ML19317G827

From kanterella
Jump to navigation Jump to search
Revises Schedule for post-LOCA Boron Concentration & ECCS Reviews to Show 751015 as Major Licensing Action Date
ML19317G827
Person / Time
Site: Rancho Seco
Issue date: 09/19/1975
From: Reid R
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8004010655
Download: ML19317G827 (1)


Text

-

9 ' 3 (m-SE? I ; 1175

""?.E N

S. Varga, Technical Assistant, Division of Reactor Licensing

=f THRU:

K. R. Goller, Assistant Director for Operating Reactors

..J

=H.

POST-LOCA BORON CONCENTRATION AND ECCS REVIEWS

REFERENCE:

K. R. Goller letter to R. E. Heineman, " Post-LOCA Baron Concentration and ECCS Reviews", dated August 20, 1975 As footnoted in the enclosure to the reference letter, the schedule for the review of the Appendix K analysis for Rancho Seco was listed on the assumption that the Appendix K analysis need not be approved prior to or in conjunction with authorizing the currently pending increase in power level to full power. We have concluded that the Appendix X analysis should be approved prior to the power level increase. Therefore, the reference letter should be corrected to show a major licensing action date of October 15, 1975 for Rancho Seco.

Robert W. Reid, Chief Operating Reactors Branch f4 Division of Reactor Licensing cc:

J. Panzarella Distribution:

Docket NRC PDR ORB #4 rdg RWReid VRooney RIngram TJCarter KRGoller 6

3 W v () (e l')

(&A ORB #4_ [

ORdd4 RL:AD/0R' on.=w VRooney RUReid KRGoller..

9L

1 /75 9L '.r.. /75.. r L.17.... D 5 9

om

  • N* w. s. s oV E R W ENT PRIN'71NG OM IC EE R $ Ne l&& S te

.!0-)18 (T.er. 0-53) AECJ C2O

=8~0040101fN 6 g

-