ML19317H097

From kanterella
Jump to navigation Jump to search
Forwards Fuel Assembly Damage Evaluation & Repair Rept
ML19317H097
Person / Time
Site: Arkansas Nuclear, Crane  Constellation icon.png
Issue date: 07/14/1976
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: Howard E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19317H098 List:
References
NUDOCS 8004140579
Download: ML19317H097 (1)


Text

.

g e

,r x l

~

IE.FIIE COPY

<.]

i,

,3 ch:k

i. ?

H E LPIN G B L/ l L O ARKANSAS U*

.2 ARK ANS AS POWER & LIGHT COMPANY STH C LOUISIANA STREETS. LITTLE ACCK. ARK ANSAS 72203.(501) 371-4000 July 14,1976 4

Mr. E. Morris Howard, Director

~

U. S. Nuclear Regulatory Com:aission Region IV, Suite 1000 611 Ryan Plaza Drive Arlington, Texas 76012 Subj ect: Arkansas Power 4 Light Company Arkansas Nuclear One-Unit 1 Docket No. 50-313 Fuel Assembly Damage Evaluation s.,

And Repair Report

)

(File: M-1) lie are submitting to you the attached discussion regarding fuel assembly spacer grid damage and repair performed at Arkansas Nuclear One-Unit i during the recent shutdown to resolve the Surveillanco Specimen Holder Tube problem.

A more detailed report will be available on site in the near future for your inspection.

1 Very truly yours, 4

2.c.

/d @ lliam Cavanaugh III v

Assistant Director Power Production 11C:tw l

cc:

Mr. J. D. Phillips Mr. J. H. Ifoodward Mr. J.11. Anderson Mr. M. L. Pendergrass Mr. D. A. Rueter Mr. T. H. Cogburn l' m',

itr. D. II. Cypret i

q,/

8 0 0 414 0.f71.8 tw