Notice of Granting of Interim Relief from ASME Section XI Inservice Insp & Testing Requirements
ML19318B356
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/10/1980
From: Clark R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19318B351 List:
References
NUDOCS 8006260007
Download: ML19318B356 (2)


Text

,

UNITED STATES NUCLEAR REGULATORY COMMISSION 7590-01 0

DOCKET NO. 50-344 FORTLAND GENERAL ELECTRIC COMPANY, ET AL.

NOTICE OF GRANTING OF INTERIM RELIEF FROM ASME SECTION XI

. INSERVICE INSPECTION AND TESTING REQUIREMENTS The U. S. Nuclear Regulat'ory Commission (the Comission) has granted relief from certain requirements of the ASME Code,Section XI, " Rules for Inservice -Inspection of Nuclear Power Plant Components" to Portland General Electric Company,.Scific Power and Light Company and the City of Eugene, Oregon.

The relief relates,to the inssrvice inspection and testing program for Trojan Nuclear Plant (the. facility) located in Columbia County, Oregon.

The ASME Code requirements are incorporated by reference into the Commission's rules and regu-lations in 10 CFR Part 50. The relief is effective as of its date of issuance.

The relief consists of exemption from the requirements for mea'suring certain

. parameters in the pump testing program, alternative schedules for testing in the valve testing program, and exemption from performing certain pressure vessel, piping, and other weld inspections in the inservice inspection program.

The j

relief granted.is temporary and interim in nature pending completion of final

'NRC review and evaluation.of the licensee's inservice inspection and testing pro-gram.

The request for relief complies with the standards and requirements of the Atomic Energy Act _of 1954,-as amendedL(the Act), and the Conmission's rules and l

. regulations in 10 CFR Chapter I, which are set forth in the letter granting relief.

Prior public notice of this action was not required since the granting of this relief from ASME Code requirements does not involve a significant hazards consideration.

80.06260 Ocy"/

7590-01

+

2-The Commission has determined that the granting of this relief

~will not. result in any significant environnental impact and that pursuant to' 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and -enviromnental impact appraisal need not be prepared in connection with this action.

~

For further details with respect to this action, see (1) the requests for relief dated August 14 and December 28,1979, and (2) ' he t

Commission's letter to the licensee dated June 10, 1980.

These items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D. C. and at the Columbia County Courthouse, Law Library Circuit Cour,t Room, S+. Helens, Oregon ' 97051. A copy of item (2) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.

20555, Attention: Director, Division of Licensing. '

Dated at Bethesda, Maryland, this 10th day of June 1980.

FOR THE-NUCLEAR REGULATORY COMMISSION

(

obert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing l