Text
~
g_
~ NRC KnM 195
)
U.S. NUCLE AR HEGULATORY AMISSION DOCKET NUM BE R 12 76) 30 3)1 Nfic D'ISTRibuTION FOn PART 50 DOCKET MATERIAL
[To:
Mr Reid FROM:
Sacramento Municipal Util.
"N1-76 i
Sacramento, Calif l
J J Mattimoe DATE RECEIVED 6-25-76 i
fijLETTER O NOTORIZ E D PROP INPUT FORM NUMBER OF COPIES RECEIVED ORIGINAL Q(U NC k.ASSlFIE D one sQMd DESCRIPTION E NCLOSU R E Ler re their 4-8-76 & 4-28-76 1trs.........
furcishing addl info with regard to Appendix H requirements.......
l k.
PLANT NAME: Rancho Seco I
SAFETY FOR ACTION /INFORMATION ENUTRO g_90_79
- s.,
i ASSIGNED AD:
ASSIGNED AD!
'/ BRANCil CPIEF:
fdgd (S)
BRANCH cHTEF*
!/ PROJECT '\\NAGEd:
K o o n e. H PROJECT PANAGER!
I/ LIC. ASST.:
T we r ievs LIC. ASST.!
i INTERNAL OlSTRIBUTION i[ PEG FILO SYSTEMS SAFETY ptANT sysTEMg SITE SAFETY &
jf[_I & E (2 )
SC1'RGEDER
- DEPAROYA DENTON & FULLER NRC 1Dn _
ININE:1AN TEnEsen ENVIRO ANMYSIS
(
OELD LAINAS COSSICK & STAFv ENGINEERING IPPCLITO ENVIRO TECH.
_. I
_JtIPJ MACCARRY KIRIGIOOD ERNST CASE KNIGllT BALLARD HANAULR SIliUE L OPERSTING REACTORS SPANcLER
_ EARI.KES PAULICKI STELLO RTTE TFrH PROJECT MANAGE!IT.NT REACTOR SAFETY OPERATING TECH.
CAMMTIL BOY.D ROSS
/
EISENJ1 UT STEPP P
C0_L, LINS NOVAK
/
SUAO HULMAN HOUSTON ROSZTOCZY
/
BAER PETERSON CliECK
/
BUTLER SITE AN\\ LYSIS t
MELTZ
/
GRIMES VOLLMER llELTdt!ES AT & I EUECH SKOVIIOLT SALT 7J1AN
/
J mCOLLTUS RUTBERG MEECER EXTERNAL DISTRIBUTION CONTROL NUMBER
/
LPDR: So e r, m A C,.
NAT I.\\B:
BROOlGIAVEN.NAT LAB l/ TIC:
)
REG. VIE ULRIKSON(ORNL) yfisic.
e LA PDR 4
ASLB;.
CONSULTANTS g
it ACRS IkcyS = ^.mu l senn o t n J.r3 ram s nnanonf/M p
p
}
gIBMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830, Sacramento, California 95813; (916) 452-3211 June 21,1976 Director of Nuclear Reactor Regulation
/
Attention:
Mr. Robert W. Reid, Chief C3 Operating Reactors, Branch 4
)
'C U. S. Nuclear Regulatory Commission
-q Washington, D. C.
20555 y.;-
C
.a C Docket No. 50-312 Rancho Seco Nuclear Generating.
J Station, Unit No.1
' (;,
x
Dear Mr. Reid:
On April 8,1976 the Sacramento Municipal Utility District requested an exemption from the requirements of 10 CFR 50, Appendix H, and requested changes to the Technical Specifications relative to operation of Rancho Seco Unit No.1 with reactor vessel surveillance specimens removed for the remainder of the first fuel cycle.
On April 28, 1976 the District submitted a report describing the results of an inspection which had been completed and provided a proposed corrective action for the remainder of fuel cycle 1.
This corrective action involved cutting all three surveillance specimen holder tubes (SSHT's) 100 inches below the top of the core support flange, removing the upper portion, and securing the lower portion from motion by a spring-loaded retaining device loaded into the upper end of each holder tube.
Since this time, generator repairs at Rancho Seco Unit No.1 make it necessary that the unit remain shut down until September 1976.
Since it would be necessary to remove the SSHT's at the end of the first cycle, the District now finds it prudent to take advantage of the extended shutdown to remove the SSHT's at this time. Therefore, the surveillance specimen capsules, the holder train, the SSHT's, and the journal bearings will be removed at this time. The portions of the SSHT's to remain in the reactor vessel are the upper and lower pintals which are attached to the thermal shield and the shroud tubes which are welded to the core support assembly.
Removal of the SSHT's precludes the possibility of wear causing the generation of loose parts.
During the present outage, the shroud tubes and pintals will be inspected to assure they remain in serviceable condition.
It is concluded that operation of Rancho Seco with the surveillance specimen capsules and SSHT's removed is acceptable during the balance of cycle 1.
This change will not be inimical to the health and safety of the public.
hhb.
AN ELECTRIC SYSTEY SERVING
?.10 P E THAN 600.000
'N THE MFART GF : Alif00%t
^r m,
f-Mr. R. W. Reid June 21,1976 The Babcock & Wilcox Company is currently designing a replacement surveillance specimen holder tube assembly and intends to qualify its use during hot functional testing at the Toledo Edison's Davis Besse plant.
This qualification testing will not be completed in time for the revised replacement tubes to be installed at Rancho Seco Unit No.1 prior to our anticipated start-up in September 1976.
If we can provide any additional infonnation, please feel free to Sincerely yours, v. ". &Y
. J. Mattimoe Assistant General Manager and Chief Engineer f