ML19317G823
| ML19317G823 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 01/05/1977 |
| From: | Reinaldo Rodriguez SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| To: | George Mcdonald US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8004010651 | |
| Download: ML19317G823 (3) | |
Text
.
NRC Fcrx 195 O
u.s. NUCLEAD GERULATCGY AMISSioN f DOCKET NUMBEQ ins >
.60 3 l 2.
NRO DISTRIBUTION FoR PART 50 DOCKET MATERIAL TO: Mr Mcdonald FROM:
DATE oF DoCUM N, gg Sacramento, Calif OATE RECElVED R J Rodriguez y,
MLETTER ONoToRIZED PROP INPUT FORM NUMBER oF COPIES RECEIVED DoRIGINAL U NC L ASSIFIE D OcoPY one Signed DESCRIPT8oN ENCLoSU RE Ltr trans the following Information concerning Electrical Capacity...
.......(1 cy enc 1 rec'd)
/I" y
' TAC 1GOWLEDGED PLANT NAME:
Rancho Seco h.
SAFETY FOR ACTION /INFORMATIOff ~ emtTun 1-13-77 ehf ASSIGNED AD:
AsnTcnPn An.
d3 RANCH CHTEF!
88 L6 ( /2 unANIM PMTPP.
/ PROJECT _BANAGER f**e4")
PROJECT MANAGER:
/ LIC, ASST...:
~Z~ a t e 4 - 3 LIC. ASST.
/
/M' dona / d. (3)
INTERNAL DISTRIBUTION ure crt v 7 SYSTEMS SAFETY PLANT SYSTEMS SITE SAFETY &
A
/ NRC PDR HEINEMAN TEDESCO ENVIRO ANATNSTS
/ I 6 E (t)
SCHROEDER BENAROYA DENTON & MUT.T FR (OELD T.A TNA R
/ GOSSICK & STAFF ENGINEERING IPPOLITO ENVIRO TECH.
MIPC MACARRY KIRKWOOD ERNST CASE KNIGHT BALLARD HANAUER SIHWEIL OPERATING REACTORS SPANGLER HARLESS PAWLICKI STELLO SITE TECH.
PROJECT MANACEMENT REACTOR SAFETY OPERATING TECH.
CAMMILL BOYD ROSS
/
EISENHUT STEPP P., COLLINS NOVAK
/
SHAO HULMAN HOUSTON ROSZTOCZY
/
BAER PETERSON CHECK
/
BURLER SITE ANALYSIS MELTZ
/
CRIMES VOLLMER HELTEMES AT & I BUNCH SKOVHOLT SALTZMAN
/
J. COLLINS RUTBERG KRFCER EXTERNAL DISTRIBUTION CONTROL NUMBER
/ LPDR Satu m d e. /-
NAT. LAB BROOKHAVEN MAT. T AR.
/TICt REG V.IE ULRIKSON (ORNL)
[ NSIC:
TA PDR ELB:
CONSULTAlfrS:
[ 7--/
31b b
,_m
/ACRS /(. CYS HGbDDie/ 5EbT A _s C s9-T 8 <- 7.thU U 9 U AW b 7 I g
(
h
r*
n e
SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT C 1708 59th Street, Box 15830, Sacramento, California 95813:(916) 452 3211 RJR 77-9
.s j
Oh
, n.
A r; O
0 January 5, 1977 j
(k, L /
JMlU Yw.dT
~
YguhbiY N c)
Mr. W. G. Mcdonald, Director i.r Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 So-sist
Dear Mr. Mcdonald:
Please find enclosed the completed form on Rancho Seco capacities that you requested.
Mr. Humphreys was contacted by telephone on January 4 and the information contained on the form was transmitted to him.
Respegg fu submitted,
\\
s }b
\\
R. J. Rodriguez g
Managar, Nuclear Opg ations l
l N
/
d 6gy[$
5 lh
$% U, g '
3 RJR:FTE: sal eS#
y c
Encl.
a 3%
AN ELECTRIC SYSTEM SERVfNG MORE THAN 600.000 IN THE HEART OF CAllF0RNiA
O r
e
~
a Unit Name:
RANCHO SECO UNIT I Please provide the following information or verify the information provided:
1.
Nameplate Rating (Gross MWe) 963 The nameplate rating is the megavolt amperage (HNA) times the nameplate power factor of the turbine-generator.
2.
Maximum Dependable Capacity (Gross NWe) 918 The gross maximum dependable capacity is the gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions.
3.
Design Electrical Rating (Net MWe) 913 The net design electrical rating is that nominal output of the unit specified by the utility and used for the purpose of plant design.
4.
Maximum Dependable Capacity (Net MWe) 868 The net maximum dependable capacity is the gross electrical output as measured at the output terminals of the turbine-generator during the most restrictive seasonal conditions less the normal station service loads.
The above referenced information has been reviewed and corrected or verified.
Name:
~.
R. W. Colombo
Title:
Technical Assistant Phone Number:
(916) 452-3211 4
4
,, =