i
-o s
e
('h i
'il H ELPIN G BUILO J R KA N S A S
)
v' ARK ANS AS POWE A & LIGHT COMPANY STM & LOUISIANA STREETS UTTLE ROCK. AAKANSA3 72203 (5011372-4311 August-1hr 1972 s
Mr. John G. Davis, Director Rector. II Directorate of Regulatory Operations United States Atomic Energy Commission 230 Peachtree Street N.W. Suite 818 Atlanta, Georgia 30303
SUBJECT:
ARKANSAS NUCLEAR ONE-UNITS 1 & 2 IN REPLY TO: RO:II:VLB 1-313/72-4 50-368/72-3
Dear Mr. Davis:
[3 We have reviewed your letter dated July 27, 1972 concerning construction deficiencies at Arkansas Nuclear One. We submit the following information in answer to the questions raised concerning AP&L's quality surveillance program:
1.
Subsequent to the AEC inspection of June 6-9, 1972, an engineer-ing end design quality assurance audit was conducted at Com-bu' rion Engineering, Inc. in Windsor, Connecticut on June 26-28, 1972. Your inspector, Mr. Brownlee, observed AP&L during this audit. The audit covered organization, function responsibilities, and interfaces of project management, engineering and procurement; design control; dradng control; procurement document control; internal audits; identification of systems, structures, and com-ponents; handling of changes to codes, standards and regulations ;
and review of vendor QA programs. The report of this audit and documents initiating corrective action are available at the con-struction site. We have received a satisfactory response from CE dated August 4, 1972 indicating that corrective action has been taken.
2.
As a result of the subject AEC inspection, the AP&L site quality ersurance surveillance program was reviewed in detail with regard to frequency of audits, coverage of construction activities and the method of application. This revi.ev resulted. in the formulation n
}h Y
s' 9
9e e
s
,e
- n.
2-August 14, 1972 Mr. John G. Davis of an audit schedule to establish minimum application of the.
AP&L audit procedures and checklists. This plan has been submitted to and approved by the AP&L Quality Assurance Committee for the remainder of Calendar Year 1972 and all of Calendar Year 1973.
Very truly yours,
's ARKANSAS POWER & LIGHT COMPANY N
J d.D.Phillips
~
Vice Presicfent