ML19318A530

From kanterella
Jump to navigation Jump to search
Summary of IE 790503 Interview 112 of G Rider
ML19318A530
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/03/1979
From: Rider G
METROPOLITAN EDISON CO.
To:
References
TASK-TF, TASK-TMR NUDOCS 8006230286
Download: ML19318A530 (1)


Text

-

Summary of I&E Interview 112 Interview of May 3,1979. of E. Gordon Rider, Junior Radiation Chemistry Technician.

Mr. Rider is hi '

aduate and is assigned to present position approximately two years ago.

Received 6-8 weeks of training from Rad Services and 2 weeks of chemistry training. Rest of training was on-the-job.

Reported to work 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> on 28 March was assigned to Team Bravo for off-site monitoring.

Took three air samples and many dose rate readings.

Reported 20 mr/hr at meat packing plant. Soil samples counted on a Sam-II.

Called back to plant.

Entry to plant via north gate sent to observation center.

No pocket dosimeters or TLDs.

Issued a temporary TLD.

Upon entry to process center no detectors were in operation, nor was guard on station.

Proceeded to ECS and assisted Mr. Evans in obtaining water sample from Aux Bldg.

Had difficulty in locating gear for entry.

Had TLD and two dosimeters.

Entered bldg with a Mr. Evans. Rider had E520 survey meter, Evans a telector. Approximate time of entry 0000 hrs, 29 March.

Rad level at control point 2r/hr, no access control. Evans and Rider split up after entry. Rider going downstairs (281 elevation) to collect water sample. Survey meter (E520 pegged).

One-hundred milliliter sample in a 1 1. poly bottle read approx 40 mr/hr.

No extremity monitors were wore. Contaminated hair, showered. Approximate exposure 700 mr.

On March 30, 1979, assigned to monitor perimeter.

Expected release occured at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> on 31 March.

Highest perimeter level 40 mr/hr.

8006230 M

.