O OPERATING DATA REPORT DOCKET NO.
50-344 DATE 6-2-80 COMPLETED BY C-C-
Anir TELEPHON50'-5 5'"i?
Ext 234 OPERATING STATUS Notes
- l. Unit Name:
Trojan Nuclear Plant May 1980
. 2. Report ~ng i;<riod:
1611
- 3. Licensed Thermal Power (MWt):
1216
- 4. Nameplate Rating (Gross MWe): _
1130
- 5. Design Electrical Rating (Net alWe):
1122
- 6. Maximum Dependable Capacity (Gross MWe',:
1080
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrict
.If Any:
This Month Yr to.Date Cumulative 744 3647 32855
- 11. Hours in Reporting Period 0
2422 1R7?n
- 12. Number Of Hours Reactor Was Critical 0
0 91 71 a
- 13. Reactor Reserve Shutdown Hours 0
2416.7 18044.s
- 14. Hours Generator On.Line 0
0 1508.7
- 15. Unit Reserve Shutdown Hours o
AR10A1A s5715041
- 16. Gross Thermal En rgy Generated (MWH) l 0
2203790 191Roons
- 17. Gross Electrical En.rgy Generated (MWH)
-2442 2092533 171258s2
- 18. Net Elcetrical Energ/ Generated (MWH) 0 66.3 sa.o
- 19. Unit Service Factor 0
66.3 59.5
- 20. Unit Availability Factor 0
91 1 u,
- 21. Unit Capacity Factor (Using i1DC Net)
O 50.8 ag.3
- 22. Unit Capacity Factor (Using DER Net) 0 1.0 27.8
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date and Duration of Eschi:
June 22, 1980
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved u
vi INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION (4/77) 8006110 M R
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
50-344 UNIT Troian 6-2-80 DATE COMPLETED 11Y
- c. c Bair TELEP110NE 503-556-3717 Ex.t. 234 MONTl!
May 1980 Y
DAY AVERAGE DAILY POWER LEVEL Di>Y AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
I 1
17
-2 2
-2 Ig
-2 3
-?
19
-2 4
-1 20
-2 5
-4 21
-4 6
-4 22
-5 7
-4 23
-5 8
-5
-2 24 9
-5
-2 25 10 26
-4 II
-?
27
-4 12
-3 28
-5 13
-4 29
-4 14
-3
-5 30 15
-1 31
-2 16
-2 1
INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the rep iriing month. Compute to the nearest whole rnegawatt.
- )
(9/77) e
_m sw r -
DOCKET NO:
50-344
- e DATE:
6-2-80 COMPLETED BY:
G. G. Bair TELEPHONE:
503-556-3717 Ext. 234
SUMMARY
OF OPERATING EXPERIENCE OPERATION:
The plant began and ended the month in Refueling mode.
The core reload was finished on 5-26-60.
Internals baffle plate joint water-jet impingement was confirmed to have taken place through joint gaps resulting in damage to one rod in each of two fuei-assemblies. The affected joint gaps were measured but were not repaired, due to technical problems and scheduling difficulties with the repair tool. The_two new fuel assemblies destined for the affected perimeter locations were modified to replace three fuel pins in each with dummy stainless-steel rod replacements.
Auxiliary building walls were determined to have less strength than had been assumed for seismic events.
MAJOR SAFETY-RELATED MAINTENANCE:
Work continued on improvement modifications to the Plant Security and Fire Protection systems.
Work continued on the removal for analysis of 29 steam generator D Row 1 tubes.
Work completed on Inservice Inspection of Class 1, 2, and 3 equipment.
Work continued on Local Leak Rate Testing.
Work completed on radiographic examination of feedwater lines for cracks.
Work continued on modification of piping systems restraints and supports.
Work continued on several TMI-related design modifications (RV head vent, RV water level, containment water level, post LOCA environment electrical equipment assessment, safe shutdown remote instrumentation and decouple switches, separate power supply to steam PORV and AFWP pressure instrument).
Work continued on masonry wall inspection, review and repair.
Work completed on MSIV inspection and modification.
Work began on finding and plugging tube leaks in steam generators A and B.
LICENSE CHANGES:
None MISCELLANEOUS:
Sizeable volcanic activity occurred at Mt. St. Helens on 5-18-80.
Though no lava has been discharged, the area north of the mountain was severely affected,by the blast, ash, and mud flow. No seismic movements,significant ash fallout, or mud flow has occurred at the Trojan site. Turbine-generator high and low pressure
. cell inspection and CV overhaul continued.