| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 12/30/1976 |
| From: | Mattimoe J SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| To: | Rusche B Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8004010626 | |
| Download: ML19317G798 (2) | |
Text
_ _ _ _ _ _ - - _ - _ _
_g A
NRCpcRg1 R u.s. NUCLEAR RIGULATORY MMISSION DOCKET NUMIE R a2 Mi 50-312 NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL T2:
B.C. RUSCHE FROM: SACRAMENTO MUNICIPAL DIST.
DATE OF OOCUMENT SACRAMENTO, CALIFORNIA 12/30/76 J.J. MATTIMOE
'e
OATE RECEIVED 1/6/76 OLETTER
. O NOTO RICE D PROP traf UT FORM NUMBER OF COPIES RECEIVED EORIGINAL
' @ UNC LAS$8 FIE D
=
OCOPY 1
DEICRIPTION ENCLOSU RE LTR. RE. OUR 12/1/75 LTR...
LTR. ADVISING THAT THE 1976 MUDEL ANNUAL OPER(TING REPORT WILL BE SUB,MITTED BY MARCH 15, 1977...
T EEko
( 1 SIGNED CY. RECEIVED)
( 1 PAGE)
PLANT NAME. RANCHO SECO SAFETY FOR ACTION /INFORMATION FNtrTun SAB 1/11/77 ASSIGNED AD:
ARRTcNPD AD.
/, BRANCH CHTFFr REID (g)
RnANt'R f*RTPF.
/ _ PROJECT MANAGER:
KM MMY PROJECT MANAGER:
u
/LIC. ASST. :
.INGRAM LIC. ASST. :
~
- , /
A RLLT M INTERNAL DISTRIBUTION
/GPG FTT O SYSTEMS SAFETY PLANT SYSTEMS SITE SAFETY &
/ NRC PDR HEINEMAN TEDESCO ENVIRO ANAI.YSTS t
/ I&E (2)
SCHROEDER BENAROYA DENTON & MUT.TTR
/ OELD T.ATNAR
/.GOSSICK & STAFF ENGINEERING IPPOLITO ENVIRO TECH.-
/ MIPC (lD MACARRY ICTRKWOOD ERNST CASE KNICHT BALLARD HANAUER SIHWEIL OPERATING REACTORS SPANGLER 7
-f HARLESS PAWLICKI
/
STELLO SITE TECH.
PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH;-
GAMMILL BOYD ROSS
/
EISENHUT STEPP P. COLLINS NOVAK
/.
SHA0 HULMAN HOUSTON ROSZTOCZT
/. BAER PETERSON CHECK
/
BUTLER SITE ANALYSIS MELTZ
/
CRIMES VOLLMER HELTEMES AT & I BUNCH SKOVHOLT SALTZMAN
/
J. COLLINS RUTBERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER
/ LPDR:
SACRAMENTO. CA L.
NAT. LAB:
BROOKHAVEN MAT TAR _
/ TICR REG V.IE _ _
s Ub i EtSt 11% l C R1111" h
, / NSIC:
LA PDR L 'il
-14l1 T'I-5 JD Y ~1l 179 e
ASLB:
CONSULTAM f:' " '.I 1-a amn o n 34 010 gf
^
/ ACRS 1/.CYS BGEMMC/iEPT w
p; 3 -u m u v v L
w--
g,'
h?,.fEj e SACRAMENTO MUNICIPAL UTILITY DISTRICT O suuo 95813; (916) 452-3211 Decembe r'30~T976
._,;.5" Lif '.?.)
{
~
l_^
Q..
N Y... -
\\
/
Adv<%
y >-
n,..,
'. o t
s e er
~ ' ~
% q d j ss Mr. Ben C. Rusche, Director
%;.,,,> 2 vdi,,:,,'
y OfficeofNuclearReactorRegula]Q(6n 2 ','./ :y, h.S.ReutP:~2 RAT U
U.S. Nuclear Regulatory Commissio -] g Q*[,'
/
q Washington, D.C.
20555 i,
- s. ' '
e Tj..
w
/*T-. -
._. N I
Re: Model Annual Operating Report"
Dear Mr. Rusche:
The staff of Rancho Seco Unit I has reviewed the model Annual Operating Report that was transmitted by you to the Sacramento Municipal Utility District in a letter dated December 1, 1975 We agree that the lack of a proper model for such reports creates difficulties, both in their preparation and in the interpretation of other units' reports. The model format that has been prepared appears to fill this need well and the 1976 Annual Operating Report for Rancho Seco Unit I will follow that format.
This may take several weeks longer to prepare since the model, which is significantly different from our previous submittals, was received so late in the year.
The development of this model is appreciated and the 1976 Report will be submitted by March 15, 1977 Respectfully,
.Emb
'J. J. Mattimoe Assistant General Manager and Chief Engineer JJM:RWC: sal 179 AN ELECTRIC SYSTEM SERVING MORE THAN 6 0 0. 0 C 0