ML19317G680

From kanterella
Jump to navigation Jump to search
Responds to 730404 Request for Review of Milestones in Licensing Schedule.Submittals on Time & Schedule Determined to Be Realistic
ML19317G680
Person / Time
Site: Rancho Seco
Issue date: 04/27/1973
From: Davis E
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8003250741
Download: ML19317G680 (2)


Text

AEC DISTRIEUTION FOR PART 50 DOCIET MATERIAL (TEMPORARY 70P.'()

CoiiTROL NO: 2820 -

L j

J/ FRON*

FIT?

DATE OF DOC:

DA"?, REC'D L':R I G ;0 RP2 OT;-:EM Sacramento Municipal. Utility.DistrLet Sacramento, Calif.- 95813 E. K. Ihvis 4-27-73 4-30-73 X

TO:

ORIG CC CTDiER SEN2 AEC PD3 X

SENT LOCAL PDR X

Mr. Giambusso l' signed i

CLASS:

ydOP IliF0 I2iPUT NO CYS REC'D DOC;2T NO:

1 50-312 DESCRIPTIQ;i:

ENCLOSURES:

Ltr a our 4-4-73 ltr......furnishins schedul,

)

of submittal of info re an Interim Response on Fliel Densification.~......

0030t RGm0[d i

A0XEYAEGED PIAY2 NAMES:

Rancho Seco No. I FOR ACTIO:;/IN70axAT:0::

5-1 77 AB IVfLER(L) pd3CHWENCER(L)

ZIEMANN(L)

YCUNGELCOD(E)

W/ Copies W/ kCopies W/ Copies W/ Copies CLARK (L)

STOLZ(L)

ROUSE (FM)

REGAN(E)

U/ Copies W/ Copies W/ Copies' w/ Copies GOLLER(L)

VASSALLO(L)

DICKER (E) j U/ Copies W/ Copies W/ Copies W/ Copies

'KNIEL(L)

SCHE!'IL(L)

KNIGETC'N(E)

W/ Copies W/ Copies W/ Copies W/ Copies IrrrtunAL DISTRIBUTION (REGFILE Twa REVIEW DENTON F&M WADE E

/ Am run

  1. HENDRIE GRIMES SMILEY BROWN

-E OGC, ROOM P-506A SCHROEDER GAMMILL NUSSBAUMER G. WILLIAMS E MUNIZING/ STAFF MACCARY KASTNER SEPPARD E

CAS'E KNIGRT BALLARD LIC ASST.

/ GIAMBUSSO PAWLICKI SPANGLER SERVICE L

A/T IND BOYD SHAO WIISON L

BRAITMAN V. MOORE-L(BWR)

STELI4 ENVIRO v GOULBOURNE L SALTZMAN v DEYOUNG-L(PWR)

HOUSTON

/ MULLER SMITH L

SKOVHOLT-L NOVAK DICKER GEARIN L

PIANS P. COLLINE ROSS KNIGHTON DIGOS L

- MCDONALD

~

IPPOLITO YOUNGELOOD TEEPS L

DUBE REG OPR TEDESCO REGAN LEE L

M & REGION (2)

LONG PROJ LEADER MAIGRET L

INFO MORRIS LAINAS SHAFER F&M C. MILES.

STEELE BENAROYA HARLESS v0twzR a o n 2 n n 79/.

/8, o me m riar.DTsTRTm m ON

^

~

1-IOCAL PDR Sacremento, Cal.

W 1-DIIE(ABERNATHY)

(1)(2)(9)-NATIONAL LAB'S

.~1-NSIC(BUCHANAN) 1-FDR-SAN /DtpNtk l-ASLB-YORE /SAYRE 1-R. CARROLL 'C, GT-B227 1-GERALD TIT.rOUCE l-R. CATLIN,E-256-GT' BROCKHAVEN NAT. LAB WODWARD/H ST.

16-CYS ACES HOLDING 1-CONSULTANI's 1-AGMED(WALTER K0 ESTER, NEWMARK/BLUME/AGABIAN RM C-427, GT) 1-GERLAD ULRIKSCN....ORNL

1. RD... MULLER...F-309GT y---

t

e keigulitcry ria Cyp I

SACRAMENTO MUNICIPAL UTILITY DISTRICT O 67J1 S Street, Box 15830, Sacramento, California 95813; (916) 452-3211 April 27, 1973

,s

\\

  • :?

~

w3

. =,

Mr. Angelo Giambusso T'%*h, Deputy Director for Reactor Projects Directorate of Licensing

, 4' U. S. Atomic Energy Commission Washington, D. C.

20545 Rancho Seco Nuclear Generating Station No.1 AEC Docket No. 50-312 Licensing Schedule

Dear Mr. Giambusso:

In your latter of April 4,1973, you requested that we review the important milestones in the licensing a che **tle to assure that the District's required submittals havs been realisti-cally scheduled.

Specifically, the licensing schedule required an Interim Response on Fuel Densification by April 2, 1973 and a three part response to The High Energy Line Question consisting of a review, analysis and identification of problems and solutions on April 16, 1973, followed by an Interim Report on May 1, 1973, and a fully detailed analysis by June 15, 1973.

Our review indicates that the first two items were com-pleted as scheduled, the Interim Report will be mailed on schedule, and that it is realistic to expect completion of the fully detailed analysis by June 15, 1973.

-h,e ---

N Sincerely yours, g

w

,Ac 00CKETEDs

p
    • L luf14

,b'.MO N Y-E. K. Davis General Manager t

VN qy, y

i C5.20 ah E L E C T R I O. S Y S T E '.' 3ERVtNC *' ORE THA*J 600.'C0

'i T + f

,FAR!

1

' 's - % -

.