ML19317F528
| ML19317F528 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/22/1978 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8001150842 | |
| Download: ML19317F528 (2) | |
Text
7 3.
a e, w, REGULATORY INFORMATION DISTRIBUTION ~ SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-346 REC: STOLZ J F ORG: ROE L E DOCDATE: 06/22/78 NRC TOLEDO EDISON DATE RCVD: 06/28/78 DOCfYPE: LETTER NOTARIZED: NO COPIES RECEIVED LTR 1 ENCL 2
SUBJECT:
FORWARDING RESPONSE TO NRC REQUEST OF 09/30/77 CONSISTING OF REPT ENTITLED:
" FIRE CONFIRMATION TESTING OF CABLE TRAY PENETRATION SEALS IN CONCRETE WALLS UTILIZING SILICONE ELASTOMERS", DTD 05/26/78.
fM PLANT NAME: DAVIS BESSE - UNIT 1 REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL: g
- DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************
NOTES:
1.
SEND ALL AMENDMENTS TO J.
ROE FIFE PROTECTION (PRIOR TO ISSUANCE OF OL).
(DISTRIDUTION CODE BOO 2)
FOR AClIUN:
BR CHIEF LWR #1 BC**W/ ENCL PROJ MGR ENGLE**W/ ENCL LIJ WR#1 LA**LTR ONLY
.e INTERNAL:
REG FILFI*W/ ENCL NRC PDR**W/ ENCL 1 6- **LTR ONLY I & E**W/3 ENCL DIRECTOP. OPM**LTR ONLY DE YOUNG **LTR O'tLY VASSALLO**LTR ONLY DIRECTOR DSS **W/ ENCL AD FOR PLANT SYSTEMS **W/ ENCL AUXILIARY SYS BR**W/2 ENCL I & C SYSTEMS BR**LTR ONLY AD FOR QA & O**tTR ONLY QAB**W/ ENCL R.
MURANAKA**LTR ONLY HANAUER**W/ ENCL EXTERNAL:
LPDR'S PT.
CLINTON. OH**W/ ENCL TIC **W/ ENCL NSIC**W/ ENCL POWER SYS BR**W/ ENCL PLANT SYSTEMS BR**W/2 ENCL AD FOR SYS & PROJ**LTR ONLY DIRECTOR DOR **LTR ONLY OPERATOR LIC BR**W/ ENCL ACRS CAT B**W/15 ENCL DISTRIBUTION:
LTR 46 ENCL 36 CONTROL NBR:
NC: 2-L l
SIZE: 1P+47P THE END
- +**
8001150 [h
3 r
C A...
TOLEDO h EDISON June 22, 1978 LOWELL E. ROE
- u. p,.
s.ca.o..o.
-.a.
44191 259-$242 Docket No. 50-346 Operating License No. NDF-3 Serial No.
450 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz, Chief Light Water Reactors Branch No. 1 Division of Project Management United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
The enclosed two copies of the Toledo Edison Company Davis-Besse Nuclear Power Station Unit No. 1 report " Fire Confirmation Testing of Cable Tray Penetration Seals in Concrete Walls Utilizing Silicone Elastomers" are for your use.
This report is to comply with the request made in your letter of September 30, 1977 and its enclosure. This testing was directed at satisfying the two criteria set forth in the enclosure to your letter.
The subject testing in accordance with ASTM E-119 and enclosed report, confirm the capability of the Davis-Besse Unit 1 electrical penetration's fire retardant seals to effectively maintain the integrity of their respective fire barriers.
Very truly yours,
/
Enclosures bj d/7 7Mir?-
0 N
@4y/
TbE TCLECO EO! SON CCMPANY EDISON PLAZA 000 MACISON AVENUE TOLEDO. OHIO 43652
[,
((
..