ML19318B653

From kanterella
Jump to navigation Jump to search
Forwards LER 80-053/03L-0
Date released: 11/28/2019 Download: ML19318B653


LER 80-053/03L-0:on 800601,w/unit in Cold Shutdown,Rhr Pumps de-energized for More than 1-h.Caused by Need to Repair Valve Packing Leak Resulting from Personnel Error.Pump Returned to Svc Following Repair
ML19318B654
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/20/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19318B654 (2)
Forwards LER 80-053/03L-0
ML19318B652
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/20/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19318B652 (1)