,m c

TotEDO

%ms EDISON Docket No. S0-346 LawELL E. ROE Moe Pres dent Serial No. 278 po.

W198 2S&5242 May 17, 1977 Mr. Gaston Fiore11i, Chief f

Reactor Operations Branch, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

~

Dear Mr. Fiore111:

In response to your letter of transmittal, dated March 17, 1977, of NRC-01E Inspection Report 77-06 Toledo Edison herein offers the follow-ing:

Item:

To provide a schedule we will follow in implementing a Manage-ment Control System to assure the appropriate, periodic re-calibration of instruments used to determine compliance with Technical Specification requirements (including those covered by Section XI of the ASME Code). This refers to those instruments whose calibration requirements were not specifically delineated in the Technical Specifications.

Response: A preventative mainte ance program will be developed and im-piemented within nine months of the issuance of the Operating License to insure the appropriate periodic recalibration of instruments used to determine compliance with Technical Spec-ifications but whose calibration requirements were not spec-ifically delineated in the Technical Specifications.

Yours very truly, LER:dw g

THE TCLEDO EDtSON COMPANY EDISON PLAZA 300 MACISCN AVENUE TCLECO, CHIQ 43652 R 0 01150 7Q Q

MAY 2 31977