Text
_ - _
r)
NRC DIS's..lBUTION FOR PART 50 DOCKET M LERIAL (TEMPORARY FORM)
FILE.
FROM:
Sacramento Municipal Ut L1QATE OF DOC DATE REC'D LTR TWX RPT OTHER 7-28-75 8-4-75 XX Sacja g g alif ORIG CC OTHER SENT NRC PDR rr TO:
XX Mr Collet one signed SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
1 50-312 ENCLOSURES:
DESCRIPTION:
Info concerning refueling in response to Ltr trans the following:
ou-7-1-75 ler.......
PLANT NAME:
Rancho Seco FOR ACTION /INFORMATION 8-11-75 ehf
.I BUTLER (L)
SCHWENCER (L) ZIEMANN (L)
REG AN (E) d W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L)
STOLZ (L)
DICKER (E)
LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies PAR R (L)
VASSALLO (L)
KNIGHTON (E)
SPIES W/ Copies W/ Copies W/ Copies W/ Copies KNI AL (L)
JURPLF (L)
YOUNGBLOOD (E)
Lyn W/ Copies W//Cupies W/ Copies W/ Gopies g
INTERNAL DISTRIBUTION 9CA C" c3 TECH REVIEW _
DENTON LIC ASST A/T IND _.
ARC PDR SCHROEDER GRIMES R. DIGGS~(L)
BRAITMAN AGC, ROOM P-506A MACCARY GAMMILL H. GEARIN (L)
SALTZMAN GOSSICK/ STAFF KNIGHT KASTNER E. GOU LBOURNE (L)
MELTZ f
PAWLICKI BALLARD P. KREUTZER (E)
CASE
_ PLANS GIAMBUSSO SHAO SPANGLER J. LEE (L)
BOYD STELLO M.RUJHBROOK(L)
MCDONALD MOORE (L)
HOUSTON
_ ENVIRO S. REED (E)
CH APMAN,
DEYOUNG (L)
NOVAK MULLER M. SERVICE (L)
DUBE (Ltr)
E. COUPE SKOVHOLT (L)
ROSS DICKER
- f. SHEPPARD (L)
PETERSON l
GOLLER (L) (Ltr)
IPPOLITO KNIGHTON M. SLATER (E)
P. CU LLINS TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
DENISE J. COLLINS REGAN S. TEETS (L)
KLECKER BEG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)
EISENHUT
/ FILE & REGION (2)
BENAROYA V. WILSON (L)
WIGGINTON
/
HIPC VOLLMER HAR LESS R. INGRAM (L)
M. DUNCAN (E) 47 DMO
/
EXTERN AL DISTRIBUTION Y*'
O[
LOCAL PDR _64 c. ** *
- d' i k
/
1 - PDR SAN /LA/NY 1
/
TIC (ABERNATHY) (1)(2)(10) - N ATION AL LABS 1 - BROOKHAVEN NAT LAB 1-l - NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E.201 GT f
1 - G. ULRIKSON ORNL f 1-ASLB 1 - CONSULTANTS 1 - Newton Anderson NEWMARK/BLUME/AGBASIAN g
/s/- ACRS HOLDING /SENT g
cAK i
t, f ~;
o-
$SMUD SACRAMENTO MijNICIPAL UTluTY DISTRICT O 6201 S Street. Box 15830 Sacramento, California 95813; (916) 452-3211
-~-
y
~
July 28, 1975 s[..
\\
y c... _. y Mr. Karl R. Goller Assistant Director of Operating Reactors Division of Reactor Licensing Nuclear Regulatory Comission Washington, D. C.
20555 1
Dear Mr. Goller:
Rancho Seco Nuclear Generating Station Unit 1 Docket No. 50-312 Enclosed is the information you requested in your letter of July 1,1975, relative to licensing activities required for opera-tion beyond the first refueling, We cre planning for refueling to occur in October 1976, and expect to have Rancho Seco Unit 1 back on line before January 1,1977.
Sincerely yours, G.b h&&
J. J. Mattimoe Assistant General Manager and Chief Engineer Encl.
~
/r
/
N,*,,9
,,.l
,?
\\'}.
, {7'
[
u'
.. ~ *.)
3' b
y.,:: i
'G ;
\\.
s T,:
/C o.5'@h.4g 1
/
3 8238 AN ELECTRIC SYSTEM S E RVIN G MORE THAN 600,000 IN THE HEART OF C All F O R N I A
,3
~
n
.~..
NRC Refueling Information Request 1.
Name of Facility:
Rancho Seco Unit 1, Docket No. 50-312 2.
Scheduled date for next refueling shutdown:
October 15, 1976 3.
Scheduled date for restart following refueling:
December 15, 1976 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes 2
In general, the replacement fuel is identical with the original; likewise, we expect the safety analysis to apply to the reload.
There m ay be some changes necessary to specific operating limit curves which are based on each cycle control rod worths and the like.
5.
Scheduled date for submitting proposed licensing action and support-ing information:
We expect to submit all required changes and supporting in-formation 90 days prior to refueling.
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
Reload fuel is fabricated by same supplier-and analyzed to same criteria as original.
There are no new operating procedures expected which would affect the safety or operation of the core.
.