o (Il APPENDIX A NOTICE OF VIOLATION Mississippi Power and Light Company License No. CPPR-118 and CPPR-119 Grand Gulf Based on the NRC inspection March 4-7, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in correspondenc? to you dated December 31, 1974.
As required by 10 CFR 50.55(e), the holder of a construction permit shall notify the Commission within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of each deficiency found in design or construction which could adversely affect the safe operation of the nuclear power plant at any time during the life of the plant and submit a written report to the Commission within 30 days.
Contrary to the above, MCAR 49 dated April 13, 1979 identified nonconforming piping elbows delivered to the site for use in safety-related piping. The project QA manager for the architect engineer for the Grand Gulf facility had been notified of the deficiency by the vendor April 4, 1979. The NRC was notified of the deficiency approximately 13 days after a responsible licensee aget.t was informed of the deficiency and the written report was submitted an additional 33 days later.
This is a deficiency.