ML19317F533
| ML19317F533 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/22/1976 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| 124, NUDOCS 8001150847 | |
| Download: ML19317F533 (2) | |
Text
-
INRC tonu 195 U.S. NUCLE AR RECULATORY COM JION DOCKET NUMDE R
&-3Y$
(2 100 NRC DISTRIBUTION FoR PART 50 DOCKET MATERI AL TO:
FROM:
e DATE OF OOCUMENT Mr Stolz Toledo Edison Co 9-22-76 Toledo, Ohio DATE RECEIVED L E Roe 9-24-76 MLETTER ONoTORIZED PROP INPUT FORM NUMeER OF COPIES RECElVED MORIGINAL M U NC L ASSIFIE D OCoPY 1 signed DESCRIPTION ENCLOSU RE Ltr furnishing info Concerning tornado pos tulated related incidents...........
& advising that this info will ise inCorp-crated into a future FSAR revision by 10-15-76......
PLANT NAME:
Davis Besse #1 a
SAFETY FOR ACTION /INFORMATION ENVTRO 9-29-76 ehf I
I
/ Add 1badi.t AO:
V4 5 S4 M6 AOSEClCO ?.0:
dRANCH CHIEF:
M 8/2 I
BRANCH c!fTEF-
/
PROJECT MANAGER:
b r/-<
PROJECT MANAGER!
LIC. ASST.:
//.,'/-fo e LIC. ASST.!
/
INTERNAL DISTRIBUTION j
plC'3)P C FTT e J
SYSTEMS SAFETY PLANT SYSTTMs SITE SAFETY &
I NRC PDR HEINEMAN
/
TenEScn ENVIRO AN!Al'LSIS
/
I&E ( L-)
SCHROEDER BENAROYA DENTON & MULLER OELD LAINAS GOSSICK & STAFF ENGINEERING IPPOLITO ENVIRO TECH I
11IPC
/
MACCARRY KIRK'400D FRNST CASE KNIGHT BALLARD HANAUER
/
SIHWEIL OPERATING REACTCRS SPANCLER
_2 A R EJ S PA'4LICKI STELLO RTTE TFr1T_
PROJECT MANAGEMENT
_ REACTOR SAFETY OPERATING TECH.
/ CAMMTLL BOYD
/
ROSS EISENHUT
/
STrPP I
P. COLLINS NOVAK SHA0
/
H1'TRAN
,__HOUST_0N ROSZTOCZY BAER
[
PETERSON CHECK BUTLER SITE AN.ALYSIS o
MELTZ GRIMES
/
VOLIBER
\\
IIELTEMES AT & I
/
BUNCH SKOVUOLT SALTZMAN
/
- 3. COLLIUS RUTBMRC
/ V't PC FO EXTERNAL DISTRl0UTION CONTROL NUMBEH
/LPDR:F r. C I, n +., Cs NAT LAB:
BR_00}GIAEN_IIAT LAB
[ TIC:
REC. _ VIF.
ULRIKSON(ORNL) g_NSIC:
-LA.PDR g (p/
Q j
ASLB; CONSULTANTS I'
./_ _. A. CRS dC._Y_S -HM1tINC'/.':i33T~N TA # /M?
g C.W,Uu mn o.,n i g () U 1 1
H3LEDO
%mus EDISON LOWELL E. RCE vice pres. dent Docket No. 50-346 5 =c** ** C '+=~ai 4
q'.?ta s2ra
~
September 22, 1976 Serial No. 124
?>"
S5h:.
' ~
' : 3 a --
Director of Nuclear Regulation Attn:
Mr. John F. Stolz, Chief
' 9' '
Light Water Reactors Branch No. 1
- ~
Division of Project Management
.j e ', ~
United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Stolz:
Ihe desire for additional information concerning the design requirements for the Borated Water Storage Tank (BWST) was identified in discussions held on September 21, 1976 between Mr. E. C. Novak, Toledo Edison General Superintendent, Power Engineering and Construction, and Mr. Leon Engle, NRC Licensing Project Manager. That following information is provided, and will be incorporated into section 6.3.3.2 in the next revision to the FSAR, tentatively planned for October 15, 1976. We understand that this advance information will allow timely disposition of this review item.
The BWST is not required to take the Davis-Besse Unit 1 to cold shut-down following a postulated tornado. In going to cold shutdown, the reactor coolant contracts 3166 cubic feet. This " void" can be filled with water which is available from the boric acid addition tank, the makeup tank, the core flood tanks and the pressurizer, all located within seismic Class I, tornado protected structures.
Yours very truly,
/
db c/1 l
., ti _. 0 THE TCLECO EDiSCN CCMPANY ECISCN PLAZA 3CO MAC3SCN AVENUE TCLECO. CHIO 43652