.PDR LPDR

. TIC NSIC 1 CENTRAL FILES GULF STATES UTIIaITIES CO.Z>1PANY oOS? OFFiOE 3OA 23". = S E A U ** O N

  • T E .* A S 777J4 AAEA cCOE 713 933-663' May 22, 1980 RBG - 7688 File Nos. G9.5, G9.25.1.1 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Commission, Region IV Office of Inspection & Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011

Dear Mr. Seyfrit:

River Bend Station Unit 1 Docket No. 50-458 Gulf States Utilities has completed its review of the potential 10CFR 50.55(e) reportable deficiency with regard to the diesel generator building concrete mat " cold joint". This I review indicated that the halting of the concrete placement l resulting from equipment failure at the main concrete batch plant I did not represent a breakdown in the Quality Assurance program, nor did it result in any significant safety problem. A structural analysis of the affected section of the mat indicated that this I unplanned construction joint does not impair the structural in-tegrity or performance of the mat.

Based on this review, Gulf States does not consider the diesel generator building concrete mat " cold joint" as a 10CFR 50.55(e) reportable deficiency. This concludes our response to this item.

Sincerely, E.

  • E. Linn Draper, Jr.

O- +-b '

l Vice President - Technology l l

ELD /WJR/mb d 80061101k6>8 ..