Part 21 Rept Re Misoperation of K-600S Circuit Breaker at Facility.Possiblity of Small Number of K-600S & K-DON600S Circuit Breakers Assembled W/Undersized Secondary Latch Bushing During 1969-77.Results of Tests EnclML19312E740 |
Person / Time |
---|
Site: |
Zimmer |
---|
Issue date: |
05/19/1980 |
---|
From: |
Rhoads E GOULD-BROWN BOVERI |
---|
To: |
|
---|
References |
---|
REF-PT21-80-227-200 NUDOCS 8006090478 |
Download: ML19312E740 (4) |
|
|
---|
Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20206S0841986-06-30030 June 1986 Part 21 Rept Re Possible Cut Wires in Wire Harness of Bbc Brown Boveri K600/K800 Circuit Breakers.Initially Reported on 860509.Safety Implications Listed.Gear Guard Designed to Prevent Cut Wires ML20129B2831985-07-0909 July 1985 Part 21 Rept Re Hk Control Device.Initially Reported by TVA in 850703 Morning Rept.Parts to Be Supplied for Completion of Insp/Adjusting Procedure Included in 830322 Part 21 Rept ML20080N0191984-02-10010 February 1984 Final Deficiency Rept S-18 Re Structural Steel Beam Nonconformances.Initially Reported on 840113.Due to Plan to Convert Facility to coal-fired Power Plant,No Further Action or Correspondence Planned on Item ML20086L7101984-02-0303 February 1984 Final Deficiency Rept,Item E-58 Re Flammability Control Unit Motor Control Terminal Cabinets.Initially Reported on 840104.Deficiency Determined Not Reportable Per 10CFR50.55(e) ML20079N2781984-01-17017 January 1984 Interim Deficiency Rept,Item M-104 Re Qualifications of Energy Absorbing Matl Used in Design & Const of High Energy Pipe Whip Restraints.Initially Reported on 831219.Test Procedure Development in Process.Next Rept Due by 840401 ML20079H3021984-01-16016 January 1984 Interim Deficiency Rept,Item E-50 Re Annunciator Sys Replacement Light Bulbs.Dimmer Rheostats for Lamp Circuits in Main Control Room Annunciator Sys Will Be Bypassed to Minimize Line Resistance & Maximize Short Circuit Current ML20079F8391984-01-10010 January 1984 Interim Deficiency Rept,Item M-67 Re Lack of Procedural Qualifications for Pipe Bends.Initially Reported on 821109. Post-qualification Program Completed for 35 Bends.Corrective Action Program Will Be Conducted ML20079E8101984-01-10010 January 1984 Final Deficiency Rept,Item E-53 Re Switchgear Wiring Diagram Discrepancies.Initially Reported on 830922.All Discrepancies Resolved.Deficiencies Not Reportable Under 10CFR050.55(e) ML20086G7551984-01-0303 January 1984 Interim Deficiency Rept,Item Q-14 Re Control of Design Specs.Initially Reported on 831013.Measures to Ensure That Approved Specs Issued as Controlled Documents in Progress. Final Rept Will Be Submitted Upon Completion of Activities ML20086N0421984-01-0202 January 1984 Final Part 21 Rept Re Potential Problem Concerning Radiography of Branch Connection Welds Covered by Reinforcing Pads.Welds at Byron,Braidwood & North Anna Acceptable.Weld 7 at Clinton Reradiographed ML20083J7521983-12-30030 December 1983 Interim Deficiency Rept,Item E-30 Re Lack of Installation Insp of non-Class IE Cables in Panels.Initially Reported on 821027.Analysis Identified 575 Deviations Requiring Rework. Final Rept Will Be Submitted Upon Completion ML20086G7071983-12-29029 December 1983 Interim Deficiency Rept,Item M-32 Re Incomplete Hydraulic Analysis of Control Rod Drive Piping.Verification of Installed Hardware Will Be Completed Under Plan to Verify Quality of Const Submitted 831216 ML20083F8281983-12-29029 December 1983 Interim Deficiency Rept,Item M-46 Re Turning Vane Failures in Essential HVAC Sys.Initially Reported on 820510.Design Mods Completed.Adequacy of Vanes Less than 30 Inches Wide in Elbows Will Be Verified ML20083F8481983-12-28028 December 1983 Interim Deficiency Rept,Item Q-12 Re Failure to Follow Procedure for Insp of Qa/Qc Rework/Repair Activities. Initially Reported on 830909.Hardware Will Be Inspected to Validate Design Drawings.Procedures Under Development ML20083J6451983-12-27027 December 1983 Interim Deficiency Rept S-10 Re Masonry Wall Const.Initially Reported on 830513.Reinsp & Corrective Action Program Will Be Selected Per Course of Action Approved by NRC on 831216 ML20083E1101983-12-14014 December 1983 Interim Deficiency Rept,Item E-47 Re Target Rock Solenoid Operated Valves Used in Essential Sys W/Excessive Space at End of Coil.Initially Reported on 830803.Replacement Kits on Order ML20082P6051983-11-30030 November 1983 Final Deficiency Rept,Item Q-10 Re Potential Defects in Catalytic,Inc QA & Const Programs.Initially Reported on 830812.Incidents Cited Not Representative of QA Program. Defects Not Reportable Per 10CFR50.55(e) ML20082P5551983-11-30030 November 1983 Interim Deficiency Rept,Item M-101 Re Itt Hydromotor Actuator Oil Seal Leakage.Initially Reported on 831102. Corrective Actions Will Proceed Under 831005 Program.Item Not Reportable Under 10CFR50.55(e) ML20082P8631983-11-29029 November 1983 Interim Deficiency Rept,Item E-39 Re Brown Boveri 125-volt Dc Control Device Failure on 6.9 Kv & 4.16 Kv Switchgear. Initially Reported on 830202.Insp & Adjustment of Applicable Circuit Breakers Continuing ML20082P8611983-11-29029 November 1983 Interim Deficiency Rept,Item Q-11 Re Failure to Implement QA Program Corrective Action Reporting Sys.Initially Reported on 830907.Procedures for Corrective Actions Developed Per FSAR Chapter 17.1.Next Rept Will Be Submitted by 840130 ML20082P6671983-11-29029 November 1983 Interim Deficiency Rept,Item M-96 Re Indeterminate Qualification of Cooperheat Per ASME Section Iii.Hj Kaiser Co QA Dept in Process of Performing Evaluation of Purchase Orders Re Acceptability.Final Rept by 840601 ML20082P5031983-11-29029 November 1983 Interim Deficiency Rept,Item E-35 Re Electrical Equipment Foundation Welding.Initially Reported on 831104.Paint Removal & Reinsp of Welds in Progress.Corrective Action Will Be Performed ML20082P4301983-11-29029 November 1983 Interim Deficiency Rept,Item M-54 Re Inadequate Qualification of Hydraulic Control Units.Initially Reported on 820726.Analysis of Proposed Mods to Units in Progress. Limited Scope Operability Testing to Be Performed ML20082H9041983-11-23023 November 1983 Interim Deficiency Rept,Item M-102 Re Nonconformance of Feedwater Line Seismic Analysis W/Reg Guide 1.29.Initially Reported on 831028.Evaluation Continuing.Followup Rept Will Be Submitted by 840224 ML20082E3371983-11-17017 November 1983 Interim Deficiency Rept,Item M-100 Re Warped Standby Liquid Control Sys Tank Mounting Flange.Initially Reported on 831021.Gap Will Be Filled W/Epoxy Grout to Restore Flange to Original Design ML20082D0131983-11-11011 November 1983 Interim Deficiency Rept Re Lack of Insp Personnel Qualifications.Qualifications of 252 Inspectors adequate,58 Inspectors Still Under Review & 47 Inspectors Not Certifiable.Followup Rept & Corrective Action by 840330 ML20081M3341983-11-10010 November 1983 Interim Deficiency Rept,Item M-72 Re Lack of QA Program for Fire Protection Sys Installation.Initially Reported on 821214.Proposed Fire Protection QA Program Developed. Followup Rept Will Be Submitted by 840220 ML20081M7591983-11-10010 November 1983 Interim Deficiency Rept,Item M-24 Re Seismic Qualification of 13 Essential Damper Actuator Mounting Brackets.Initially Reported on 801014.American Warming & Ventilation Analysis Delayed Until 831111.Next Rept Following Corrective Mods ML20082B8171983-11-10010 November 1983 Interim Deficiency Rept,Item Q-14 Re Inadequacy of Control & Distribution of Design Specs.Initially Reported on 831013. Applicable Procedures for Review,Approval & Distribution Will Be Revised.Next Rept Will Be Provided by 840105 ML20081M8471983-11-0909 November 1983 Interim Deficiency Rept,Item E-50 Re Annunciator Sys Replacement Light Bulbs.Initially Reported on 830823.Two Contact Blades in Drake 4390 Socket Produce Metal Shavings Causing Short Circuit.Circuits Will Be Redesigned ML20082C0681983-11-0909 November 1983 Interim Deficiency Rept,Item S-11 Re Structural Steel Bolting.Initially Reported on 830513.Comprehensive Reinsp Program for Accessible Connections Developed.Procedures Governing Rework Program Under Development ML20081M1431983-11-0808 November 1983 Interim Deficiency Rept,Item M-97 Re Jet Pump Instrumentation Welds.Initially Reported on 830922.Field Deviation Disposition Request 1120 Submitted to Document & Resolve Deficiency.Final Rept Will Be Submitted by 840316 ML20078R5081983-11-0808 November 1983 Interim Deficiency Rept,Item S-17 Re Main Steam Line Break Analysis.Initially Reported on 831020.Auxiliary Bldg Pressure Differential Resulting from High Energy Line Breaks Not Unacceptable for Masonry Walls.Final Rept by 840116 ML20081M6931983-11-0808 November 1983 Interim Deficiency Rept,Items E-20 & E-29 Re Adequacy of Cable Tray & Conduit Support Welding & Cable Tray Support Threaded Nelson Studs.Initially Reported on 820503 & 0928. Concurrence Requested for Procedural Development ML20081H6941983-10-27027 October 1983 Final Deficiency Rept,Item M-93 Re Improperly Supervised Fire Detection Circuits.Initially Reported on 830823. Inability to Verify Fire Detection Sys Unacceptable Condition ML20081F0871983-10-25025 October 1983 Interim Deficiency Rept,Item M-61 Re Fire Protection Piping Suspended from Essential Cable Tray Supports.Mods Stopped by 821112 Show Cause Order Immediately Suspending Const.Final Rept Will Be Submitted Upon Mod Completion ML20081F1121983-10-25025 October 1983 Interim Deficiency Rept,Item M-91 Re Overpressurization of HPCS Relief Valve 1E22F035.Initially Reported on 830818. Audit Finding Rept 83-19-05 Issued to Correct Defect. Followup Rept by 840518 ML20078M9971983-10-18018 October 1983 Interim Deficiency Rept,Item E-46 Re Lack of Type SIS Switchboard Wire Certification.Initially Reported on 830713. Sargent & Lundy Issued Design Document Change SLE-577 to Require Type SIS Wire for Future Use.Next Rept by 840131 ML20078N3621983-10-17017 October 1983 Interim Deficiency Rept,Item E-54 Re Misapplication of Control Circuit Fuses.Initially Reported on 830923.Incorrect Design Documentation Will Be Revised & Walkdown Program to Verify Fuses to Be Developed.Final Rept by 840531 ML20078L1391983-10-14014 October 1983 Interim Deficiency Rept,Item M-56 Re Inadequate Installation of Gamma Plugs in Accessible & Embedded Piping.Initially Reported on 820804.HJ Kaiser Co Completing Investigation. Final Resolution Expected by 840130 ML20080T0691983-10-12012 October 1983 Interim Deficiency Rept,Item M-97 Re Jet Pump Instrumentation Bracket Welds Not Installed to Design Requirements.Initially Reported on 830922.Of 30 brackets,24 Not Completely Welded.Next Rept Expected by 831121 ML20080R3171983-10-10010 October 1983 Interim Deficiency Rept,Item M-45 Re Intermediate Welder Qualifications.Initially Reported on 830430.Computerized Welding Info Sys Scheduled for Completion by 840215. Followup Rept Will Be Submitted by 840321 ML20078J2791983-10-10010 October 1983 Interim Deficiency Rept,Item E-35 Re Electrical Equipment Foundation Welding.Initially Reported on 830104.Const Insp Plans Developed for Surveillance of Paint Removal & Insp of Electrical Panel Mounting Welds.Next Rept by 831201 ML20078J4141983-10-10010 October 1983 Interim Deficiency Rept,Item E-20 Re Inadequate Cable Tray Hanger Insp.Initially Reported on 820503.Formal Submittal of Proposed Reinsp Program,Including Request for Relaxation of NRC 821112 Show Cause Order,Will Be Made by 831108 ML20080S2071983-10-10010 October 1983 Interim Deficiency Rept,Item E-53 Re Discrepancies in 4.16-kV Switchgear Wiring Diagram.Initially Reported on 830922.Evaluation Continuing.Followup Rept Will Be Submitted by 840120 ML20078J8271983-10-0707 October 1983 Interim Deficiency Rept,Item Q-12 Re Procedures for Insp of Rework/Repair Activities.Initially Reported on 830909.QA Personnel Developing Program to Require Verification of Repair/Rework for Closed 7000 Series Nonconformance Repts ML20080R0891983-10-0707 October 1983 Interim Deficiency Rept,Item Q-11 Re Failure to Implement QA Program Corrective Action Reporting Sys.Initially Reported on 830907.QA Dept Reorganized & Corrective Action Requests/Trending Group Established.Followup Rept by 831130 ML20086N2381983-10-0404 October 1983 Supplemental Part 21 Rept Re Radiographic Record Evaluation, Supplying Addl Data to 830624 Submittal.Records Show That 90 Degree Branch Connections Furnished to North Anna 1 & 2 Jobsites.No Nozzles Supplied to Zimmer.Related Info Encl ML20080Q4861983-09-30030 September 1983 Interim Deficiency Rept,Item M-96 Re Indeterminate Qualification of Supplier Per ASME Section Iii.Initially Reported on 820902.Corrective Action Request 471 Initiated by Hj Kaiser Co,Requiring Audit of Facilities & Program 1987-06-16
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20215G2441987-06-16016 June 1987 Part 21 Rept Re Failure of Load Sequencing Equipment Supplied in Aug 1977 During Scheduled Testing.Caused by Open Electrical Connection on One Crimp Lug.Since 1978,insulated Lugs Used on All Equipment ML20206S0841986-06-30030 June 1986 Part 21 Rept Re Possible Cut Wires in Wire Harness of Bbc Brown Boveri K600/K800 Circuit Breakers.Initially Reported on 860509.Safety Implications Listed.Gear Guard Designed to Prevent Cut Wires ML20129B2831985-07-0909 July 1985 Part 21 Rept Re Hk Control Device.Initially Reported by TVA in 850703 Morning Rept.Parts to Be Supplied for Completion of Insp/Adjusting Procedure Included in 830322 Part 21 Rept ML20091J1461984-05-31031 May 1984 Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co. W/Two Oversize Figures.Aperture Cards Are Available in PDR ML20080N0191984-02-10010 February 1984 Final Deficiency Rept S-18 Re Structural Steel Beam Nonconformances.Initially Reported on 840113.Due to Plan to Convert Facility to coal-fired Power Plant,No Further Action or Correspondence Planned on Item ML20086L7101984-02-0303 February 1984 Final Deficiency Rept,Item E-58 Re Flammability Control Unit Motor Control Terminal Cabinets.Initially Reported on 840104.Deficiency Determined Not Reportable Per 10CFR50.55(e) ML20079N2781984-01-17017 January 1984 Interim Deficiency Rept,Item M-104 Re Qualifications of Energy Absorbing Matl Used in Design & Const of High Energy Pipe Whip Restraints.Initially Reported on 831219.Test Procedure Development in Process.Next Rept Due by 840401 ML20079H3021984-01-16016 January 1984 Interim Deficiency Rept,Item E-50 Re Annunciator Sys Replacement Light Bulbs.Dimmer Rheostats for Lamp Circuits in Main Control Room Annunciator Sys Will Be Bypassed to Minimize Line Resistance & Maximize Short Circuit Current ML20079F8391984-01-10010 January 1984 Interim Deficiency Rept,Item M-67 Re Lack of Procedural Qualifications for Pipe Bends.Initially Reported on 821109. Post-qualification Program Completed for 35 Bends.Corrective Action Program Will Be Conducted ML20079E8101984-01-10010 January 1984 Final Deficiency Rept,Item E-53 Re Switchgear Wiring Diagram Discrepancies.Initially Reported on 830922.All Discrepancies Resolved.Deficiencies Not Reportable Under 10CFR050.55(e) ML20083J1651984-01-0606 January 1984 Rev 2 to Vols 1 & 2 of Environ Qualification Rept for Class IE Equipment ML20079E2621984-01-0505 January 1984 Quality Confirmation Program, Monthly Rept for Dec 1983 ML20086G7551984-01-0303 January 1984 Interim Deficiency Rept,Item Q-14 Re Control of Design Specs.Initially Reported on 831013.Measures to Ensure That Approved Specs Issued as Controlled Documents in Progress. Final Rept Will Be Submitted Upon Completion of Activities ML20086N0421984-01-0202 January 1984 Final Part 21 Rept Re Potential Problem Concerning Radiography of Branch Connection Welds Covered by Reinforcing Pads.Welds at Byron,Braidwood & North Anna Acceptable.Weld 7 at Clinton Reradiographed ML20091A2241983-12-31031 December 1983 Ohio Edison Annual Rept,1983 ML20091A2421983-12-31031 December 1983 Duquesne Light Co Annual Rept,1983 ML20091A2551983-12-31031 December 1983 Cleveland Electric Illuminating Co 1983 Annual Rept ML20083E4111983-12-31031 December 1983 Revised Audit of Program to Verify Quality of Const & Continuation of Const Plan ML20083J7521983-12-30030 December 1983 Interim Deficiency Rept,Item E-30 Re Lack of Installation Insp of non-Class IE Cables in Panels.Initially Reported on 821027.Analysis Identified 575 Deviations Requiring Rework. Final Rept Will Be Submitted Upon Completion ML20086G7071983-12-29029 December 1983 Interim Deficiency Rept,Item M-32 Re Incomplete Hydraulic Analysis of Control Rod Drive Piping.Verification of Installed Hardware Will Be Completed Under Plan to Verify Quality of Const Submitted 831216 ML20083F8281983-12-29029 December 1983 Interim Deficiency Rept,Item M-46 Re Turning Vane Failures in Essential HVAC Sys.Initially Reported on 820510.Design Mods Completed.Adequacy of Vanes Less than 30 Inches Wide in Elbows Will Be Verified ML20083F8481983-12-28028 December 1983 Interim Deficiency Rept,Item Q-12 Re Failure to Follow Procedure for Insp of Qa/Qc Rework/Repair Activities. Initially Reported on 830909.Hardware Will Be Inspected to Validate Design Drawings.Procedures Under Development ML20083J6451983-12-27027 December 1983 Interim Deficiency Rept S-10 Re Masonry Wall Const.Initially Reported on 830513.Reinsp & Corrective Action Program Will Be Selected Per Course of Action Approved by NRC on 831216 ML20083E1101983-12-14014 December 1983 Interim Deficiency Rept,Item E-47 Re Target Rock Solenoid Operated Valves Used in Essential Sys W/Excessive Space at End of Coil.Initially Reported on 830803.Replacement Kits on Order ML20083J1771983-12-0909 December 1983 Vol 1 of Environ Qualification Rept for Mechanical Equipment ML20083F9121983-12-0808 December 1983 Quality Confirmation Program, Monthly Status Rept for Nov 1983 ML20082P6051983-11-30030 November 1983 Final Deficiency Rept,Item Q-10 Re Potential Defects in Catalytic,Inc QA & Const Programs.Initially Reported on 830812.Incidents Cited Not Representative of QA Program. Defects Not Reportable Per 10CFR50.55(e) ML20082P5551983-11-30030 November 1983 Interim Deficiency Rept,Item M-101 Re Itt Hydromotor Actuator Oil Seal Leakage.Initially Reported on 831102. Corrective Actions Will Proceed Under 831005 Program.Item Not Reportable Under 10CFR50.55(e) ML20082P8631983-11-29029 November 1983 Interim Deficiency Rept,Item E-39 Re Brown Boveri 125-volt Dc Control Device Failure on 6.9 Kv & 4.16 Kv Switchgear. Initially Reported on 830202.Insp & Adjustment of Applicable Circuit Breakers Continuing ML20082P8611983-11-29029 November 1983 Interim Deficiency Rept,Item Q-11 Re Failure to Implement QA Program Corrective Action Reporting Sys.Initially Reported on 830907.Procedures for Corrective Actions Developed Per FSAR Chapter 17.1.Next Rept Will Be Submitted by 840130 ML20082P6671983-11-29029 November 1983 Interim Deficiency Rept,Item M-96 Re Indeterminate Qualification of Cooperheat Per ASME Section Iii.Hj Kaiser Co QA Dept in Process of Performing Evaluation of Purchase Orders Re Acceptability.Final Rept by 840601 ML20082P5031983-11-29029 November 1983 Interim Deficiency Rept,Item E-35 Re Electrical Equipment Foundation Welding.Initially Reported on 831104.Paint Removal & Reinsp of Welds in Progress.Corrective Action Will Be Performed ML20082P4301983-11-29029 November 1983 Interim Deficiency Rept,Item M-54 Re Inadequate Qualification of Hydraulic Control Units.Initially Reported on 820726.Analysis of Proposed Mods to Units in Progress. Limited Scope Operability Testing to Be Performed ML20082H9041983-11-23023 November 1983 Interim Deficiency Rept,Item M-102 Re Nonconformance of Feedwater Line Seismic Analysis W/Reg Guide 1.29.Initially Reported on 831028.Evaluation Continuing.Followup Rept Will Be Submitted by 840224 ML20082E3371983-11-17017 November 1983 Interim Deficiency Rept,Item M-100 Re Warped Standby Liquid Control Sys Tank Mounting Flange.Initially Reported on 831021.Gap Will Be Filled W/Epoxy Grout to Restore Flange to Original Design ML20082D0131983-11-11011 November 1983 Interim Deficiency Rept Re Lack of Insp Personnel Qualifications.Qualifications of 252 Inspectors adequate,58 Inspectors Still Under Review & 47 Inspectors Not Certifiable.Followup Rept & Corrective Action by 840330 ML20082B8171983-11-10010 November 1983 Interim Deficiency Rept,Item Q-14 Re Inadequacy of Control & Distribution of Design Specs.Initially Reported on 831013. Applicable Procedures for Review,Approval & Distribution Will Be Revised.Next Rept Will Be Provided by 840105 ML20081M7591983-11-10010 November 1983 Interim Deficiency Rept,Item M-24 Re Seismic Qualification of 13 Essential Damper Actuator Mounting Brackets.Initially Reported on 801014.American Warming & Ventilation Analysis Delayed Until 831111.Next Rept Following Corrective Mods ML20081M3341983-11-10010 November 1983 Interim Deficiency Rept,Item M-72 Re Lack of QA Program for Fire Protection Sys Installation.Initially Reported on 821214.Proposed Fire Protection QA Program Developed. Followup Rept Will Be Submitted by 840220 ML20082C0681983-11-0909 November 1983 Interim Deficiency Rept,Item S-11 Re Structural Steel Bolting.Initially Reported on 830513.Comprehensive Reinsp Program for Accessible Connections Developed.Procedures Governing Rework Program Under Development ML20081M8471983-11-0909 November 1983 Interim Deficiency Rept,Item E-50 Re Annunciator Sys Replacement Light Bulbs.Initially Reported on 830823.Two Contact Blades in Drake 4390 Socket Produce Metal Shavings Causing Short Circuit.Circuits Will Be Redesigned ML20078R5081983-11-0808 November 1983 Interim Deficiency Rept,Item S-17 Re Main Steam Line Break Analysis.Initially Reported on 831020.Auxiliary Bldg Pressure Differential Resulting from High Energy Line Breaks Not Unacceptable for Masonry Walls.Final Rept by 840116 ML20081M6931983-11-0808 November 1983 Interim Deficiency Rept,Items E-20 & E-29 Re Adequacy of Cable Tray & Conduit Support Welding & Cable Tray Support Threaded Nelson Studs.Initially Reported on 820503 & 0928. Concurrence Requested for Procedural Development ML20081M1431983-11-0808 November 1983 Interim Deficiency Rept,Item M-97 Re Jet Pump Instrumentation Welds.Initially Reported on 830922.Field Deviation Disposition Request 1120 Submitted to Document & Resolve Deficiency.Final Rept Will Be Submitted by 840316 ML20082K5321983-10-31031 October 1983 Quality Confirmation Program, Monthly Rept for Oct 1983 ML20083A1401983-10-28028 October 1983 Rev 25 to Natl Board Tasks Rept ML20081H6941983-10-27027 October 1983 Final Deficiency Rept,Item M-93 Re Improperly Supervised Fire Detection Circuits.Initially Reported on 830823. Inability to Verify Fire Detection Sys Unacceptable Condition ML20081F0871983-10-25025 October 1983 Interim Deficiency Rept,Item M-61 Re Fire Protection Piping Suspended from Essential Cable Tray Supports.Mods Stopped by 821112 Show Cause Order Immediately Suspending Const.Final Rept Will Be Submitted Upon Mod Completion ML20081F1121983-10-25025 October 1983 Interim Deficiency Rept,Item M-91 Re Overpressurization of HPCS Relief Valve 1E22F035.Initially Reported on 830818. Audit Finding Rept 83-19-05 Issued to Correct Defect. Followup Rept by 840518 ML20078M9971983-10-18018 October 1983 Interim Deficiency Rept,Item E-46 Re Lack of Type SIS Switchboard Wire Certification.Initially Reported on 830713. Sargent & Lundy Issued Design Document Change SLE-577 to Require Type SIS Wire for Future Use.Next Rept by 840131 1987-06-16
[Table view] |
Text
_ _ __ _ _ _ _ - -
ATTACWD IS A PART 21 REPORT FROM IE f%Il UNIT - ROOM 359E/W d- %.
PART21IDBfflFICATIONNO. R o ,.20-oog COMPANYt#E DATE OF LEITER Sh7/fo DOCKET NO, So - 3rr DATE DISTRIPHIED 5/J 9/ f o ORIGINAL REPORTd SUPPLBEffARY Z DISTRIBUTION:
~
REACTOR (R)[ FUEL CYCE & _
SAFEGUARDS (S) f%TERIALS(M)
NRR/DDR, DIRECTOR (2) AD/FFMSI- AD/SG-IE NRR/DPM DIRECTOR (2) NiSS/F0iS AD/ROI AD/RDI(2) REGIONS REGIONS AD/RCI IEFIES NRR/ DOR, DIRECT 0'R PEGIONS PDR M1SS/SG SS-881 IE FIES IfDR PDR CBffRAL FILES CENTRAL FIES-SS-396 LPDR
. CENTRAL FIES (CHRON) TERA
- PDR CalTf 016 FIES(CHRON)
IE FIES (2)
LPDR CENTRAL FIES 016 L0EB/MPA FIG 5715 CENTRAL FIES (CHRON)
LDEB/BPA- tiG 5715 E0D - IMBB-7602 CENTRAL FIES - SS-396 AE0D INBB-7602 LDEB/BPA IHB 5715
. AE0D IID3-7602 ACTION:
PRELIMINARY EVUALATION OF THE ATTACHED REPORT INDICATES LEAD RESPONSIBILITY FOLLGV-UP AS SH0hN BEL 0d:
~
LEE ER E HSS. [ 0]lLERE GD I 8'006090 Y7 '
FFMSI JyjS DOCUMENT CONTAINS '
POOR QUALITY PAGES "
, i
1%;?~~ayiL, -> GOULO-BROWN BOVERI r um.f+w (215) C26 700 Hay 19,1980 QyJQg ~~~
- h. S. Nuclear Regulatory Commission && M x005 Region III 5/S.4 50 -
799 Roosevelt Road ~ ~
Glen Ellyn, Illinois 60137 --- -
pgg At'.antio n: Mr. G. Flore li, Chief ,
~~
Reactor Construction and Enginccring
~
Support Branch --
~ ~ ~ ~
RE: Wm. H. Zimmer Nuclear Power Station - Unit 1~
Docket No. 50-538, Construerion Permit CPpR-RH,
. . . _ Report of 10CFR50.55(e) - Gould-Brown Boveri Type K-600s, 480 volt Electrically Operated -
Cincinnati Cas & Electric Letters to NRC ,
of m rch 28,1979 & April 19,1979 ...- -
U.ar Mr. Fiorellit In the referenced letters, Cincinnati Gas & Efectric reported the minnpctnrinn of a Could-Brnwn Bnveri K-6005 circuit breaker at their 7.iremer Nuclear Power S tation. it was reported that the circuit breaker secondary latch was hant;ing -
up ori 'the shunt trip, causing an inadvertent circuit breakcr closurc when the spring charging motor was energized. --
Corrective action, at this time, was to replace the five (5) nccondary latches that had undersized bushings. At the same time, a chim spacer was added behind the cagnetic latch to provide addi.tional clearance to the secondary latch.
A total of fiva (5) circuit breakers were reported to have this conditinn out of a total of 135. No other reports of a similar condition have been reported either prior to this time or subsequent to it.
As a follow up to this incident, Could-Brown Boveri has detem ned that there is a possibilf.ty that a small number of X-600S and K-DON 6005 circuit breakeru- -
were assembled with an undersized secondary latch bushing during the period betvcen 1969 and 1977. This condition hus a further limitation' ~such~ that the --
circuit breaker. must be electrically operated, it must he drawout and it must have a static trip device. - - - -
The undcrsized secondary latch bushing unuld not *cause a probicm nor would it result in a misoperation of the circuit breaker during normal operations with -~
the circuit breaker in the connected position. Also, the condition would not manifest itself unless tha circuit breaker is operated in a acquence that is not connidered to he normal.
MM 2 21880, l
A jent venture of I.T E imoeial Coroui tion and Bivm. Bavvii Pc*e< Dehvery. Inc.
~
l % 7 19. 1980 -> GUULO BROWN DOVERI
. Mr. C. Fiore111, Chief Reactor Construction and Engineering Support Branch U. S. Nuclear Regulatory Commission Region III Tents were conducted on a circuit breaker with a undersized secondary Intch to demonstrato that if a mechanical trip free operatinn is performed with the spring charging motor in the of f position and ' Anhnequently the charging nornr is energized that it would cause the circuit breaker to clone inadvertently.
This is caused by the secondary lutch hanging up on the magnetic lut ch housing.
i A simple ' c sequence has been devised to be:used during normal maintenance procedurer specifically check if this condition exists. It is as follows:
1.
~
Rack the circuit breaker to the tewt position.
- 2. Charge the closing uprings, if uncharged.
- 3. Turn off the charring motor switch.
- 4. Push in occhsnical trip button and huld.
- 5. Push mechanical close lever upward.
- 6. Release trip and close devices.
- 7. Turn on the charging motor switch.
- 8. Tnadvertent cloning vill result if the condition exists.
The. enclosed Addandum (T.B.-9.1.7-6 Taaue F. Pages 1 & 2) dated March 4,1980 provides more details on th19 0080 sequence and instructions for enrrcction, if required.
On March 26, 1980, Gould-Brown Buveri visited the Enrico Fcrmi Fowcr Plant No. 2, to verify that the test sequence procedure and prnecdure for correction, if required could be readily understood by jobsite personnel. This was veri-fled by permitting the jnhnite personnel to read and demonstrate, the lustrue-tions provided.
If a shim is required, contact the nearest Gould-Brown Boveri Salen Office.
~If you have any additional questions, please call me at 215-678-7660.
Very truly youro, GOULD-BROWN BOVER1 Switchgear Syste=v Divieion
<* e
. E. L RROADS, Nanager Quality Assurance Copy to K. P. Ehas Cincinnati Gas & Electric Co.
EWR/ rm
~2-e
.M CSUULUIBROWN BOVERI 4
~ ~
% s.
m.m ~.. n .u ,,1n I.B.-9.1.7-6 ISSUE F -
ADDENDUM 2, PAGE 1 MAECH 4, 1980 K-6005, K-DON 6005 FIELD TEST PROCEDURE CAUTION: REFER TO I .B.-9.1. 7-6 FOR CIRCUIT BRF2.KER . INSTRUCTIONS AND SAFETY PROCEDURES A. .This procedure is to be performed to determine if the secondary
. Close latch hangs up on the shunt trip device causing inadvertent closing of the circuit breaker at the completion of the closing springs charging. ,
- 1. . Rack out the circuit breaker to the test position.
2 Move the toggle switch to the "on" position to charge the closing springs.
- 3. Nove the toggle switch to the "off" position.
4 Perfom a trip free operation by holding the manual red trip button in and lifting the manual close lever to discharge the closing springs. (The breaker should not ,.
'closo)
- 5. Move the toggle switch to the "on" position to charge the-closing springs. Note at the end of the charging if the breaker inadvertently closed.
- 6. If the breaker closed during step 5, then it has failed and a .050 shim must be added per page 2 of this procedure.
- 7. If the breaker did not inadvertently close during Step 5,
- than Steps 3 thru 5 should be repeated twel.vc timcc without failure. A .050 shim must ba added if any failures occur.
B. If it was necessary to install a .050 shim, then repeat Steps 3 thru 5 twelve times to check that the breaker does not inadvertently close.
Alomt.errture of I.T.E imperiet Corporatioo and Bro.=q Be,eri Power Detemy,lnc,
-> GOULO-BROWN BOVERI o . I.B.-9.1.7-6 ADDENDUM 2, PAGE 2
, MARCH 4, 1980 PROCEDURS FOR ASSEMBLING SHIM. IN.K-600S, K-DON 600S
. BREAKER WITHOUT REMOVING THE OPERATING MECHANISM _
CAUTION: REFER TO ID-9.1.7-6 PAGE 10 FOR CIRCUIT BREAKER REMOVAL (DRAWOUT TYPE) BEFORE PROCEEDING.-
DISASSEMBLY
-1. Tilt breaker back, loosen wires by removing cicat 650441-D, from left side of breaker frame.
- 2. Remove relay', from bottom of breaker, by removing screws that
. hold relay. Do not disconnect wires.
- 3. Bloc'k jack bar open to move arm away'from mag-latch.
4 Enter through left side of breaker and remove three screws, 54341-E2, that hold the ma Slide mag-latch and shunt' trip g-latch awayto from the mechanism side plate.
mechanism frame.
Use carc not to disconnect spring, 650216-All, between primary latch and mag-latch.
. ASSEMBLY 3
- 1. Slide shim, 711917-B, in between mechanism side plate and mag-latch, and reattach mag-latch with longer screws, 54341-E3.
- 2. Tighten screws, making sure spring, 650216-All, is connected.
- 3. Replace parts in reverse order.