Text
\\
O O
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) fo~$l%
REC: GOLLER K R ORG: MATTIMOE J J DOCDATE: 01/10/78 NRC SACRAMENTO MUN UTILITY DISTRIC DATE RCVD: 01/18/78 MOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 0
>URNISHING INFORMATION REGARDING RANCHO SECO *3 NeW Cc 5e 9 : 1L e t#0 n w &
S t r u c t w e t, e P L A N~l NAME: RANCHO SECO (SMUD)
REVIEWE TI AL:
XJM DISTRIBUTOR INITIAL:
oo*************** DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************
GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
(DISTRIBUTION CODE AOO1)
FOR ACTION:
BRANCH CHIEF REID**LTR ONLY(7)
INTERNAL:
[PCG CTtC++fTR ONLY D )
NRC PDR**LTR ONLY(1)
I & E**LTR ONi.rtti OELD**LTR ONLY(1)
HANAUER**LTR ONLY(1)
CHECK **LTR ONLY(1)
EISENHUT**LTR ONLY(1)
SHAO**LTR ONLY(1)
BAER**LTR ONLY(1)
BUTLER **LTR ONLY(1)
GRIMES **LTR ONLY(1)
J.
COLLINS **LTR ONLY(1)
J.
MCGOUGH**LTR ONLY(1)
EXTERNAL:
LPDR'S SACRAMENTO, CA -- REGION V**LTR ONLY(1)
NSIC**LTR ONLY(1)
ACRS CAT B**LTR ONLY(16) l l
i IISTRIBU110N:
LTR 40 ENCL 0 CONTROL NBR:
780190008 IZE: 2P
%*****o****************************
THE END soo4oso 6 M
l SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O E201 S Street, Box 15830 Sacramento, California 95813; (916) 452-3211
'.?.I f/,'.*\\
k f, January 10, 1978
% %",%)%. 8,,
s Director of Nuclear Reactor Regulation
/
ATTN:
Karl R. Goller
/7 # ' i;,
O. -
Assistant Director for Operating Reactors Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Re:
Docket No. 50-312 Rancho Seco Nuclear Generating Station, Unit No. 1 Gentlemen:
Rancho Seco Unit 1 has completed all construction activities and has been operating at full power since March, 1976.
The personnel organization was con-ceived during the initial hiring phase in 1968 and has continued as described in the Final Safety Analysis Report Figure 12.2.3 and the Technical Specifications Figure 6.2-2.
Since Rancho Seco became commercial in March,1975, several unplanned personnel additions were necessitated.
The requirements became more operations oriented and obvious organizational changes had to be considered to optimize the internal personnel structure. Nuclear Utility Services Corporation was contracted to review the personnel organization and determine how changes could be made in a most efficient and safe manner.
NUS completed the work and submitted the conclu-sions to the District in August, 1977.
The reorganization was not started until af ter the September-November 1977 refueling.
It is the intent during 1978 for the Nuclear Operations Department at Rancho Seco to phase into a new organizational structure. Major changes in this structure include putting electrical, mechanical and instrument & control maintenance under one maintenance supervisor, putting some engineering support directly into that division, and putting the maintenance, operations and health physics sections under one individual, who will be called the Plant Superintendent.
The Plant Super-intendent will report directly to the Manager of Nuclear Operations.
72pf29eet i
,//f 3
Ji M
% M.. Qt
? jn ry e A
m o
A e
o a
,.n
.)
. sg Karl R. Go11er January 10, 1978 A quality control organization will also be identified and placed inuthe technical support area. Other minor modifications to the organizational structure will be made to account for human resources and some expanded areas of responsibility.
When these organizational changes are completed, the District will review then within the requirements of 10 CFR 50.59(b) and submit to the Commission the l
necessary documentation to update the Technical Specifications to reflect the final organization structure and division of responsibilities.
Respectfully submitted.
i
^
Lith l
' J.' J. Mattimoe Assistant General Manager and Chief Engineer i
JJM:RJR:RWC: sal c: