the sa'ety of operating powcr reactors rat.hcr than to the issuar:e of new licenses, h.rthernore, t.he Comrnission decided that power l

reactor licensino should nc t. co : tint.o until the af.scssment of.he TMI &ccident had been substdntially completed u.ad comprehensive itaptcvements ire b :th the operata-A"d regulation of n r.:le.

pm r p'.e t s h ad b+ e n se t in m..ir.n.

At e tr,ee'ir; on May 33, IP79, the Nu clerar Regulatory conc.issi,:.

decided to issae pclicy guidance addressing general principles for reach:.r; licensing de ition-ara to provide speciflhguida.t for near-t.e : operating licen =:e c.uc a. /

Ir. Hovenber 1979, t'. e Nu=3 ear Regula. coly Co:.C ssion issued t.he policy guidance in th..

l forTr. of an aman haer.t to 10 CFR Phrt 2 of its regult.tions,U 1

describir.y th approach w be tsken by the Commissicn regardi.s N

-hhIh.h. (kf[jhffk hlar, the Commia:,ic n ncted

(

' gnidance on change" in DUPLICATE DOCUMENT 1

now acted on t.hree Entire document previously c

entered into system ug er onsideration to ir.t.a..c ANo TOOlol90 %3:

a and accide"t, and is e

No. of pages:

Ch?

1M$0 I @ff @ *$ R R90RCf.i-[JBf., r.

  • g