s GPU Service Corporation pus J
Nme 100Interp ce Parkway Parsippany, New Jersey 07054 201 263-6500 TELEX 136-482 wnter's Direct Dial Number 6 257 June 11, 1980 C-1836 Mr. Sidney Feld U.S. NRC Mail Stop P305 Washington, D.C.
20555
Dear Mr. Feld:
Bud Cherry had asked me to forward data regarding the GPU System capabilities, peak load, reserve margins, net system requirements, and interchange.
Attached are two tables that were used in a data request during the recent GAO investigation.
Table 1 reflects actual system data for 1978 and 1979.
Table 2 presents a projection of these data from 1980 through 1985.
Please note that the projected data assumes a return to service da ta for TMI, Unit 1 of January 1,1982 and for TMI, Unit 2 of January 1, 1985.
These dates were selected by the G?.C for a specific scenario.
Our current planning returns TMI-l to service mid-year, 1981; and returns Unit 2 to service in early 1985.
If you have any questions or problems, please feel free to contact me.
Very truly yours
<7 h n
/
y W.
G. Runte Nuclear Fuel Resources Manager WGR:pkd Enclosures
\\
cc:
B.
H.
Cherry S00617o415 Gou Service Corporat;on s a subs:d:ary of General Pubhc Uttt:es Corporation
TABLE 1 1978 1979 System Capability (MW) 6,872 7,725 Scheduled Maintenance (MW) 806 534 Unavailable TMI Capability (MW) 0 1,656 Net of TMI' Scheduled Capability (MW) 6,066 5,535 Peak Load (MW) 6,042 6,267 Net of TMI Reserve - (MW) 24 (732)
Net of TMI Reserve - %
.4 (11.7)
Net System Requirements (GWh) 34,022 34,873 Generation (GWh) 29,745 26,891 Outside Purchases (GWh) 23 4,278 Net Interchange (GWh) 4,254 3,704
L' TABLE 2 GPUSC Scenario 1:
TMI-1 1/1/82 TMI-2 1/1/P5 1980 1981 1982 1983 1984 1985
{
System Capability (Includes TMI) (MW) 7,715 7,875 8,129 7,979 7,895 7,915 Scheduled Maintenance (MW) 147 244 40 136 Unavailable TMI Capability (MW) 1,656 1,656 880 880 880 Net of TMI Scheduled Capability (MW) 5,912 5,975 7,209 6,963 Peak Load (;MW) 6,640 6,850 7,190 7,288 7,610 7,810 Net of TMI Reserve (.MW)
(728)
(875) 19 (447)
Net of TMI Reserve (%)
(11.0)
(12.8)
.3 (6.1)
Net System Requirements (GWII) 36,179 37,600 39,510 40,850 42,140 43,420 Generation (GWil) 24,371 25,021 29,532 30,696 30,112 34,274 Outside Purchases (GWII) 4,282 10,401 10,726 7,982 7,996 25 Net Interchange (GWil) 7,526 2,178 (748) 2,172 4,032 9,121
-