Responds to 800602 Memo by Submitting List of Documentation & Applicable Comments on Facilities Purge & Vent Valves long-term Mechanical Operability.Facilities Meet Interim Position
ML19318A444
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/10/1980
From: Martin R
Office of Nuclear Reactor Regulation
To: Zudans J
Office of Nuclear Reactor Regulation
References
NUDOCS 8006230142
Download: ML19318A444 (2)


Text

BEGUuT0llY D02ET Hl.E CO

,[g3:.3 r;tcy o,,

UNITED STATES

(_

p, NUCLEAR REGULATORY COMMISSION 5

e f WASHINGTO N, D. C. 20555 o.,,,,+

June 10,1980 Docket No. 50-282 306 MEliORANDUli FOR:

J. Zudans Equipment Qualification Branch, DE FROM:

R. Martin Operating Reactors Brar.ch #3, DL

SUBJECT:

PRAIRIE ISLAl D PURGE & VENT VALVES - LONG TER1 MECHANICAL OPERABILITY I am responding to E. Reeves' memo of 6/2/80 to all PM's.

The following is a list of the documentation and applicable comments on this subject to date.

.9/27/79 Subject letter sent to fiorthern States Power (NSP).

10/1/79 Request for Additional Information (RAI) from G. Lairias, PSB, DOR.

10/29/79 Letter sent to USP trasmitting interim position for valve operation pending resolution of operability issue.

11/14/79 NSP response to NRC letter of 9/27/79.

Says valves will be closed when above cold shutdown.

Also says valve vendor is being requested to develop information to show valves will close in event of LOCA.

As of 6/5/80, NSP says this work is ongoing.

NSP did not identify a completion date for it.

They rely on keeping the valves closed when above cold shutdown having operated in this manner for about one year.

12/17/79 RAI memo from PSB on electrical aspects.

12/27/79 Memo from E. Reeves to all FM's requesting Pli evaluation relative to the Interim Position of 10/29/79.

1/9/80 NRC letter to HSP on electrical aspects.

1/25/80 Clarification notes on the 9/27/80 letter.

s ooesaol41 P

. 3/6/80 Telecopy from NRC to NSP requesting evaluation relative to BTP CSB 6-4, Rev. 1.

3/12/80 Memo from ORB #1 on status of conformance of Prairie Island to Interim Position.

3/17/80 USP letter to NRC responding to staff's 1/9/80 letter and to the 3/6/80 telecopy on BTP 6-4.

4/12/80 NSP letter to NRC on radiological consequences of LOCA with the valves open at the beginning but closing on demand.

4/' 0/80 PM's evaluation of NSP's 11/14/79 lette*

3 Conclusion Prairie Island meets the interim position. Work to qualify the valves was authorized in March, 1980.

An estimate of three months was provided to complete that work.

The Henry-Pratt valves, the Prairie Island type, are being qualified in a group effort to include the plants using this valve type. NSP will provide a more precise estimate of a submittal date at a later time.

I will then inform you of that date.

5 at>bs.

/ Robert-. Martin Operating Reactors Branch #3 Division of Licensing l