ML19318B718

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 70 to License DPR-44
ML19318B718
Person / Time
Site: Peach Bottom 
Issue date: 06/13/1980
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19318B716 List:
References
NUDOCS 8006270368
Download: ML19318B718 (2)


Text

. -.....

7590-01 UNITED STATES NUCLEAR REGULATORY C0f94ISSION DOCKET NO. 50-277 f

PHILADELPHIA ELECTRIC COMPANY, ET AL.

NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Comission) has issued Amendment No. 70 to Facility Operating License No. DPR-44, issued to Philadelphia Electric Company, Public Service Electric and Gas Company, Delmarva Power and Light Company, and Atlantic City Electric Company, which revised Technical Speci-fications for operation of the Peach Bottom Atomic Power Station, Unit No. 2 (the facility) located in York County, Pennsylvania. The amendment is effective as of its date of issuance.

The amendment revises the Technical Specifications for Cycle 5 operation and involvest (1) modification of the average power range monitor and rod-block monitor setpoint equations, (2) deletion of the fuel densification power spiking penalty for the 8x8 fuel, (3) deletion of the reactor vessel pressure operating limit, (4) increase in the Standby Liquid Control System capacity, (5) use of two control rods containing hafnium control pins, and (6) extension of exposure times on the Lead Test Assemblies.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amerided (the Act). and the Comission's rules l

and regulations. The Comission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

8006270

~

? -

7590-01 The Comission has detemined that the issuance of this amendment will not 3

result in any significant environmental impact and that pursuant to 10 CFR

{

551.5(d)(4) an environmental impact statement or negative declaration and environ-mental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the application for amendment dated March 3,1980, as supplemented April 28,1980,(2) Amendment No. 70 to License No. DPR-44, and (3) the Comission's related Safety Evaluation. All of these items are available for public inspection at the Comission's Public Document Room,1717 H Street, N.W., Washington, D. C. and at the Government Publi-cations Section, State Library of Pennsylvania, Education Building, Comonwealth and Walnut Streets, Harrisburg, Pennsylvania. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C. 20555, Attention: Director, Division of Licensing.

t Dated at Bethesda, Maryland, this 13th day of June 1980.

FOR THE NUCLEAR REGULATORY COMMISSION x

Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing i

4 h

__.