IE Insp Rept 50-267/80-08 on 800401-30.Noncompliance Noted: Failure to Meet Tech Spec for Diesel Generator Day Tank Levels
ML19318A710
Person / Time
Site: Fort Saint Vrain 
Issue date: 05/05/1980
From: Collins R, Dickerson M, Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19318A704 List:
References
50-267-80-08, 50-267-80-8, NUDOCS 8006240055
Download: ML19318A710 (6)


See also: IR 05000267/1980008

Text

m

-

.

O

U. S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

IE Inspection Report No. 50-267/80-08

Docket No. 50-267

License No. DPR-34

Licensee:

Public Service Company of Colorado

P. O. Box 840

Denver, Colorado

80201

Facility Name:

Fort St. Vrain Nuclear Generating Station

Inspection at:

Fort St. Vrain Site, Platteville, Colorado

Inspection Conducted: April 1-30, 1980

m

Inspectors:

7

(Md h

b

[ f'78

M. W. Dickerson, Senior Resident Reactor Inspector

Date

7 % /W

&

p e ro

R. E. Collins, Resident Reactor Inipector

Date

a

/

Approved By:

b

b

T. F. Westerman, Chief, Reactor Projects Section

Date

Inspection Summary

Inspection April 1-30, 1980 (Report No. 50-267/80-08)

J

Areas' Inspected: Routine, announced inspection of Review of Previous Items of

Noncompliance; Surveillance; Maintenance; Operational Safety Verification; and

Review of Bulletins / Circulars. The inspection involved 169 inspector-hours

on-site by two (2) NRC inspectors.

Results: Within the five (5) areas inspected, one item of noncompliance was

identified (Infraction - Failure to meet Technical Specification for Diesel

Generator Day Tank Levels, Paragraph 3) .

800624005 8

__

._

-

.

,

2

DETAILS

1. .

Persons Contacted

L. Brey, QA Manager

W. Craine, Maintenance Supervisor

W. Franek, Results Supervisor

W.. Franklin, Shift Supervisor

J. Gamm, Supervisor Technical Services

E.-Hill, Operations Superintendent

F. Mathie, Operations Manager-

J.' Van Dyke, Shift Supervisor

D. Waresbourg, Manager Nuclear Production

-The inspectors also contacted other plant personnel including reactor

operators, maintenance men, electricians, technicians and administrative

personnel.

2.

Li,censee Action on Previous Inspection Findings

(Closed) Item of Noncompliance (50-267/8001): Failure to Maintain

Deisel Generator Day Tanks at required level during power operation.

The

inspector reviewed the licensee's corrective action outlined in PSC

Letter P-80050 dated March 17, 1980.

(Closed) Item of Deviation (50-267/8001): Failure to Warm-Up Test instru-

ments in accordance with manufacturer's recommendations. Tags have been

placed on the instruments indicating the warm-up requirement.

(Closed) Item of Noncompliance (50-267/8002-1): Test equipment not

identified on records of surveillance test 504.1.1.4c-d for dates of

January 5-8, 1980. The data sheet now used for the surveillance list

has been-revised to include a space for daily recording of the test

instrument used.

(Closed) Item of Noncompliance (50-267/8002-2): Calibrations performed

utilizing outdated procedure revisions. The inspector reviewed the

i

licensee's corrective action as outlined in PSC letter P-80077 dated

April 11, 1980. Responsibility for this action has been assigned to the

Scheduling Supervisor.

Previous surveillance tests performed to outdated

test procedures were verified by the inspector to have since been performed

using the latest procedures.

3.

. Operational Safety Verification

The inspector reviewed licensee activities to ascertain that the facility

is being operated safely and in conformance with regulatory requirements,

and that the licensee's management control system is effectively dis-

. charging its responsibilities for continued safe operation.

The review

was conducted by direct observation of activities, tours of the facility,

.

-

-

,

... . ,

._,- -

-

. - -

,.

..

. - . - .

, . . - . ~ . - . _ . . - . - , , -

.

. _ .

_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ . _ _ _

.

.

3

~

interviews and discussions with licensee personnel, independent verifi-

cation of safety system status and limiting conditions for operations,

and review of facility records.

Included in the inspection were observation of control room activities,

review of operational logs, records, and tours of accessible areas.

Logs and records reviewed included:

Shift Supervisor Logs

.

Reactor Operator Logs

.

Technical Specification Compliance Log

.

Operating Order Book

.

System Status Log

.

Form 1 Log (Jumper Log)

.

Plant Trouble Reports

.

Selective Valve Lineups

.

During tours of accessible areas, particular attention was directed to

the following:

Monitoring Instrumentation

.

Radiation Controls

.

Housekeeping

.

Fluid Leaks

.

Piping Vibration

.

Hanger / Seismic Restraints

.

Clearance Tags

.

Control Room Manning

.

Annunciators

.

The operability of selected systems or portions of systems were verified

by walkdown of the accessible portions.

The observations were for the:

Reserve Shutdown System

.. -.

. _ - _ _ _ _ _ _ _

_ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

.

.

4

PCRV Safety-Valves

PCRV Secondary Closures

Procedures were also reviewed and observations were made for the drawing

of samples and performance of analysis associated with liquid waste

release No. 384 and gas waste release No. 432. The samples drawn and

analyzed associated with the liquid waste release were RC 15361 and

RC 15362. The samples drawn and analyzed associated with the gas

waste release were RC 15370 (Grab Sample) and RC 15369 (Tritium Analysis).

All were well below 10 CFR 20 release limits.

During a tour of the facility on April 2,1980, with the reactor at 57%

power, the inspector observed that both diesel generator day tank levels

were at approximately.385 gallons, well below that required by T/S

LCO 4.6.1 which' states in part that:

. . . Both the diesel-generator

"

.

sets are operable, including the following:

. 500 gallons in each day

. .

tank . . . ." Moreover, an Operations Order reissued April 1,1980,

by the Superintendent of Operations requires that the day tanks be filled

,

'

after any run of the diesel generators. The latter requirement was

apparently not effective in' maintaining the required level as both

diesel generators had been run on March 31, 1980, and the tanks had

appsrently not been filled after the run.

The failure to comply with the T/S requirement as indicated above was

,

discussed with the licensee who was informed that this was an apparent

item of noncompliance for failure to adhere to the Technical Specifi-

cation ~ requirements.

The inspector had no additional questions in this area.

4.

Maintenance

The inspector reviewed records and observed work in progress to ascertain

that maintenance of activities are being conducted in accordance with

approved procedures, Technical Specifications and appropriate codes and

standards.

!

i

,

l

l

\\

'

(f

l

. . . -

.

. . . . . . _ . ~ _ . _ _

. , , . . , . , _

. _ . _ _ . _ _ _

.- 1

-

.c

.

5

1The following. maintenance-activities were reviewed:

PTR 10-339 Repair steam valve packing on V-75640

.PTR 3-463 . Troubleshoot and repair 'B' Instrument Air Compressor

PMR-1-M

Buffer - Mid Buffer Operability Check

'During observation of PMR-1-M, Buffer - Mid Buffer Operability Check, the

inspector noted that the radios in use between the control room and

reactor building caused an upset in the buffer helium supply to Helium

Circulator 1A.-

The upset occurred only when the radio transmitter in the

' reactor building was keyed.

It could not be determined at the time

whether indication or actual valve movement was affected. The licensee

indicated that this matter will be investigated.

This will remain as

an unresolved item '(80-08/1).

Following IE inspection report No. 50-267/80-06, there were three mainte-

nance activities that were not completed at that time. The following

activities.were completed and closed out:

,

PTR3-76 Repair Expansion Joint on Pump P-4101 (Circulating Water

Tower Pump)

PTR3-377 Emergency Water Booster Pump Mechanical Seal Repair

Auxiliary Boiler Tub Replacement, PTR3-261, is still in progress.

f

No items of noncompliance or deviations were identified.

i

5 '.

Surveillance

,-

l

The inspector reviewed all' aspects of surveillance testing involving

safety-related systems.

The review included observation and review

,

_ relative to Technical Specification requirements.

The surveillance tests

-

reviewed and observed were:

SR 5.4.1.3.5.b-M Circulator Drain Pressure Test

SR 5.4.1.2.6.b-H Reheat Header Activity Test

SR 5.4.1.1.6.c-R Primary Coolant Moisture Scrim Calibration

No items of noncompliance or deviations were identified.

.

%

t

(:

.

_

..

. _ . _

.

_

. .

. . . . -

.

- .

. - .

.

_

--

-

- -- -

-. . - - - - - _ - - - - - - _ _ - _ _

-

. .

6

l

l

6.

IE Bulletins / Circulars

i

The inspector verified by record review, observation and discussion with

representatives of the. licensee, the action taken in response to IE

Bulletins / Circulars.

The following Circulars were reviewed:

80-07

Problems with HPCI Turbine Oil System.

Not applicable to

Fort Saint Vrain.

l

1

The following Bulletins were reviewed-

79-03A-

Longitudinal Weld Defects in ASMI SA-312, Type 304 Stain-

f

less Steel Pipe. None in use at Fort Saint Vrain.

80-03

Loss of Charcoal from Standard Type II, 2 inch, Tray

Adsorber Cells.

Inspection found no degradation or

bypassing nor loss of charcoal.

80-06

Engineered Feature (ESF) Reset Controls. Not applicable

to Fort Saint Vrain.

"

7.

- Category A" Lessons Learned Implementation

-.

Two items, 2.1.8.c Improved Iodine Instrumentation and 2.2.1.c Shift and

Relief Turnover procedures were to be verified as required by the enclo-

sure (dated March 20, 1980) to the letter from T. P. Spies (NRR) to

J. K. Fuller (PSC).

The enclosure required that procedures required by

2.1.8.c be in place prior to the resumption of power and that for 2.2.1.c

the adequacy of checklists and logs be determined. Each of these items

were verified prior to the. resumption of power following the staff's

visit to the site on January 18-19, 1980.

8.

Unresolved Items

Unresolved items are matters about which more information is required

in order to ascertain whether they are acceptable items, items of non-

compliance, or-' deviations.

One unresolved item disclosed during the

inspection is discussed in paragraph 4.

4

9.

Exit Interviews

Exit-interviews were conducted at the end of various segnents of this

inspection with Mr. D. Warembourg (Manager, Nuclear Production) and/or

other members of the-Public Service Company staff.

At the interviews,

the inspector discussed the findings indicated in the previous paragraphs.

The licensee acknowledged these findings.

~