ML19317G811

From kanterella
Jump to navigation Jump to search
Advises That Response to NRC 761210 Request for Addl Info Re Reactor Vessel Overpressurization Will Be Submitted by 770317
ML19317G811
Person / Time
Site: Rancho Seco
Issue date: 01/07/1977
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 8004010639
Download: ML19317G811 (2)


Text

-

u.s. NUCLEA8il RErULATERY COMMISSION DOCKET NUM BE R NRC F@M 196 p.-

50-312 n.m

^

fdRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL FROM:

Sacramento Municipal Util.

DATE OF DOCUMENT TO:

Mr Reid I-7-77 Sacramento, Calif J J Mattimoe DATE RECEIVED

~

~

1-11-77 E ETTER ONOTORIZE D PROP INPUT FORM NUMBER OF COPIES RECEIVED HORIGINAL

' MUNC LASSIFIE D D

One signed OCorY DESCRIPTION ENCLOSURE Ltr re our 12-10-76 ltr.... advising that info Concerning reactor vessel overpressur n-ization, will be submitted by 3-17-77.....

ACKNOWLEDGED ~-

REACTOR VESSEL OVERPRESSURIZATION

.D0 NOT REMOVE DISTRIBUTION PER G. EECH 10-21-76 PLANT NAME:

Rancho SeCo II

  • A' SAFETY FOR ACTION /INFORMATION BRANCH CHIEF:

(5)

Ret /

LIC, ASST:

Loks 9 PROJECT MANACER:

7,vi e4 e INTERNAL DISTRIBUTION

' [ REC FILt.)

NRG rug I & E (2)

Onn GOSSICK & STAFF KNICHT PAWLICKI NOVAK EISEN1mT SHAO BAER BUTLER ZECH cETERNAL DISTRIBUTION CONTROL NUMBER LPDR: M c e afe,C /

fa, V l

TIC

/

L.fr- # d At'

< 0 04 010$3 o

NSICr s

ACRS /6 CYs ::r

_!qpWP N M5 0

  1. F
  1. ~

E#'U j

o w

f

,e.

9

/,_

SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S street, Box 15830, Sacramento, California 95813; (916) 452-3211 Regulatory Docket Fde a,noery 7, ig7,7.

._...4,,

p-

%,4 %

f~

'N s

%slA D, ~. ^ I li@n-Director of Nuclear Reactor Regulation s -3 Attention: Mr. Robert W. Reid, Chief

%f

%y ;

Operating Reactors, Branch 4 Q

U. S. Nuclear Regulatory Commission r

N~

Washington, D. C.

20555 c) im, Docket No. 50-312 Rancho Seco Nuclear Generating Station, Unit No. 1

Dear Mr. Reid:

The Sacramento Municipal Utility District has received your letter of December 10, 1976 requesting additional information for your review of our proposal to prevent reactor vessel overpressurization.

The information you have requested will require additional analysis to be performed by the Babcock & Wilcox Company and we should have this information available for submittal to you by March 17, 1977.

Sincerely yours, 0LL J. J. Mattimoe Assistant General Manager and Chief Engineer

,, y%h 5

js.);7'

%e

--u' JAN 11:977

h. *, u. s.

.N;,

~

un 4.-

/

\\

(b

-4 1

l

~

344 2% ELECTRIC SYSTEY SERVING

?.' O R E T H A '8 600.0C0

.N THE HEART GF ^ t i ' F O P N i t.