Forwards Insp Rept 50-312/71-02 on 710322-25.No Noncompliance Noted
ML19317F810
Person / Time
Site: Rancho Seco
Issue date: 04/20/1971
From: Spencer G
US ATOMIC ENERGY COMMISSION (AEC)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19317F811 List:
References
12261, NUDOCS 8002210568
Download: ML19317F810 (2)


Text

.

7.

h UNITED STATES

l. l

' ATOMIC ENERGY COMMISSION

?

oivislON Ofr COMPLIANCE J

RsGION V i

s111 BANCROFT WAY BsRetsLky, CALIFORNIA 94704 ru m.m.s. est-sian Eisf. SSt April 20, 1971 J. B..Henderson, Chief Reactor Construction Branch i

Division of Compliance, Headquarters SACRAMENTO MUNICIPAL UTILITY DISTRICT (RANCHO SECO)

DOCKET No. 50-312 The attached report by our field inspectors of an unannounced visit to the s'ubject construction site on March 22-25, 1971 is forwarded for information.

No significant safety problems or deficiencies were identified during the i

inspection.

Items reviewed included Nonconforming Reports not previously reviewed, the QC program for "other Class I Components" (PI-3800 and PI-4900), the QC program for independent verification that electrical and instrument cables meet design criteria, and r2 cords of-essential variables during welding operations. The proposed inspection of the construction of a site-fabricated pressure vessel was not-possible since the contractor for Class I vessels will not be on-site until July, 1971.

4 4

The need.to activate the Management Safety Review Conunittee was again emphasized to SMUD management.

'Mr. Connelly agreed that it would be prudent j

to activate the Conunittee and, as a start, review and approve the proposed technical specifications..

[:

Information obtained during the inspection indicates that SWEPCO TUBE CORPORATION has established procedures for the " rapid" air cooling of stain-less steel pipe, iThe. pipe is required to be " black" within three minutes.

-SWEPCO's statement of practice and a photomicrograph were subsequently obtained ifor review from SMUD. This information was discussed with Messrs. W. J.

Collins and R.'W. Reinmuth, CO:HQ on April 13, 1971.,Mr. Collins stated

.that the etch used will show general structure arrangement but is not considered r

-appropriate to show carbide precipitation'in the grain-boundaries. Striecher's-

~ Reagent-is recommended for this. application and should be applied electrolyti-feally. Further, the magnification shcald probably be 750X or 1000X rather L

than 100X. lMr. Reinmuth stated.that he felt the practice of air quenching l

was being used.by the industry. However, in view of our information, he thelieves that a vendor inspection would be appropriate for the purpose of.

5[h'7/

~

V Def 4f%

q sM[

pos&

M 1,?.261

)

(

4 T.

~

2-reviewing quenching practices and subsequent checks to ensure that the stainless steel pipe had not become sensitized. We have informed SNUD that we still-consider this to be an open item.

M. Jackson stated that he would r

discuss our concerns regarding the testing procedure with Bechtel's antallurgists_and would act accordingly.

1 b

G. S. Spencer Senior Reactor Inspector j

Enclosure:

CO Rpt. No. 50-312/71-2 by R. T. Dodds cc w/ enc 1:

)

l E. G. Case, DRS. (3)

(

P. A. Morris, DRL.

R. S. Boyd, DRL (2)

R. C. DeYoung, DRL (2)

D. J. Skovholt,1DRL (3)

P. W. Howe, DRL (2)

- -A.- Giambusso, CO L. Kornblith, Jr., CO-R. H. Engelken, CO 1

Regional Directors, CO REG Files i

+